What it does
This Civil Aviation Safety Authority Airworthiness Directive (AD/B737/278 Amdt 1) mandates a physical modification to the elevator input torque tube assembly on certain Boeing 737 series aeroplanes. The Requirement text states: “Modify the elevator input torque tube assembly by doing all the actions in accordance with the Accomplishment Instructions of the applicable service bulletin in Table 1 of this AD.” The AD identifies the specific Boeing Alert Service Bulletins (ASBs) to be used in Table 1 and cross-references FAA AD 2005-26-03 Amdt 39-14424. The AD sets a compliance window: “Within 60 months after 16 March 2006.” The AD also records its effective amendment: “This Amendment becomes effective on 7 August 2009,” and the amendment text explains its purpose: “to allow use of a later FAA approved Boeing Alert Service Bulletin, as specified in Table 1, as an alternate method of compliance.”
Mechanically, the Directive (a) identifies applicability by model groupings and the specific ASB references for each group (Table 1), (b) requires operators to perform all actions in the Accomplishment Instructions of the applicable ASB, and (c) fixes a compliance deadline measured from 16 March 2006 (60 months). The Background section states the safety rationale: a report of restriction in the pilot’s elevator input control system prompted a design review that “discovered possible failure modes that could lead to a jam of the elevator control system,” and the AD’s actions are “intended to prevent loss of elevator control and consequent reduced controllability of the aeroplane.” The AD is signed by a CASA delegate (David Villiers) and stamped with an amendment effective date. The amendment explicitly permits later FAA‑approved revisions of the ASBs listed in Table 1 to be used as alternate methods of compliance.
That is the instrument’s mechanical effect: it converts a safety finding into a mandatory maintenance/modification obligation tied to specific manufacturer service instructions and an FAA cross‑reference, with a defined window for completion and a limited procedural relaxation (acceptance of later FAA‑approved revisions).