AD/CESSNA 206/43 Amdt 1 - Battery Vent System
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
View image in the official source
Cessna 206 Series Aeroplanes
AD/CESSNA 206/43
Amdt 1
Battery Vent System 8/86
Applicability: All Cessna Model U206G and TU206G aeroplanes with SCL Turbine PAC power plant converted in accordance with STC SA2353 NM.
Requirement: 1. Inspect the battery vent system for kinks or other blockages. Clear the vent system as necessary to provide adequate battery venting.
- Modify the battery vent system according to the requirements of Soloy Conversions Ltd S.B. 06-763.
Compliance: For Para 1: Within 5 hours time in service after 21 January 1986. For Para 2: Within 25 hours time in service after 21 January 1986.
Note: The inspection detailed in Para 1 may be accomplished by the pilot-in- command, in which case the precise AD reference shall be entered in a certification made on the Maintenance Release coincident with that for the daily inspection.
Background: 1. To prevent battery explosion resulting from ignition of battery vent gases.
- This Directive is amended to correct the STC reference.