AD/B767/55 - Centre Fuel Tank Override Pumping Unit Diffuser Assembly
© 2026 Zoe. All rights reserved.
Zoe is a legal information platform. Always consult the Federal Register of Legislation for authoritative text.
AD/B767/55 - Centre Fuel Tank Override Pumping Unit Diffuser Assembly
Start here
Turn the raw legal text into a practical explanation grounded in AD/B767/55 - Centre Fuel Tank Override Pumping Unit Diffuser Assembly.
?xml version="1.0" encoding="utf-8" standalone="no"?>
COMMONWEALTH OF AUSTRALIA (Civil Aviation Regulations 1998), PART 39 - 105 CIVIL AVIATION SAFETY AUTHORITY
SCHEDULE OF AIRWORTHINESS DIRECTIVES
Image unavailable in extracted text Boeing 767 Series Aeroplanes
AD/B767/55 Centre Fuel Tank Override Pumping
Unit Diffuser Assembly
Applicability: Model 767 line number 1 through 359, 361 and 362. Requirement: Action in accordance with Boeing Alert SB 767-28A0036.
Note: Sundstrand Alert SB 5006286-28-A4 refers.
Compliance: Prior to 31 May 1991.
7/91
TX
Background: On certain S/N override pumping units the brazed joint attaching the diffuser ring to the diffuser sleeve may separate. If this occurred during a dry pump operation an ignition source may occur within the centre tank.