Compliance with this directive requires a systematic approach. The first step is to identify all aircraft in the operator’s fleet that are Boeing 767 series with General Electric CF6-80C2 engines. The directive does not apply to other engine types, so a fleet containing 767s with Pratt & Whitney engines would not be affected. Check the engine manufacturer and model on each aircraft’s type certificate data sheet.
The second step is to determine the modification status of each aircraft with respect to Boeing SB 767-78-0063 or its production equivalent. This requires reviewing the aircraft’s maintenance records to see if the modification has been embodied. Look for a logbook entry or an engineering order referencing SB 767-78-0063. If the aircraft was delivered new from the factory with the modification, check the delivery documents for a production equivalent functional test record. If the modification is not installed, the aircraft is in the unmodified category and the 1,000-flight-hour interval applies. If the modification is installed but no production test exists, the aircraft is modified but requires the initial test under requirement 1(b) (though the initial compliance date has passed; the operator must still perform the test if not already done, but the directive does not state a grace period for late initial compliance). Practically, if the initial test was missed, the operator should perform it as soon as possible and start the clock on the 6,000-hour repeat interval from that test.
The third step is to incorporate the DPV functional test into the aircraft’s approved maintenance program. The test must be scheduled at intervals not exceeding 1,000 flight hours (unmodified) or 6,000 flight hours (modified). The operator should choose a cycle that minimises disruption to revenue service, but the maximum interval is a hard limit. The test can be done on a calendar basis if flight hours are not accumulated rapidly, but the directive specifies flight hours, so the operator must track hours accurately.
The fourth step is to obtain the correct version of the service bulletin. The original directive references Boeing Alert SB 767-78-0084 dated 21 October 1999. The operator may use a later revision if and only if that later revision has been approved by the FAA as an AMOC to FAA AD 2000-17-06. To confirm this, the operator should check the FAA’s AD docket for FAA AD 2000-17-06, which lists approved AMOCs. The FAA’s AD website or a subscription service like the FAA’s DMS can be used. The operator should print or save the FAA’s approval notification. If using a later revision, note that the compliance period still runs from the original 2002 dates for initial compliance, but for recurrences, the interval is the same regardless of which SB revision is used.
The fifth step is to perform the functional test in accordance with the procedure. This will typically require the aircraft to be on jacks with hydraulic and pneumatic systems pressurised. The test should be documented in a maintenance release, noting the results and the SB revision used. If the test fails (leak detected), the operator must not release the aircraft to service until the leak is repaired in accordance with the Boeing 767 Maintenance Manual. The repair does not need to follow the service bulletin; the AMM is the specified reference. After the repair, the operator must perform the Requirement 1 functional test again. This retest should be documented as a separate action.
The sixth step is to maintain records of each test and any repairs. The records should be retained for at least the life of the aircraft, as CASA auditors may request them. An operator should also keep evidence of the FAA AMOC approval if using a later SB revision. A compliance status log for each aircraft, showing the date and hours of each test and the next due date, is recommended.
The seventh step is to stay alert for further amendments. CASA may issue additional amendments if new failure modes are discovered, or if Boeing issues a superseding SB. The operator should subscribe to CASA’s AD email notifications and check the FAA’s ADs for the 767 periodically. The directive’s acceptance of later FAA-approved revisions means that the operator can adopt new revisions without a CASA amendment, but only if the FAA has approved them as AMOC to the base AD. The operator must still verify that the revision addresses the DPV leak issue and does not introduce any conflicting requirements.
Finally, if the operator has a fleet that includes some aircraft that were previously modified and some not, a simple tracking system differentiating the two categories is essential to avoid applying the wrong interval. A single spreadsheet or airworthiness program module can handle this. The cost of getting it wrong could be a grounding if CASA discovers a test was due but missed, so the overhead of meticulous tracking is justified.