Compliance with AD/B767/229 requires careful planning and documentation. The following steps outline a practical approach.
Step 1: Identify affected aircraft and determine line number. The operator must confirm that each Boeing 767 in the fleet is one of the affected models. Then find the Boeing line number (L/N) from the aircraft’s history records. This determines which compliance schedule applies.
Step 2: Obtain the current service bulletins. The operator must obtain Boeing ASB 767‑28A0077 Revision 1 (for Models 767‑200, ‑300, ‑300F) or Boeing ASB 767‑28A0081 Revision 1 (for 767‑400ER), both dated 8 July 2004. Also obtain Boeing ASB 767‑28A0088 or 767‑28A0089, both dated 24 February 2005, for the replacement. These bulletins contain the detailed procedures. The Hamilton Sundstrand bulletins are referenced as additional source data but are not required.
Step 3: Assess existing pump part numbers from records. For each main tank fuel boost pump, review the maintenance records to determine the P/N. If the P/N is conclusively shown to be 5006003D, that pump requires no initial or repetitive inspection, and it already satisfies the replacement requirement. Document the record reference in the aircraft logbook.
Step 4: Schedule the initial inspection (if not relieved by Step 3). For L/Ns 1‑914, the inspection must be completed within 12 months of 12 April 2007 (i.e., by 12 April 2008). For L/Ns 915 and on, the time depends on total flight hours as of the effective date. If the aircraft had more than 15,000 total hours, the inspection is due within 12 months of the effective date. If 15,000 hours or fewer, the inspection is due within 12 months after the aircraft accumulates 15,000 total hours. The operator must track flight hours and schedule accordingly.
Step 5: Perform the inspection. The inspection must be a detailed inspection as defined in Note 2. It involves checking for the presence of the flame arrestor, measuring its position, and performing any corrective actions specified in the Boeing ASB. All corrective actions must be completed before further flight. If the inspection was performed prior to the effective date using the March 2003 version of the ASB, that inspection meets the requirement. Document the inspection in the maintenance records.
Step 6: Determine the repetitive interval. Record the total flight hours at the time of the initial inspection. For L/Ns 1‑914, the repeat interval is 6,000 flight hours or 24 months, whichever comes first. However, if the aeroplane had 15,000 total hours or fewer at the initial inspection, the first repeat is due at the later of 12 months after the aircraft reaches 15,000 total hours or 24 months after the initial inspection. For L/Ns 915 and on, the same intervals apply from the date of the initial inspection. Set up a tracking system for each pump.
Step 7: Replace the pumps within 36 months. All left and right main tank fuel boost pumps must be replaced with new or modified pumps per the applicable Boeing ASB. This must be done within 36 months of 12 April 2007 (by 12 April 2010). The replacement can be done at any time earlier; if done before the initial inspection, it will make the inspection unnecessary for that pump. After replacement, no further inspection or measurement is required for that pump. The operator may replace left and right pumps separately, but all must be replaced within the 36‑month window.
Step 8: Restrict future installations. From the effective date onward, only pumps that have been inspected and corrected in accordance with Requirement 1, or pumps having P/N 5006003D, may be installed. This restricts the spare parts inventory. Operators must ensure that any replacement pump procured after the effective date meets this standard.
Step 9: Maintain thorough records. The AD requires documentation of the inspection, measurement, corrective actions, and replacement. For the optional terminating action, records must be sufficient to conclusively establish the P/N. All entries should be signed and dated by a LAME or other certifying authority.
Step 10: Monitor and comply with repetitive intervals. If the pump has not been replaced by the 36‑month deadline, the operator must continue to repeat the inspection at the required intervals until replacement. Even if the pump is replaced on month 35, the last inspection interval must be observed until the actual replacement. After replacement, no further repeats are needed for that pump.
Step 11: Consider harmonisation with FAA AD. Australian operators with FAA oversight should confirm that the same actions under the same deadlines satisfy both the FAA and CASA directives. Document compliance under both systems.
Step 12: Budget for cost and downtime. The detailed inspection and replacement require specialised labour and potential aircraft downtime. Parts (pumps) must be sourced in advance. The AD provides significant lead time, but late compliance can result in grounding.