The AD sets out a clear compliance path in five Requirements and delegates technical procedures to specified Cessna service bulletins. The following is a practical, source-grounded checklist and sequence that follows the AD’s text verbatim, organised for operational use. Operators and maintenance organisations must follow the AD requirements and the referenced service bulletins for the procedural details.
Step 0 , Establish applicability. Confirm whether the aeroplane is one of the models listed in Table 1 of the AD. Then determine whether either of the two applicability criteria is met:
- The aeroplane was initially delivered from the manufacturer between 1 January 1993 and 31 March 2008, unless the modification/rework required in AD/CESSNA 180/93 has been done and the aeroplane remains in compliance with that AD; or
- The aeroplane has a P/N 2013142-18 alternate static air selector valve installed as a replacement part anytime after 1 January 1993, unless AD/CESSNA 180/93 modification/rework has been done and the aeroplane remains in compliance with that AD.
If neither criterion is met, the AD does not apply. If either criterion is met, proceed.
Step 1 , Identify equipment fit and urgent timing. Determine whether the aeroplane is equipped for flight under instrument flight rules (IFR).
- If the aeroplane is IFR-equipped, the AD provides two alternative immediate actions (Requirement 2): 2a) inspect the alternate static air source selector valve within 10 days after the AD effective date; or 2b) fabricate and install the specified temporary placard "before further flight" after the AD effective date. Decide which path is operationally feasible.
- If the aeroplane is not IFR-equipped, the inspection required by Requirement 1 must be scheduled within the longer window of 100 hours TIS or 4 months after the effective date, whichever occurs first.
Step 2 , Follow the required inspection. The AD requires inspection "to assure that the part number identification placard is not obstructing the port." For the precise steps, use the applicable Cessna service bulletin:
- For single-engine aeroplanes: Cessna Single Engine Service Bulletin SB08-34-02, Revision 1, dated 6 October 2008, or SEB08-5 dated 13 October 2008 as applicable.
- For Caravan models: Cessna Caravan Service Bulletin CAB08-04, Revision 1, dated 6 October 2008.
- For multi-engine models: Cessna Multi-engine Service Bulletin MEB08-6, dated 13 October 2008.
Use the bulletin that applies to the aeroplane model. Do not substitute an inspection methodology that departs from the applicable service bulletin procedures without authorised alternative approval.
Step 3 , Implement the temporary placard procedure if required. If IFR-equipped and the inspection cannot be completed within 10 days, fabricate and install a placard that incorporates the following words using at least 1/8-inch letters: "IFR OPERATION IS PROHIBITED" and "USE OF THE ALTERNATE STATIC AIR SOURCE IS PROHIBITED." Install this placard on the instrument panel within the pilot’s clear view before further flight. This is Requirement 2b. Remember that if this temporary placard is fitted, Requirement 3 imposes a subsequent inspection within the 100 hours/4 months window.
Step 4 , Address any obstruction found. If the inspection (Requirements 1, 2a, or 3) finds that the valve port is obstructed by the part number identification placard, remove the placard from the valve body, discard the placard, and assure that the port is open and unobstructed. This must be done before further flight (Requirement 4). Follow the detailed removal and verification steps in the applicable Cessna service bulletin.
Step 5 , Remove temporary placard after inspection. If the temporary placard was installed under Requirement 2b, perform the inspection called for in Requirement 3 within the next 100 hours TIS or within the next 4 months after the effective date of the AD, whichever occurs first. After completing that inspection, remove the temporary placards installed under Requirement 2b before further flight.
Step 6 , Replacement valve installation limitation. If a replacement valve is needed, do not install a P/N 2013142-18 valve unless that particular valve has been inspected and the port found free from obstruction. This restriction applies for replacements installed after 10 days from the AD’s effective date (Requirement 5). Therefore, check spare valve stock and ensure inspection and removal of any obstructing placard prior to installation.
Step 7 , Use the service bulletins for procedural detail. The AD explicitly states that "The procedures required to accomplish this AD are detailed in" the listed Cessna service bulletins and cites the bulletin identifiers and dates. Obtain the relevant bulletin and follow its step-by-step procedures. If there is any uncertainty as to which service bulletin applies, select the bulletin that corresponds to the aeroplane model and configuration.
Step 8 , Timing adherence. Observe the AD’s compliance timing:
- Requirement 1 (non-IFR aeroplanes): within the next 100 hours TIS or within the next 4 months after the effective date, whichever occurs first.
- Requirement 2a (IFR inspection): within 10 days after the effective date of the AD.
- Requirement 2b (temporary placard): before further flight after the effective date if choosing placard option.
- Requirement 3 (inspection after placard): within the next 100 hours TIS or within the next 4 months after the effective date, whichever occurs first; after the inspection remove placards before further flight.
- Requirement 4 (remove obstructing placard): before further flight after the inspection that reveals obstruction.
- Requirement 5 (replacement valve installation): effective as of 10 days after the effective date; only install P/N 2013142-18 valves that have been inspected and found unobstructed.
Step 9 , Consider spares and supply chain. Inspect any P/N 2013142-18 valves held in spares inventory that were shipped from Cessna Parts Distribution in the period 1 January 1993 to 31 March 2008 as the AD’s Note 1 identifies that shipping window as the period during which affected parts may have been supplied. Do not install P/N 2013142-18 valves from stock unless inspected and found unobstructed in accordance with the AD.
Step 10 , Documentation and audit trail. Although the AD does not specify particular recordkeeping language, create and retain maintenance entries, inspection reports and records of placard fabrication and installation/removal. Document the part number verification of installed valves. Keep references to the Cessna service bulletin used to accomplish the procedure. Retained documentation will be essential to demonstrate compliance in an audit or incident investigation.
Step 11 , Cross-check with AD/CESSNA 180/93. Before treating an aeroplane as affected, verify whether the modification/rework required in AD/CESSNA 180/93 has already been done and whether the aeroplane remains in compliance with that AD. If the aeroplane is compliant with AD/CESSNA 180/93, that compliance may remove the aeroplane from the applicability of the present AD per its explicit language.
Step 12 , Keep abreast of related FAA or CASA advisories. The AD notes FAA ADs that relate to the condition, including FAA AD 2008-10-02 and FAA AD 2008-26-10 Amdt 39-15776 dated 15 December 2008. Monitor any subsequent FAA or CASA guidance or amendments that might refine the inspection procedures or compliance expectations.
In short, compliance requires verification of applicability, timely inspection per the AD and the applicable Cessna service bulletin, temporary placarding for IFR-equipped aeroplanes if an immediate inspection is not possible, removal and discard of any obstructing placard before further flight, cessation of installing uninspected P/N 2013142-18 valves as replacements, and thorough documentation of all actions taken.