Identify affected equipment and status. First, review the operator's fleet and maintenance records to identify all Eurocopter AS332 and EC225 helicopters that have SAPHIR 20 model 095 APUs installed. Check maintenance logs to determine whether the ECU and Drain Valve replacements required by this AD have "already been accomplished" in accordance with Microturbo ASB 095-49A11 Edition 2 dated 7 October 2005 or a later NAA approved revision. The AD explicitly conditions relief on prior accomplishment.
Obtain the correct ASB and confirm NAA approvals. Acquire Microturbo ASB 095-49A11 Edition 2 dated 7 October 2005 and determine whether any later revisions exist. If relying on a later ASB revision, confirm that it is "NAA approved" as required by the AD. The AD itself states the modification must be "modified in accordance with the instructions of MICROTURBO Alert Service Bulletin (ASB) 095-49A11, Edition 2, dated 7 October 2005 or later NAA approved revisions."
Plan parts procurement and logistics. The AD requires replacement of both the ECU and the Drain Valve with modified units. Coordinate with Microturbo authorised distributors or approved vendors to procure the modified ECU and Drain Valve consistent with the ASB instructions. Since Edition 2 contains "revised torque values" and the modified ECU includes a "new EGT limit setting," ensure the parts delivered are the correct modified configuration.
Schedule and execute the installation within the compliance window. The AD sets a compliance window of "Within 60 days, after the effective date of this AD." The amendment effective date is 10 May 2007; for any APUs not already modified, make arrangements to complete the replacement within that 60-day period. Allocate maintenance slots, qualified personnel, tooling and any required ground test facilities to perform the replacement and verification tasks as instructed in the ASB.
Follow ASB instructions exactly, including torque and EGT settings. Because the AD incorporates the ASB and explicitly notes that Edition 2 contains revised torque values and that the modified ECU includes a new EGT limit setting, installers must apply the torque figures and configure the ECU EGT limits in strict accordance with the ASB. Ensure that maintenance engineers have the documentation and tooling to apply and verify torque values and to program or set the ECU EGT limit as required.
Document the work and retain evidence. The AD recognises prior accomplishment as a compliance discharge. While it does not specify documentary form, to demonstrate compliance in any subsequent audit or review, create and retain clear records showing the parts used (make/model/part number where provided), the ASB revision used, evidence of NAA approval if a later ASB revision was used, the date of installation, sign-off by qualified personnel, torque records and any ECU EGT setting verification. These records will be the practical means of proving that the AD's requirement was satisfied.
Coordinate with the NAA where necessary. If using a later ASB revision, confirm its NAA approval status before relying upon it for compliance. The AD explicitly allows "later NAA approved revisions" and states it makes reference to the ASB "at the latest revision status." Contact the applicable National Aviation Authority to obtain written confirmation of approval for later ASB revisions if there is any doubt.
Verify functional performance after installation. The AD's stated safety aims include limiting gas generator speed during acceleration toward overspeed and ensuring EGT control compliance with certificated limits. After installation, perform whatever functional tests the ASB requires (or that are customary for ECU/Drain Valve replacements) to verify that the modified ECU is operating with the new EGT limit and that the system responds as documented. Keep these test results as part of the compliance record.
Consider operational procedures and monitoring adjustments. Because the modified ECU includes a new EGT limit setting, update monitoring and dispatch criteria, as necessary, to ensure that instrument readings and alarms align with the new limits. While the AD does not prescribe operational changes beyond the hardware replacement, operators should ensure that crew and maintenance documentation reflect the updated EGT limits where applicable.
Address multiple aircraft and spare parts planning. Where an operator manages multiple affected helicopters, plan for parts inventory and staggered maintenance to meet the 60-day window without disrupting operations unduly. The AD does not provide phased compliance options; if parts lead times interfere with the 60-day window, engage early with the issuing authority for guidance, and document efforts to procure parts and schedule maintenance.
Maintain traceability to the DGAC/EASA reference. The AD cites DGAC AD F-2005-146 (EASA reference No 2005-6137 dated 9 August 2005). While the AD itself sets the compliance path via Microturbo ASB Edition 2, operators should include awareness of the referenced foreign AD in their compliance files to show they have considered related international directives.
Where doubt exists, seek clarification from the issuing authority. The AD text is prescriptive but does not supply enforcement, recordkeeping, or waiver details. If there is uncertainty about application , for example, about whether prior modifications comply, or whether a later ASB revision qualifies without additional approval , obtain written guidance from the Civil Aviation Safety Authority or the relevant NAA. The AD's allowance for "later NAA approved revisions" indicates the NAA will be a decision point for questions about ASB revision acceptability.