AD/BEECH 60/19 - Moisture Barrier Fuselage Station 306.421
1AD/BEECH 60/19 - Moisture Barrier Fuselage Station 306.421
Start here
Get a plain-English read of 1
Turn the raw legal text into a practical explanation grounded in AD/BEECH 60/19 - Moisture Barrier Fuselage Station 306.421.
meta-content-style-type: text/css meta-content-type: application/xhtml+xml; charset=utf-8 meta-generator: Aspose.Words for .NET 22.10.0
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Beechcraft 60 (Duke) Series Aeroplanes
AD/BEECH 60/19 Moisture Barrier Fuselage Station 306.421 11/72
Applicability: All models.
Requirement: To prevent possible interference with elevator movement, accomplish the following:
Starting at the cutout for the elevator bell crank, slit the moisture barrier vertically upward using a knife, razor blade or similar tool. Extend this cut through the “velcro” strip which attaches the moisture barrier to the front spar of the horizontal stabiliser.
Note: In making the slit do not damage the spar.
Compliance: Within 25 hours’ time in service after 3 November 1972 unless already accomplished.