Step 1, Confirm applicability. Consult Boeing Service Bulletin 747-25-3313 Revision 1 dated 15 May 2003 to determine whether a particular Model 747-200F or -400 series aeroplane is listed and therefore subject to the Directive (Applicability). Do not rely solely on model designation or vendor equipment tags without cross-checking the Boeing SB list and any aircraft-specific configuration notes.
Step 2, Acquire the mandated technical documentation. Obtain Boeing SB 747-25-3313 Revision 1 and, where relevant, JAMCO Service Bulletin CAW74-25-1697 dated 7 June 2002 for procedures to remove and install certain galley frequency converters (Requirement; Note 1). If considering the use of a later Boeing SB revision, confirm whether the FAA has approved that revision as an AMOC to FAA AD 2005-12-10; if the FAA has done so, that later revision is acceptable for compliance with the equivalent Requirements of this CASA Directive (Requirement; Note 2).
Step 3, Plan and schedule the modification within the compliance window. The Directive became effective on 1 September 2005, and compliance is required within 18 months from that date (Compliance). Operators must schedule the work so that it is completed before the end of the 18-month compliance window. Factor in lead times for parts procurement, spares allocation, maintenance docking and manpower, as the AD prescribes replacement of hardware.
Step 4, Perform the replacement work to the Boeing SB Accomplishment Instructions. The Directive requires replacement "in accordance with the Accomplishment Instructions of SB 747-25-3313, Revision 1" (Requirement). The Boeing SB will specify parts, modifications, removal and installation procedures, necessary inspections and any post-installation checks. For galley frequency converters where removal/installation procedures are distinct, consult the JAMCO SB as an additional procedural source (Note 1).
Step 5, Verify the modification outcome. Follow the Boeing SB’s prescribed validation and testing procedures to ensure the modified converters are correctly installed and that affected wiring and bundles are not subject to the overheating failure mode described in the Background. The AD text requires the action but delegates the precise verification steps to the Boeing SB.
Step 6, Record the work. The AD text does not state the recordkeeping requirements in the supplied file, therefore follow normal airworthiness maintenance record practices and any CASA or operator procedural requirements for recording AD compliance. Where an operator uses a later Boeing SB revision approved by the FAA as an AMOC to FAA AD 2005-12-10, retain the FAA AMOC approval documentation as part of the maintenance file to demonstrate compliance with the CASA AD via the accepted alternate method.
Step 7, Seek clarification or approvals if necessary. The AD text accepts FAA AMOC approvals for the equivalent Boeing SB revisions, but it does not describe CASA-specific AMOC procedures or waivers in the supplied document. If an operator proposes a different means of compliance not described in the Boeing SB or in an FAA AMOC approval, they should contact CASA for guidance on whether CASA accepts that alternative. The AD text itself does not set out processes for CASA AMOCs or deviations.
Step 8, Maintain awareness of parts and supplier instructions. The Directive requires "modified frequency converter(s)" without specifying part numbers or supply channels in the AD. Coordinate with Boeing and OEM/service providers such as JAMCO to source the correct modified converters, verify part compatibility, and ensure installation follows the Boeing SB instructions.
Step 9, Coordinate cross-jurisdictional compliance if the aircraft operates internationally. The Directive accepts FAA AMOCs to the FAA AD as equivalent, so where aircraft operate under multiple regulatory jurisdictions, document reliance on FAA approvals when using later Boeing SB revisions. Keep records of correspondence and approvals to support audits or regulatory inspection.
By following the steps above, an operator aligns with the Directive’s explicit prescription: replacing the specified frequency converters with modified versions and executing the work in accordance with Boeing SB 747-25-3313 Revision 1 or an FAA-AMOC-approved later revision, completed within the 18-month compliance period starting on 1 September 2005 (Requirement; Compliance; Note 2).