Compliance with AD/B737/201 Amdt 4 requires a structured process that begins with identifying which aircraft are affected and ends with documented proof of completion. The key steps are as follows.
Step 1: Determine applicability. Check each aircraft on the operator’s fleet list for model series. The AD applies to all 737‑100 through 737‑900 models. There are no exclusions for aircraft that have already incorporated FAA AD 2002‑20‑07 R1 modifications or that are in storage. Even if the aircraft is temporarily grounded or stored, the AD still requires the actions to be performed before return to service.
Step 2: Obtain the underlying FAA AD. Obtain the full text of FAA AD 2007‑03‑07 Amdt 39‑14918, including all paragraphs (e) through (j). This can be accessed via the FAA’s Regulatory and Guidance Library (RGL) website. The operator should ensure they have the correct amendment number; the AD’s effective date was 12 April 2007. If the FAA has issued later amendments (e.g., by further ADs that supersede 2007‑03‑07), the operator must check whether those are also adopted by CASA or whether they supersede the CASA AD. In practice, if a later FAA AD superseded 2007‑03‑07, the CASA AD may become outdated; the operator should request an AMOC from CASA.
Step 3: Understand the required actions. The paragraphs (e) through (j) typically include:
- (e) General applicability and definitions.
- (f) Main action: modification of the rudder PCU input control rods, including inspection for cracks, replacement of certain rods, and installation of new hardware.
- (g) Inspection of the standby rudder PCU.
- (h) Repetitive inspections or life limits for certain parts.
- (i) Reporting requirements for findings.
- (j) Alternative methods of compliance (AMOC).
The operator must have a detailed work instruction or a service bulletin (such as Boeing Service Bulletin 737‑27‑1185 or later revisions) that implements the FAA AD. The AD itself may refer to Boeing SB 737‑27‑1185 or later. The operator must use the exact revision specified in the FAA AD. Using an older revision is non‑compliance.
Step 4: Determine the compliance time. For paragraph (f), the compliance time is six years after 26 December 2002, i.e., 26 December 2008. For other paragraphs, the compliance time is the effective date of 12 April 2007, unless the FAA AD specifies a different interval (e.g., repetitive inspections every 4,000 flight cycles). If the aircraft has already performed the actions within the past few years, the operator must check whether those actions meet the requirements of the current AD. For example, if a rod end was replaced ten years ago using an older part number, it may not satisfy the later requirements.
Step 5: Evaluate available AMOCs. The most straightforward AMOC is FAA letter 130S‑03‑19, which is approved for paragraphs (f) and (h). The operator must obtain that letter and ensure its conditions are met. Typically, AMOC letters allow alternative inspection intervals, use of different part numbers, or acceptance of data from other tests. The operator must document that each aircraft complies with the letter’s conditions. If the letter is not in the operator’s records, they should request a copy from the FAA or from the manufacturer (Boeing). There may be other AMOCs approved by CASA for specific operators. The operator should search the CASA website or contact CASA’s AD office to see if any other AMOCs are listed as “Approved AMOC for AD/B737/201”.
Step 6: Plan the maintenance action. Schedule the required work during a suitable maintenance base check. The work may require the aircraft to be grounded for several days. If the aircraft has already exceeded the compliance time, the operator must immediately ground it until the action is performed. The work should be performed by an AMO that is rated for Boeing 737 hydraulic systems and that has experience with the specific SB. The AMO must obtain the required parts (e.g., input control rods, bolts, washers) from an approved source. The operator should forecast parts availability months in advance to avoid delays.
Step 7: Perform the work and document. The AMO must complete a certification statement that the aircraft complies with the AD, citing the FAA AD paragraph and the AMOC used (if any). The operator must retain the maintenance records for the life of the aircraft. The records must include the SB revision used, the part numbers installed, the date of compliance, and the engineers’ signatures. If the AMOC letter was used, include a copy of the letter and evidence that its conditions were met.
Step 8: Complete reporting requirements. If the inspection reveals any crack or fracture, the operator must report it to the FAA (via FAA Form 337 or other means) and to CASA (via the Mandatory Occurrence Reporting system). The operator should also provide a copy of the report to the lessor or manufacturer if required by contract.
Step 9: Verify ongoing compliance. If the AD requires repetitive inspections (e.g., paragraph (h)), the operator must set up recurring maintenance tasks in the aircraft’s maintenance program. The operator should check if the AMOC modifies the interval. The operator must ensure that future maintenance actions are performed on time to avoid recurrence of non‑compliance.
Step 10: Conduct an audit. After the initial compliance, the operator should audit a sample of aircraft to ensure the work was performed correctly. CASA may conduct a surveillance audit. If CASA identifies discrepancies, the operator must rectify them immediately and may face enforcement action even if the original work was done in good faith.
Step 11: Stay informed of further amendments. The AD has already undergone four amendments; there may be future amendments that adopt newer FAA ADs or approve additional AMOCs. Operators should subscribe to CASA’s AD mailing list or check the CASA website monthly for updates. They should also monitor FAA AD activity for the 737 rudder system, as FAA changes may be incorporated by later CASA amendments.
Following these steps will bring the operator into compliance and minimise the risk of enforcement, grounding, or liability. The cost of compliance is unavoidable, but good planning can reduce downtime and avoid the need for last‑minute part procurement.