Obtain the referenced service letters
- The AD makes compliance conditional on procedures and numerical values contained in Snow Engineering Co. Service Letter No. 129 (issued 26 September 1994, revised 21 October 2004) and SL 129A (dated 7 August 2004). Step one for compliance is to secure the current copies of those SLs as referenced in the AD so that torque values, replacement hour thresholds and the SL 129A modification procedure are available to maintenance personnel.
Immediate tightening action
- Requirement 1 requires tightening the four eyebolts attaching the front and rear stabiliser spars to the stabiliser struts, "using the torque values referenced in SL No. 129, revised 21 October 2004." Compliance 1 sets the timing: perform this tightening within 100 hours time in service or 12 calendar months after 1 September 2005, whichever occurs first, unless already accomplished. Thereafter tighten at intervals not to exceed 12 calendar months. Practically, maintenance teams should schedule a torque check within the shorter of the two windows and then place the tightening interval on an annual recurring preventive maintenance schedule.
Eyebolt replacement regime
- Requirement 2 mandates replacement "in accordance with SL No. 129." Compliance 2 clarifies that initial replacement must occur upon reaching the hours-in-service threshold specified by SL No. 129 or within 50 hours time in service after 1 September 2005, whichever is later; subsequent replacements must follow the intervals in SL No. 129. To comply, operators must:
- Determine the cumulative hours-in-service for each eyebolt on each affected aircraft, as SL No. 129 prescribes.
- If the eyebolt has already exceeded the SL-specified hours, schedule replacement within the 50-hour window after 1 September 2005.
- Record the part number, serial or batch identification where available, the hours-in-service at replacement, and the next scheduled replacement interval per SL No. 129.
Optional SL 129A modification for certain serials
- For aircraft with serial numbers up to and including 602-0695, Requirement 3 provides an alternative: replace the steel brace assembly inside the stabiliser with the new assembly having larger bushings and replace any 7/16-inch eyebolt with 9/16-inch eyebolt part number 30774-1, "in accordance with SL 129A, dated 7 August 2004." Compliance 3 allows this work to be done at any time after 1 September 2005 but emphasises that Requirement 2’s repetitive replacement obligation continues. Practically, follow SL 129A’s parts list, fitment and installation steps precisely, document the modification, and then continue to log and replace eyebolts per the intervals allowed by SL No. 129 as modified by SL 129A.
Avoid installing over-life parts
- The AD states: "Do not install any 5/16-inch eyebolt (AN44-17A or AN44-21A), 7/16-inch eyebolt (AN47-22A or AN-47-30A), or 9/16-inch eyebolt (30774-1 or 30775-1) that exceeds the corresponding cumulative hours time in service specified in Requirement 2 or 3." Ensure that maintenance shops check cumulative hours for any eyebolt part before installation, and that parts inventories are not used beyond the AD’s permitted cumulative hours. Mark and segregate parts to prevent inadvertent over-age installation.
Maintenance recordkeeping and scheduling
- Because the AD ties obligations to hours-in-service and calendar intervals, operators must record the hours-at-installation for each eyebolt and the hours remaining until required replacement under SL No. 129 or SL 129A. For annual tightening, schedule and document the action within the aircraft’s maintenance log or the operator’s maintenance management system to demonstrate timing relative to the AD’s deadlines. Use part-number and installation-date entries to create a traceable chain of compliance.
Technical competence and torque accuracy
- The AD requires tightening "using the torque values referenced" in SL No. 129. Ensure maintenance personnel have calibrated torque tools, the precise torque figures from SL No. 129, and training in the proper procedure for achieving and verifying the torque values. Record the torque values applied and who performed the action as part of the compliance record.
Parts sourcing and compatibility
- When replacing eyebolts, procure the exact part numbers named in the SLs and AD where required. For the SL 129A modification, obtain the correct steel brace assembly and 9/16-inch eyebolt part number 30774-1 as specified. Confirm part conformity to the SLs and retain supplier documentation in maintenance records.
Document the alternative modification decision
- If electing the SL 129A modification for eligible aircraft, document the decision, the date of modification, part numbers installed, and follow-up replacement intervals per SL No. 129. Make clear in records that the modification was executed in accordance with SL 129A and that repetitive replacement remains scheduled.
Cross-check serial-number applicability
- Carefully match aircraft serial numbers to the AD’s applicability language. Because the AD has serial-number thresholds and a possible serial-number gap between 602-0695 and 602-0703 in the supplied text, verify the serial number’s status against the AD wording and keep documentation of that verification. If serial numbers fall in a gap or an unclear range, seek authoritative clarification from the issuing authority before assuming coverage or exemption.
Retain evidence for audits
- Keep maintenance entries, parts purchase records, torque check sheets and SLs used for the work as the best evidence of compliance. Although this AD text does not specify the records to produce on demand, preserving clear and contemporaneous records will be necessary to show that the AD’s tightening and replacement requirements were followed.
Monitor for related ADs and SL revisions
- The AD references FAA AD 2005-13-12 and relies on specific dated SLs. Operators should monitor for any later revisions to SLs or further directives that explicitly amend or supersede the AD, and should not assume later SL revisions automatically replace the versions referenced in the AD without formal direction.
Sign-off and authority
- Have the work performed and signed off by appropriately authorised maintenance personnel, following the organisation’s internal approval and release-to-service procedures. The AD is signed by a CASA delegate; ensure that the person releasing the aircraft for flight following maintenance is competent and authorised under the relevant maintenance certification rules applicable to the operator, and that records demonstrate the AD work and timing.
Summary checklist
- Obtain SL No. 129 and SL 129A as referenced.
- Determine applicability for each aircraft by serial number and installed eyebolt part numbers.
- Perform the initial tightening within 100 hours or 12 months after 1 September 2005 and then annually.
- Determine hours-in-service for each eyebolt; replace upon reaching SL No. 129 hours or within 50 hours after 1 September 2005 if overdue; then replace at intervals per SL No. 129.
- For eligible early serials, consider SL 129A modification, document it, and continue repetitive replacements.
- Do not install eyelbolts that exceed cumulative hours allowed by the AD.
- Keep detailed records of parts, hours, torque values applied, and sign-offs.
This sequence implements the directive as written and creates the maintenance record trail necessary to demonstrate conformance to the AD’s stated requirements.