What it does
This Airworthiness Directive (AD/B767/234) requires inspection and, where necessary, replacement of a specific time delay relay used in the cargo compartment fire-extinguishing system on specified Boeing 767 series aeroplanes. The AD applies to Model 767-200, 767-300 and 767-300F series aeroplanes identified in Boeing Special Attention Service Bulletin (SASB) 767-26-0131, dated 24 July 2006, and it became effective on 14 February 2008 (signature dated 10 December 2007). The directive sets three discrete mandatory actions.
First, Requirement 1 directs operators to carry out a general visual inspection, in accordance with SASB 767-26-0131, to determine whether the part number TDH6103-1804 time delay relay (K826) in the main equipment centre was manufactured during a specified date range. Second, Requirement 2 requires replacement of any relay found to be within that date range with either (a) a relay not manufactured within the specified date range, or (b) a relay tested by the supplier and found to be unaffected by thermal expansion, all in accordance with the SASB. Third, Requirement 3 prohibits installation on any aeroplane, as a replacement spare, of time delay relay P/N TDH6103-1804 that carries a date code between 0000 and 0343 and does not also carry an additional date code bearing the letter "T".
The directive sets compliance windows: Requirement 1 within 24 months after the effective date; Requirement 2 within 30 days after discovery of a relay in the specified date range; Requirement 3 is effective immediately as of the directive's effective date. The AD notes that later revisions of the SASB, if approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2007-23-08, are acceptable for compliance with the equivalent requirements of this directive. The document’s background explains the safety concern: an FAA report of a time delay relay failure in a Boeing Model 777 prompted testing, and similar relays are used in the cargo fire suppression system where their failure could delay discharge of secondary fire bottles and leave insufficient suppressant if the aircraft is beyond the relay delay time from a suitable airport.