The AD’s compliance path is procedural and short-form: obtain the referenced ASB and implement the specified checks, markings and replacements within the AD’s timelines. Below is a practical, source-grounded checklist mapped to the AD’s requirements and timelines.
Step 0 , Confirm applicability
- Consult modification and maintenance records to determine whether each AS 355 E helicopter in your fleet is within scope. The AD applies to "Models AS 355 E helicopters, equipped with main servo-controls, all part numbers, not modified per MOD 073343, and on which the tightening torque of the nut that secures the upper ball-end has been increased following:- embodiment of MOD 073191; or,- compliance with MET Work Card 67.30.00.402 since MET Revision 04-08." If your aircraft are modified per MOD 073343 they are excluded; if they have not had the tightening torque increase per MOD 073191 or the named MET Work Card since the stated revision they are outside the AD’s scope as written.
Step 1 , Obtain the referenced technical documents
- Obtain Eurocopter ASB No. 05.00.48 and locate paragraphs 2.A, 2.B.2, 2.B.2.b, 2.B.3 and 2.B.4 as referenced in the AD. The AD requires actions "in accordance with" those paragraphs; the AD does not contain the procedural steps itself.
- Note the reference to EASA AD 2006-0055-E for situational awareness and for any cross-checking of recommended actions.
Step 2 , Initial inspection timing
- For each affected helicopter (per Step 0), schedule the initial tapered-housing inspection "within 10 flight hours or 10 days after 6 March 2006, whichever occurs first." If you are already beyond those windows, perform the inspection immediately (the AD became effective on 6 March 2006).
Step 3 , Perform the inspection in accordance with ASB paragraph 2.B.2
- Carry out the tapered housing check "in accordance with paragraph 2.B.2. of Eurocopter AS 355 Alert Service Bulletin (ASB) No. 05.00.48." Record the inspection result and any measurements of crack length and orientation. Ensure personnel performing the inspection are competent to interpret crack orientation (vertical along the servo-control axis, oblique, horizontal) and to measure crack length to the precision required by the ASB.
Step 4 , Follow the AD’s prescribed outcomes based on inspection result
- If no crack is evident:
- Comply once with paragraph 2.B.3 of ASB No. 05.00.48 and then "resume flights" as the AD directs.
- If a vertical crack less than 20 mm long (along the servo-control axis) is found:
- Comply once with paragraph 2.B.3 of ASB No. 05.00.48.
- Identify the end of the crack using an indelible ink marker as required by the AD.
- Resume flights, but also comply with paragraph 2.B.4 of ASB No. 05.00.48 for interim monitoring.
- Ensure interim monitoring is performed "during the check after the last flight of the day, without exceeding 10 flight hours between two inspections."
- Plan replacement in accordance with paragraph 2.A of the ASB "no later than within 150 flight hours without exceeding 3 months."
- If a vertical crack is 20 mm or longer, the crack has grown by more than 5 mm, there is an oblique or horizontal crack, or there are multiple cracks:
- Replace the servo-control "in accordance with paragraph 2.A. of ASB No. 05.00.48."
- The AD specifies replacement "Before further flight" in Requirement 2, so do not operate the aircraft again until replacement has been completed.
Step 5 , Spares handling
- For main servo-controls held as spares, accomplish paragraph 2.B.2.b of ASB No. 05.00.48.
- If no crack is evident in the spare, comply once with paragraph 2.B.3 and the spare may be placed into service.
- If a crack is evident in the spare, return the servo-control for repair, rather than attempting to place it into service.
- Observe the AD’s timing on spares: inspect spares "within 10 days after 6 March 2006, or before installing a main servo-control held as spares."
Step 6 , Record-keeping
- Make a maintenance record entry for each inspection, marking action, interim inspections and replacements, citing the AD reference "AD/AS 355/90 Main Servo-Controls 4/2006 TX" and the specific ASB paragraph(s) used for the procedure.
- Retain evidence of the indelible ink marking for small vertical cracks and document the flight-hour and calendar tracking for the replacement deadline (150 flight hours or three months maximum).
Step 7 , Operational constraints and scheduling
- Where interim monitoring is permitted, ensure that the "check after the last flight of the day" is scheduled and that no more than 10 flight hours pass between inspections.
- For replacement deadlines set at "no later than within 150 flight hours without exceeding 3 months," track both flight hours and calendar time; replacement must be achieved before either limit is breached.
Step 8 , Coordination with repair stations and parts supply
- If replacement is required, ensure replacement parts conform to the ASB and are either new or repaired in accordance with the repair methods specified in paragraph 2.A of ASB No. 05.00.48.
- If spares are returned for repair, route them to the authorised repair facility designated by Eurocopter or as specified in the ASB.
Step 9 , Regulatory liaison
- Because the AD was issued by CASA and references EASA AD 2006-0055-E, if there is ambiguity about applicability or compliance timing, contact CASA for guidance. The AD itself contains no extension or exemption procedure. If unable to meet the AD timelines due to parts availability or scheduling, seek CASA's direction in writing; do not operate outside the AD’s requirements without explicit regulatory relief.
Step 10 , Training and procedure updates
- Update maintenance procedures and training materials to incorporate the ASB inspection methods referenced in the AD and to ensure technicians can measure cracks and apply the marking and monitoring requirements correctly.
- Ensure the operations department is aware of the inspection cadence and replacement deadlines, since these requirements can affect flight schedules and aircraft availability.
Checklist summary (minimum actions)
- Confirm applicability using MOD and MET records.
- Obtain Eurocopter ASB No. 05.00.48, especially paragraphs 2.A, 2.B.2, 2.B.2.b, 2.B.3 and 2.B.4.
- Inspect tapered housings within the AD’s initial window.
- Follow the AD’s decision steps depending on crack presence, length and orientation.
- For small vertical cracks, mark with indelible ink, inspect daily (as required), and replace within 150 flight hours but not more than 3 months.
- Replace immediately "before further flight" for the higher-risk crack conditions.
- Inspect spares before installation or within 10 days after the AD’s effective date; return cracked spares for repair.
- Record all actions citing the AD and ASB paragraphs.
Following these steps will implement the AD’s mandatory requirements as written, but operators should maintain documentary proof of compliance and liaise with CASA if any procedural or timing difficulties arise.