What it does
This Airworthiness Directive (AD) mandates hardware changes and a maintenance-program revision for Boeing 727 series aeroplanes to address identified fuel-tank ignition risks. It requires installation of new ground fault interrupter (GFI) relays for the main and auxiliary fuel tank pumps and related wiring and panel work, additional hardware installs for aircraft in certain groups of the Boeing Alert Service Bulletins (ASBs), and incorporation of specified Airworthiness Limitations into the approved maintenance programme. The AD specifies timeframes for compliance and makes FAA-approved alternative means of compliance (AMOCs) the only pathway to deviate from the prescribed inspections or intervals.
Mechanically, the Directive breaks into three enforceable requirements. Requirement 1 directs operators to "install new ground fault interrupter (GFI) relays for the main fuel tanks and the auxiliary fuel tank pumps and do all the other specified actions by accomplishing all the applicable actions specified in the Accomplishment Instructions of ASB 727-28A0128" (Requirement 1). Requirement 2 applies only to aeroplanes identified as Groups 5 through 18 in ASB 727-28A0128 and requires additional work in accordance with the Accomplishment Instructions of Boeing ASB 727-28A0130, including installation of ground blocks, tracks, mounting brackets, toggle switches, relays and associated wiring changes in the electronic equipment bay, and installation of new circuit breakers and lights plus wire-bundle changes on the third crewman's P6 and P4 panels in the flight compartment (Requirement 2(a) and 2(b)). Requirement 3 mandates revising the approved maintenance programme by incorporating Airworthiness Limitations 28-AWL-16 and 28-AWL-17 from Section D of Boeing Document D6-8766-AWL, Revision August 2007 (Requirement 3).
The AD prescribes compliance timing: Requirement 1 must be done "within 60 months after the effective date of this Directive" and Requirements 2 and 3 must be completed "concurrently with Requirement 1" (Compliance). The Directive became effective on 7 May 2009 and was signed by a CASA delegate on 26 March 2009. The AD references FAA AD 2009-05-03 (Amdt 39-15827) and states that later revisions of the two Boeing ASBs, if approved by the FAA as AMOCs to FAA AD 2009-05-03, are acceptable for compliance with the equivalent Requirements of this Directive (Note).