Several practical points in the Directive can be missed if a reader assumes literal conformity to the Boeing SB without checking the Notes and AMOC pathway. First, applicability is limited: the Directive applies only to those Model 737-100, -200, -200C, -300, -400 and -500 series aeroplanes that are "identified in Boeing Service Bulletin (SB) 737-28A1174, Revision 1, dated 18 July 2002." If an aeroplane of those model series is not identified in that SB revision, it is not in the Directive’s applicability list. That identification step is consequential for fleet operators who may have mixed configurations or records.
Second, the Directive mandates compliance with paragraph 3.B of the SB rather than the entire SB; some SB tasks are thereby implicitly not mandated unless paragraph 3.B references them. Note 2 explicitly says that "The marking of the forward surface of the front spar in accordance with SB 737-28A1174, Revision 1, Figures 1 and 2, Step 18, is not required for compliance with this Directive." That is a discrete compliance carve‑out an operator might miss if they merely follow the SB in full without reading the Directive notes.
Third, Note 1 permits operators to use their own CASA‑accepted equivalent procedures for draining fuel tanks and gaining access to the fuel tanks. That means an operator must have CASA‑accepted procedures in place to use this flexibility; lacking CASA acceptance of their procedures would eliminate that option and require strict adherence to the SB’s draining and access methods. Operators must check whether their procedural documentation is CASA‑accepted before relying on that Note.
Fourth, the AMOC pathway matters. The Directive allows "later revisions of the above SB, approved by the United States Federal Aviation Administration (FAA) as an Alternate Method of Compliance (AMOC) to FAA AD 2005-04-01, [to be] considered acceptable for compliance with the equivalent Requirements of this Directive." Operators must therefore verify that any later SB revision they intend to use has FAA AMOC approval tied to FAA AD 2005-04-01. The Directive does not accept later revisions automatically; FAA approval as an AMOC is required.
Fifth, timing and operational constraints are asymmetric. Requirement 1 has a long calendar deadline (before 12 May 2010), whereas Requirement 2 has an immediate operational constraint: any corrective actions found during Requirement 1 must be done before further flight. That means if an aeroplane has a deficiency discovered during the mandated action, it cannot return to service until the corrective work is completed. Operators must plan for the possibility of immediate grounding if corrective actions are required.
Sixth, some actions done under an earlier SB (Boeing SB dated 20 December 2001) before the Directive’s effective date are acceptable (Note 3). Operators who performed the earlier SB work should ensure their records demonstrate that the earlier SB was used and the work completed before the Directive’s effective date if they rely on Note 3 to claim compliance.
Finally, while the Directive is silent on enforcement mechanisms and penalties, it is an airworthiness directive issued by CASA. Non‑compliance with the mandatory Requirements will leave an aeroplane in a non‑compliant state relative to this Directive. Operators should therefore treat the Directive’s timelines and the "before further flight" requirement for corrective actions as binding operational constraints even though the text does not specify enforcement procedures or penalties.