AD/BN-2/41 Amdt 1 - Elevator and Flap Control Rods - Inspection
1AD/BN-2/41 Amdt 1 - Elevator and Flap Control Rods - Inspection
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/BN-2/41 Amdt 1 - Elevator and Flap Control Rods - Inspection.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Pilatus Britten-Norman BN-2 Series Aeroplanes
AD/BN-2/41
Amdt 1
Elevator and Flap Control Rods - Inspection NK
Applicability: All models.
Requirement: 1. Inspect elevator and flap control rods for corrosion and rectify in accordance with Britten Norman SB No. BN-2/SB.101.
2. Bonding clips and leads may be removed completely provided that:
(a) Radio system still performs satisfactorily; and
(b) Control rod fork end bearings are of all metal construction.
Note: If bearings are fitted with “plastic” inserts it will be necessary for the bonding clips and leads to be replaced.
Compliance: Within 100 hours time in service after 31 October 1977.