CTHIn ForceLegislation
AD/BELL 214/2 - Main Transmission Upper Planetary Carrier
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
AD/BELL 214/2 - Main Transmission Upper Planetary Carrier
Start here
Turn the raw legal text into a practical explanation grounded in AD/BELL 214/2 - Main Transmission Upper Planetary Carrier.
Multiply the high-power event total to date by 2; or
b. If the actual operating hours are known; and
If the type of operation is internal load lift operations only, multiply each operating hour by 7;
ii. If the type of operation involves any external load lift operations and the number of external load lift operations is known, use table 1 and multiply the appropriate factor for the average number of external load lift operations by the number of actual operating hours;
iii. If the type of operation involves any external load lift operations, and the number of external load lift operations is unknown, multiply each actual operating hour by 21; or
iv. If the type of operation is unknown, multiply each actual operating hour by 21.
c. If the actual operating hours are unknown:
Assume 900 operating hours per calender year. Prorate the assumed operating hours for partial years;
ii. Calculate the RIN based on the assumed hours and using the criteria specified in requirement b) i through iv, substituting assumed hours for actual operating hours.