What it does
This instrument, Airworthiness Directive AD/B747/346 (8/2006), issued by the Civil Aviation Safety Authority (CASA) on 20 June 2006 and effective from 3 August 2006, mandates two sequential actions on Boeing 747-400 and 747-400F series aeroplanes equipped with certain Driessen Aircraft Interior Systems or Showa Aircraft Industries galleys. First, the operator must inspect each galley to determine whether any of the installed part numbers (P/Ns) appear in the list specified in Table 1 of the Directive. That table refers to Boeing Special Attention Service Bulletin 747-25-3264 (Revision 1, 11 November 2004) for 747-400 series and Boeing Service Bulletin 747-25-3275 (Revision 1, 4 April 2004) for 747-400F series. Instead of a physical inspection, a review of the aeroplane maintenance records is acceptable if the part numbers can be positively determined from that review. If the installed galley does not have a P/N listed in those service bulletins, no further action is required under the Directive.
The second requirement applies only where a galley with a listed P/N is found. In that case, the operator must replace the spiral protective wrapping of the electrical cables of that galley with new spiral protective wrapping that has been shown to meet specified flammability testing requirements. The replacement must be carried out in accordance with the applicable service information listed in Table 1. The Directive also provides a credit for previous accomplishment: if the spiral protective wrapping was replaced before the effective date of the Directive using the service information listed in Table 2 (the original issues of the same service bulletins, dated 15 March 2001), that replacement is accepted as compliance with the second requirement. The Directive notes that later revisions of the Table 1 service bulletins approved by the FAA as an Alternate Method of Compliance (AMOC) to FAA AD 2006-12-06 are also acceptable. The compliance time for both requirements is 72 months after the Directive's effective date, meaning operators had until August 2012 to complete the actions. The Directive itself does not impose any further recurring actions; it is a one-time inspection and, if necessary, one-time replacement.