What it does
This instrument is Amendment 4 to AD/B727/99, addressing fatigue cracking in the No. 3 cargo door frame and adjacent fuselage skin on Boeing 727-200 series aeroplanes. Mechanically, it does three things.
First, it makes mandatory the technical actions contained in FAA Airworthiness Directive 2006-13-01 Amdt 39-14653 by directing operators to "Action in accordance with the technical requirements of FAA AD 2006-13-01 Amdt 39-14653" (Requirement). In practice, the CASA directive imports the FAA AD as the operative set of inspection, repair and modification instructions for the affected aeroplanes identified in the Applicability paragraph.
Second, it defines the universe of affected aeroplanes by reference to Boeing Alert Service Bulletin 727-53A0169 Revision 2, or "later FAA approved revision" (Applicability). That means an aeroplane is within scope only if it is a Model 727-200 series and is identified in that Boeing service bulletin revision (or a later FAA-approved revision).
Third, it revises timing and scope. The Amendment 4 text states it "reduces the compliance time for initial inspections, adds an optional method of inspection for both the initial and repetitive inspections, and introduces inspections of an additional area" (Background). It also records that Amendment 3 previously had "increased the area to be inspected, introduced additional inspections of repaired frames, and provided an improved modification for crack free frames, which terminated the repetitive inspection requirement" (Background). Finally, it clarifies that a previously optional structural modification is now required by another AD (90-06-09, AD/B727/118 Amdt 1) (Background).
The document sets an effective date: the Amendment "becomes effective on 3 August 2006" and the Compliance paragraph repeats a "revised effective date of 3 August 2006". The instrument is signed by the CASA delegate, David Villiers, and dated 22 June 2006.