Step 1: Identify applicability. The operator must verify that the aircraft is a Boeing 767‑200 series (not the 767‑300 or other variant) and that the auxiliary fuel tank installed bears STC ST00840NY. Check the aircraft’s modification records. If no such STC is installed, the AD does not apply.
Step 2: Submit the report under Requirement 1. Use the fax number provided in the AD: (02) 6217 1914 (note this is a Sydney number, likely changed since 2009). Alternatively, submit by correspondence to the Manager, Systems and New Technologies, Airworthiness Engineering Group. The report must include the aircraft registration, the STC number, and usage frequency. The usage frequency can be annualised from operator records for the preceding 12 months or a representative period. If data is unavailable, note that in the report. Complete and send within 45 days of 15 January 2009 - i.e., by 1 March 2009.
Step 3: Develop a deactivation procedure. Use Appendix A as a template. Address all 11 criteria. The procedure should include: (a) permanent draining and vapour clearing of the auxiliary tanks; (b) disconnection and stowage of FQIS, fuel pump, and float switch wiring; (c) disconnection and capping of pneumatic connections (if present) at the pneumatic source; (d) disconnection and capping of fuel feed and vent plumbing at the aeroplane OEM tank side, using methods equivalent to AC 25‑8; (e) leaving the auxiliary tank vent lines open and secured; (f) pulling and collaring all circuit breakers for the auxiliary tank; (g) revising weight and balance document (if required) and submitting that to CASA for approval; (h) amending the AFM to remove the STC supplement and insert a copy of this AD, adding a placard in the flight deck that “AUXILIARY FUEL TANK DEACTIVATED”; (i) amending the maintenance manual to remove auxiliary tank procedures; (j) performing leak checks and pressure checks to confirm original fuel systems are unaffected; (k) revising ICA as needed; (l) adding any operator‑specific steps.
Step 4: Submit the proposed procedure to CASA for approval. Address to the Manager, Systems and New Technologies, Airworthiness Engineering Group, with sufficient lead time before the deactivation deadline. Include supporting drawings, schematics, or engineering analyses for any deviation from Appendix A.
Step 5: Obtain CASA approval. Keep the approval letter or email with the aircraft records. Do not begin deactivation until approval is received.
Step 6: Execute deactivation. Coordinate with maintenance. Use an appropriately licensed aircraft maintenance engineer. Follow the approved procedure exactly. Document each step with sign‑offs. Conduct the post‑deactivation checks.
Step 7: Complete the documentation amendments. Update the weight and balance document and obtain CASA approval (if required). Amend the AFM. Insert a copy of the AD. Place the placard. Remove or archive the STC supplement from active manuals. Amend the maintenance manual.
Step 8: Return the aircraft to service. Issue a certificate of release to service (CRS) or equivalent. Ensure that all applicable leak checks and pressure checks are passed and recorded.
Step 9: Mandatory occurrence reporting. If any anomaly is found during deactivation (e.g., cracked fuel lines, corroded wiring), the operator must report it under the mandatory occurrence reporting scheme (regulation 4.01 of CASR Part 4).
Step 10: Maintain records indefinitely. Keep the approved procedure, CASA approval, deactivation records, AFM revisions, and weight and balance revision with the aircraft historical records. They will be needed for future audits, sale inspections, or if the aircraft is re‑registered in another jurisdiction that asks for compliance history.