Several traps await operators and maintainers of C-212 aeroplanes under this directive. The most significant is the precise document revision requirement. The rework must use CASA Service Bulletin 212-32-21 Revision 2 dated 10 November 1987. The hydraulic modification must use SB-212-32-22 Revision 2 dated 28 July 1997. Using an earlier or later revision is non-compliance. Operators who perform the work “in accordance with” a later revision that includes additional changes may be in breach if the later revision is not explicitly allowed. The directive does not adopt revisions by reference to the latest revision; it fixes specific revisions.
The cable tension test can use either COM 212-172 Revision 4 or COM 212-173 Revision 3, but only those specific revisions. The operator must determine which applies. If the wrong document or wrong revision is used, the test is not compliant. The directive does not provide guidance on which COM document applies to which aircraft configuration. The operator must rely on the aircraft’s maintenance history or consult the manufacturer.
The phrase “unless previously accomplished” can lead to a false sense of compliance. Operators may assume that earlier NLG work satisfies the requirement, but that work must match exactly the specified bulletin revision. If the NLG was reworked using an earlier revision of the service bulletin, or using a non-CASA bulletin, the requirement is not met. The operator must trace records back to the specific bulletin.
The event trigger under Requirement 2 is “abnormal vibration of the nosewheel steering system”. The directive does not define “abnormal”. It relies on subjective assessment by the pilot or maintainer. There is no threshold, no vibration measurement standard. This creates uncertainty: a cautious operator may do a test after every slight vibration, increasing maintenance burden and downtime; a less cautious operator may dismiss vibrations as normal and miss a mandatory trigger. If an incident occurs, CASA may judge that a reasonable person would have considered the vibration abnormal, making the operator non-compliant retroactively.
The AFM revision requirement must include the exact statement as written. The directive allows inserting a copy of the AD. But the note says that if general revisions of the AFM include the same statement, the copy may be removed. The trap is that the general revision must include an “identical” statement. If the general revision uses slightly different wording (e.g., “perform” without quotes, or “initiate” instead of “initiate or 'perform'”), the limitation is not identical, and removing the AD copy would be non-compliant. Operators must compare the wording precisely.
Requirement 4 prohibits installation of an unmodified NLG from the effective date. This applies not only to new installations but also to re-installation of an existing NLG after removal. If an operator removes the NLG for other maintenance, they must ensure it is reworked before reinstallation, even if it was previously compliant. However, if the NLG was already reworked per (1)(a), it is fine. The trap is that an NLG that was never reworked cannot be installed even temporarily.
The compliance deadlines in the directive are not fully restated in the amendment. Amendment 2 changes the effective date and corrects wording but states that Requirement 1 remains “Before 30 May 2006” and Requirement 3 remains “Within 6 months after the effective date of the original issue”. For aircraft that entered the fleet after those dates, the deadlines have passed, meaning they must have been compliant at the time of entry, or now be non-compliant. New operators acquiring a C-212 must verify that Requirement 1 and 3 were accomplished before they took ownership. They cannot simply comply now because the deadlines are historical. The directive does not create a new deadline for new owners; it simply requires that the actions were previously accomplished. If not, the aircraft is grounded until the work is done, but the deadline in the directive is no longer enforceable as a future date; rather, non-compliance is a current condition.
Amendment 1 extended the compliance period for replacement of certain parts. But the extension was for “replacement of certain parts” not for the rework or modification. Operators may mistakenly think the entire compliance period was extended. They must read the background carefully to understand which parts were affected.
The directive references Spanish AD 01/02. That AD may have different compliance dates or additional requirements. Operators who rely solely on the Australian AD may miss a requirement that is incorporated by reference or considered part of the design standard. CASA could take the view that the Spanish AD is the underlying source, and any deviation from it is non-compliance. The interaction is unclear.
Finally, the directive does not provide an alternative means of compliance (AMOC) within its text. Operators who develop an equivalent solution must apply to CASA for an AMOC separately. This adds time and administrative burden.