The AD itself prescribes the compliance pathway and acceptable methods; following the AD text closely is the compliance strategy.
Step 1 , Confirm applicability: Check whether the specific aeroplane serial/line number appears in Boeing Alert Service Bulletin (ASB) 737-28A1221, Revision 1, dated 9 November 2007. The AD applies only to "Model 737-600, -700, -800 and -900 series aeroplanes, as identified in" that ASB (Applicability). Only aeroplanes listed in that ASB are captured.
Step 2 , Prepare for the hardware installation per the ASB: For applicable aeroplanes, plan and schedule installation of the hot short protector (HSP) support brackets and the equipment for the FQIS fuel densitometer, plus every "other specified action" applicable to the aeroplane as set out in the Accomplishment Instructions of ASB 737-28A1221, Revision 1 (Requirement 1). The AD explicitly ties the required actions to the ASB's Accomplishment Instructions, so use that document as the technical compliance manual.
Step 3 , Evidence prior compliance if relevant: If the hardware actions were accomplished before the AD's effective date, assemble documentation showing the work was done "in accordance with ASB 737-28A1221, dated 14 January 2007" because the AD accepts such prior actions for Requirement 1 compliance (Requirement 1, second paragraph).
Step 4 , Incorporate the AWL into the ICA concurrently: The AD requires revision of the AWL section of the ICA by incorporating AWL No. 28-AWL-07 from the Boeing MPD (D626A001-CMR, Revision March 2007 R2) "Concurrently with accomplishing the Requirement 1 actions" (Requirement 2; Compliance section). Ensure the AWL insertion is a formal amendment to the ICA and that the revised ICA is dated and recorded.
Step 5 , Check whether Requirement 2 is terminated by prior AD compliance: If you have already incorporated AWL No. 28-AWL-07 "in accordance with Requirement 1.c. of AD/B737/329 (paragraph (g)(3) of United States FAA AD 2008-10-10)", that action "terminates the action required by Requirement 2" (Requirement 2). To rely on this, retain documentary evidence of the prior incorporation and ensure it matches the precise requirements and paragraph referenced.
Step 6 , Do not use alternative CDCCLs without FAA AMOC: If you contemplate using alternative Critical Design Configuration Control Limitations, obtain an AMOC from the Manager, Seattle Aircraft Certification Office, FAA before implementing the alternative (Requirement 3). The AD explicitly disallows alternative CDCCLs absent that FAA AMOC.
Step 7 , Consider later ASB revisions where appropriate: The AD accepts "later revisions of ASB 737-28A1221, approved by the FAA as an AMOC to FAA AD 2008-17-15" as acceptable for compliance with the equivalent Requirements of this Directive (Requirement 3). If a later ASB revision exists and has FAA AMOC approval to the FAA AD, confirm the FAA approval and use that revision for compliance, documenting the approval trail.
Step 8 , Meet the compliance timetable: For Requirement 1 the AD gives a compliance window of "Within 60 months after the effective date of this Directive." The AD's effective date is 18 December 2008 (effective date line). Requirement 2 must be completed concurrently with the Requirement 1 actions; Requirement 3 is effective after Requirement 2 (Compliance section). Plan maintenance scheduling and part procurement to meet these timing and sequencing constraints.
Step 9 , Maintain records: Keep contemporaneous maintenance records demonstrating that the ASB Accomplishment Instructions were followed, and retain formal ICA/AWL revisions showing incorporation of AWL No. 28-AWL-07. If relying on prior ASB compliance or on FAA AMOC approvals (for ASB revisions or alternative CDCCLs), retain the documents certifying those approvals and the applicable AD paragraphs used to claim termination or equivalence.
Step 10 , Liaise with the appropriate certification authority for alternatives: Any application for an AMOC to permit an alternate CDCCL must be directed to the Manager, Seattle Aircraft Certification Office, FAA. Document interactions and approvals. If relying on later ASB revisions, obtain and retain proof that those revisions were "approved by the FAA as an AMOC to FAA AD 2008-17-15" as the AD requires.
These steps are what the AD itself prescribes or authorises. The AD ties physical modification to specific ASB Accomplishment Instructions and requires formal AWL incorporation into the ICA. It also creates a strict pathway for permissible deviations through FAA AMOCs and explicitly recognises certain prior ASB-compliant work. To comply, operators must follow the ASB instructions, perform a formal ICA/AWL revision, meet the calendar timelines and sequence, and secure documented FAA approvals where alternative methods are proposed.