What it does
This airworthiness directive (AD/BEECH 95/26 Amdt 4) imposes mandatory inspection, removal, and replacement requirements for the wing attach bolts, washers, nuts, and fittings on all models of the Textron Aviation (formerly Beechcraft) 95 series aeroplanes, commonly known as the Travelair. It creates three distinct physical obligations with different compliance periods.
Requirement 1 mandates a visual inspection every 12 calendar months of the wing attach fitting recesses, the drain holes, and the visible portions of the bolts and nuts. The operator must check for corrosion, loss of inhibitor, and drain hole blockages that could trap water or debris. If visible corrosion is found in the recess or on any accessible part of the bolt, nut, washer, or fitting, then Requirement 2 must be completed before the aircraft flies again. This creates an immediate grounding trigger tied to a visual check, not a scheduled removal.
Requirement 2 requires the physical removal and inspection of the wing bolts, washers, and nuts in accordance with Beechcraft Shop Manual 95-590001-1C Revision C6, Section 4, as that manual existed on the commencement date of the AD (19 July 2022). The compliance interval for this removal inspection depends on the operational category of the aircraft. For aircraft used only in private operations, the first inspection must occur within 100 hours time in service (TIS) or 12 months from the commencement date, whichever comes first, unless the inspection was already done within the previous 10 years from the date of installation of the wing bolts. Thereafter, re-inspection must occur at intervals not exceeding 10 years from the previous inspection. For all other operational categories (such as charter, aerial work, training, or any non-private use), the first inspection must occur within 100 hours TIS or 12 months from commencement, unless already done within the previous 5 years from installation. Subsequent re-inspections must occur at intervals not exceeding 5 years from the previous inspection. Critically, Notes 3 and 4 provide that “installation of the wing bolts includes where they are removed for inspection purposes and re-installed.” This means that each time the bolts are removed and replaced, the compliance clock resets, and the next removal inspection is due from that date, not from the original installation.