Compliance can be broken into a sequence of steps, tailored to the aircraft’s serial number and prior modification status.
Step 1: Identify applicability. Verify that the aircraft is a Model AT‑602 with a serial number equal to or greater than 602‑0337. If the serial number is lower, the AD does not apply. Record the serial number and total airframe time in service.
Step 2: Obtain the required engineering data. Purchase or otherwise secure access to: Snow Engineering Co. Service Letter No. 204 Revised 26 March 2001; the drawing titled “602 Spar Inspection Holes and Vent Tube Mod.” dated 13 November 2003; Snow Engineering Co. Process Specification 197 Revised 4 June 2002; and, if applicable, Snow Engineering Co. Service Letter No. 244 dated 25 April 2005, Service Letter No. 240 dated 30 September 2004, Drawing 20998 Revision B dated 28 September 2004, Drawing 20776 Sheet 2 Revision A dated 30 August 2004, and any other referenced drawings.
Step 3: Check prior accomplishment. Review the aircraft logbooks or maintenance records to see if the initial access and inspection (Requirement 1) has already been done. Also check if the cold‑working procedure under SL No. 244 has been performed, and whether the terminating action (steel web plate and 8‑bolt splice blocks) has been done.
Step 4: Cut inspection holes and modify vent tube (if not already done). Perform the work per SL No. 204 Revised and the drawing. Install the cover plates.
Step 5: Determine inspection category and schedule. - For serial numbers 602‑0337 through 602‑0584 that are unmodified (no cold working): initial inspection is due at 2,000 hours or within 50 hours after 18 Jan 2007, whichever later. Thereafter at intervals not exceeding 1,000 hours. - For serial numbers 602‑0337 through 602‑0584 that have cold‑worked holes per SL No. 244: initial inspection (as part of the cold working) must be done if not already, and then repetitive inspections every 2,000 hours. The 2,000‑hour interval starts from the cold‑working date or the first inspection, whichever is later. - For serial numbers 602‑0585 and subsequent: the AD does not specify a repetitive interval. To be safe, adopt a 1,000‑hour repetitive schedule until CASA provides clarification, or contact CASA for an individual determination.
Step 6: Perform eddy current inspection. Engage a maintenance organisation with NDT capability qualified to Process Specification 197. Inspect the two outboard fastener holes in each lower spar cap (left and right wings). Record the results.
Step 7: If cracks are found: - Determine if the crack can be removed by the terminating action (i.e., by installing the steel web plate and 8‑bolt splice blocks and cold working the holes). If yes, proceed with the terminating action. - If the crack cannot be removed by the terminating action, obtain new lower spar caps (and associated parts) and replace them per Drawing 20776 before further flight. This is a no‑grace condition.
Step 8: Consider terminating action to eliminate repetitive inspections. Even if no cracks are found, the operator may choose to perform the terminating action early. This involves installing the steel web plate (part 20996‑2) and the 8‑bolt splice blocks (part 20985‑1/2) per Drawing 20998 Rev B, and cold working the two outboard holes per SL No. 240. Once accomplished, the repetitive inspection requirements of Requirement 2 cease. The operator records the termination in the logbook.
Step 9: Mandatory replacement at 6,500 hours. Regardless of prior inspections or modifications, when the wing spar lower caps reach 6,500 hours time in service, the operator must replace the lower spar caps, splice blocks and hardware, wing attach angles and hardware, and install the steel web plate (if not already installed) per Drawing 20776 Sheet 2 Rev A. This replacement terminates the inspection requirements. Note: if the terminating action was already done, the steel web plate may already be installed, but the replacement of the spar caps themselves is still required at 6,500 hours. The AD does not state that the terminating action waives the 6,500‑hour replacement; it only states that the terminating action terminates the inspection requirements of Requirement 2. The replacement at 6,500 hours is Requirement 5, which applies to all aircraft.
Step 10: Document all actions. Enter each compliance action (access, inspection, crack repair, modification, replacement) in the aircraft maintenance logbook, referencing the AD number, the specific requirement complied with, the hours at which the action was done, and the engineering data used. Retain copies of the service letters and drawings used, and the certification statement from the maintenance organisation.
Step 11: Monitor ongoing compliance. Maintain a tracking system for the next repetitive inspection (if terminating action not yet done) and for the 6,500‑hour replacement. For aircraft that have not yet reached 6,500 hours, schedule inspections before the hour limit. For aircraft that have already passed 6,500 hours, the replacement must be accomplished within 50 hours of 18 January 2007 (if not already done).
Alternative means of compliance. If the operator cannot obtain the specific Snow Engineering documents or parts, or wishes to use a different inspection method, they should apply to CASA for an alternative means of compliance under CASR Part 39, providing engineering justification and data. CASA may approve an equivalent procedure, but this process can take time.