CTHIn ForceLegislation
AD/B767/193 Amdt 1 - P37 Panel - Electrical Wire Bundles
Boeing 767 Series AeroplanesBoeing 767 Series Aeroplanes
Start here
Get a plain-English read of Boeing 767 Series Aeroplanes
Turn the raw legal text into a practical explanation grounded in AD/B767/193 Amdt 1 - P37 Panel - Electrical Wire Bundles.
Boeing 767 Series Aeroplanes
| AD/B767/193 Amdt 1 | P37 Panel - Electrical Wire Bundles | 11/2009 |
|---|
| Applicability: | Model 767 aeroplanes, line numbers 1 through 853 inclusive. |
|---|---|
| Requirement: | Requirement:1. Unless previously accomplished, carry out the following in accordance with Boeing Alert Service Bulletin (ASB) 767-24A0134 (for Model 767-200 and -300 series aeroplanes) and 767-24A0135 (for Model 767-400ER series aeroplanes), both Revision 1 and both dated 18 October 2001:a. Perform a one-time detailed visual inspection of the wire bundles located below the P37 panel to detect abrasion damage and wire installation discrepancies (including missing standoffs; missing, chafed, or loose cable clamps; chafed grommets; and wire bundles located beneath an insulation blanket).Note 1: For the purposes of this Directive, a detailed visual inspection is defined as:“An intensive visual examination of a specific structural area, system, installation, or assembly to detect damage, failure, or irregularity. Available lighting is normally supplemented with a direct source of good lighting at intensity deemed appropriate by the inspector. Inspection aids such as mirror, magnifying lenses, etc., may be used. Surface cleaning and elaborate access procedures may be required.”b. Relocate the wire support standoff.c. Install protective sleeving over the wire bundles.2. If any damage or other discrepancy is found during the Requirement 1.a. inspection, perform corrective action in accordance with the applicable ASB.3. Unless previously accomplished, carry out all actions in Work Package 2 of Boeing Alert Service Bulletin (ASB) 767-24A0134 (for Model 767-200 and-300 series aeroplanes) or ASB 767-24A0135 (for Model 767-400ER series aeroplanes), both Revision 1, as applicable, noting the following: |
| For Group 1 aeroplanes - the procedures in Work Package 2 include performing a detailed inspection to determine whether the location of the wire support standoff for wire bundle W298 is adequate and whether a grommet is installed and not damaged (e.g. chafed), installing a new grommet if not already installed or if the existing grommet is damaged, relocating the wire support standoff as applicable, installing protective sleeving over certain wire bundles, and installing wire bundle support clamps. When installing wire bundle support clamps, make sure that wire bundles are installed inboard/above the insulation blankets.For Group 2 aeroplanes - the procedures in Work Package 2 include performing a detailed inspection of the sleeving on wire bundles W298, W235, and W2130, as applicable, to determine the type of protective sleeving installed and the location of that sleeving, relocating the sleeving or replacing the sleeving with new sleeving as applicable, and installing wire bundle support clamps as applicable. When installing wire bundle support clamps, make sure that wire bundles are installed inboard/above the insulation blankets.For Group 1 aeroplanes, actions accomplished before 11 December 2001, per Boeing Alert Service Bulletin 767-24A0134 (for Model 767-200 and -300 series aeroplanes), dated 15 March 2001; or Boeing Alert Service Bulletin767-24A0135 (for Model 767-400ER series aeroplanes), dated 15 March 2001; as applicable, are acceptable for compliance with Requirement 3.Note 2: FAA AD 2004-05-07 Amdt 39-13501 refers. |
|---|