What it does
This instrument is Amendment 1 to Airworthiness Directive AD/CESSNA 170/78, issued by the Civil Aviation Safety Authority (CASA) on 19 April 2007. It imposes mandatory inspection and corrective torque requirements on flexible fuel hose end fittings installed in certain Cessna 172R and 172S aircraft. The AD adopts by reference FAA AD 2007-08-03 (Amendment 39-15020) and the procedures contained in Cessna Service Bulletin SB07-71-01, Revision 1, dated 16 March 2007, and an appendix appended to the AD itself. Mechanically, the AD does two things. First, it expands the original applicability by adding specific serial number ranges for both the 172R and 172S models. Second, it provides a detailed step-by-step inspection and torque procedure in the appendix that goes beyond merely cross-referencing the Cessna Service Bulletin. The inspection applies to five or six specific fuel hose connections in the engine compartment, depending on whether the aircraft is equipped with the Garmin G1000 avionics system. For non-G1000 aircraft, the hose runs are: fuel strainer to engine fuel pump; engine fuel pump to fuel injector servo; fuel injector servo to fuel manifold valve; on turbo models, the injector servo to fuel flow transducer and fuel flow transducer to fuel manifold valve; and the fuel injector servo fuel return to firewall fitting. For G1000-equipped aircraft, the list omits the turbo-specific runs and adds a fuel injector servo to fuel flow transducer and fuel flow transducer to fuel manifold valve. The AD requires an initial inspection within five hours of time-in-service after the effective date of 25 April 2007. If any incorrect torque values are found, the operator must correct the torque before further flight. This is not a one-off check; the AD is a continuing airworthiness requirement that remains in effect for the life of the aircraft. An operator who subsequently replaces a hose or fitting must also comply with the torque requirements. The AD does not expressly provide for recurring repetitive inspections, but the background states that the intent is to detect and correct potential loss of fuel flow that could cause engine power loss or fire. The cost and downtime implications are immediate: within five flight hours the aircraft must be grounded for cowling removal, inspection, torque checking and reapplication of torque putty. If a non-hose end fitting rotates during the torque procedure, the AD requires total disconnection and potentially replacement of seals or fittings, significantly increasing repair time and parts cost. The AD does not require replacement of hoses unless the fittings cannot be correctly torqued or show damage; it is a torque verification and correction directive, not a mandatory replacement directive.