Identify affected aeroplanes and parts: Check the aircraft register and maintenance records to identify Beechcraft 77 aeroplanes with serial numbers WA-1 through WA-312. For each aircraft, inspect wiring and breaker panels and/or review maintenance logs to determine whether any circuit breaker toggle switch with P/N 35-380132-1 through 35-380132-53 is installed. The Directive's "Applicability" statement is the operative trigger: the AD applies where those P/Ns are present.
If previously accomplished, retain evidence: The Directive expressly allows credit for prior accomplishment: "Unless previously accomplished, replace all circuit breaker toggle switches ..." Operators who completed RAC SB 24-3735 (Issued August 2005) prior to this Directive must retain and be prepared to produce records that demonstrate the work complied with the RAC SB or an FAA-AMOC-approved revision. Practical compliance steps include documenting the SB reference, notation of replaced part numbers in the logbook, a maintenance release certifying conformity to the SB, invoices for parts installed showing improved P/Ns, and any ancillary test or bench records.
Carry out replacement per RAC SB or FAA-AMOC revision: For aircraft requiring action, carry out the replacement "as specified in Raytheon Aircraft Company (RAC) Recommended Service Bulletin SB 24-3735, Issued: August 2005." If relying on a later revision of the SB, ensure that revision is "approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2008-13-17," because the Directive accepts only FAA-AMOC-approved later revisions as acceptable for compliance. Record the edition of the SB used and any AMOC reference.
Observe the compliance window: Requirement 1 must be completed "Within the next 24 months after the effective date of this Directive" (the Directive "becomes effective on 25 September 2008"), so replacements must be completed by 25 September 2010 unless previously accomplished. Plan work scheduling and parts procurement to meet that deadline. Where aircraft cross international jurisdictions or operate under foreign ADs with different deadlines, reconcile those obligations with this Directive’s timeline; do not assume equivalence without checking the specific AD texts.
Do not install older P/Ns as initial fit or spare: Requirement 2 is a continuing prohibition: "Circuit breaker toggle switches P/N 35-380132-1 through 35-380132-53 may not be installed on any aeroplane as an initial fit or as a replacement spare." Institute a parts-control measure to prevent inadvertent use of those P/Ns on affected Beech 77s. Quarantine or re-tag any inventory of the older P/Ns and update procurement specifications to source only the improved P/N range (35-380132-61 through -113) for the affected fleet.
Document each replacement comprehensively: Create or update a maintenance entry/logbook entry for each aeroplane recording the replacement, including date, aircraft serial number, removed P/Ns, installed P/Ns, RAC SB reference (including issue date), the name of the maintenance organisation or engineer performing the work, and any FAA AMOC cross-reference if a later SB revision was used. Even though the Directive does not prescribe a records format, the Directive’s allowance for prior accomplishment makes good traceability essential.
Coordinate with parts suppliers and maintenance providers: Provide suppliers and contracted maintenance organisations with a copy of the Directive and the RAC SB reference so they understand the prohibition on older P/Ns and the acceptable replacement P/Ns. Confirm availability of P/N 35-380132-61 through -113 and lead times for procurement. If a maintenance provider proposes an alternative technical method, ensure the proposed method is authorised by an FAA AMOC to FAA AD 2008-13-17 before relying on it as compliant.
Verify compliance and readiness before flight: The Compliance note for Requirement 2 specifies "Before further flight after the circuit breaker toggle switch has been replaced in accordance with Requirement 1." Practically, ensure that after replacement and before the aircraft's next flight, maintenance release, functional checks and any necessary inspections have been completed and recorded in the aircraft’s maintenance documentation.
Monitor for later SB revisions and AMOC approvals: If a later RAC SB revision becomes available, check whether the FAA has approved that revision as an AMOC to FAA AD 2008-13-17. If so, that revision is "considered acceptable" under this Directive. Maintain a process to monitor FAA AD and AMOC publications to capture any acceptable procedural updates.
Retain records for future oversight: Given the Directive’s allowance of prior accomplishment and the absence of specified enforcement mechanisms in the text, retain comprehensive records demonstrating compliance for the foreseeable period. Good records reduce the risk of administrative uncertainty if CASA queries an aircraft’s compliance status.
Plan for cross-jurisdictional operations: If an aeroplane operates under or into jurisdictions where the FAA AD timing differs, operators should ensure that they meet all applicable AD timelines. The CASA Directive’s timing differs from the FAA’s; reconcile multi-jurisdiction compliance in operational planning and maintenance scheduling.