What it does
This Airworthiness Directive (AD/AC-SNOW/26) issued by the Civil Aviation Safety Authority (CASA) on 21 January 2008 imposes mandatory inspection and replacement requirements on the vertical and horizontal stabiliser attach fittings and related components of specified Ayres Thrush S2R series aircraft equipped with metal empennage part numbers 40220 or 95400. The directive arose after the FAA received reports of cracks in the empennage, which if undetected could lead to loss of structural integrity of the vertical stabiliser and consequent loss of control. Mechanically, the AD requires operators to perform a visual inspection for corrosion and cracking on six specific components: the vertical stabiliser attach fitting part number 40301-7, the horizontal stabiliser attach fitting part number 40303-1/-4/-7 or 95267-1, the attachment bolt part number NAS1105-68, and the vertical fin aft spar part number 40261-24 or 95253-1. The inspection must follow Thrush Aircraft Inc. Service Bulletin No. SB-AG-45 Revision B (dated 1 June 2007) or any later FAA-approved revision. The AD then branches into two compliance paths based on inspection outcomes. If corrosion or cracks are found, the operator must replace the attach fittings with new parts (vertical stabiliser fitting part number 95266-3, horizontal stabiliser fitting part number 95267-5, and bolt NAS6207-68) and repair or replace the vertical fin aft spar if damaged. If no corrosion or cracks are found, the same replacement of fittings and bolt is still required, plus a visual inspection of the vertical fin aft spar, with repair or replacement as needed. The AD also authorises special flight permits for ferrying aircraft to a maintenance facility, but only with the hopper empty, Vne reduced to 126 mph (109 knots), and no flight into known turbulence. Compliances times are layered: initial inspection within 50 hours time in service after 23 January 2008; repeated inspections at intervals not exceeding 100 hours until the replacement actions are completed; replacement (whether cracks found or not) must be done before further flight if cracks found or within 2,000 hours or 2 years if no cracks found, whichever occurs first. This structure forces a hard deadline for upgrading the attach fittings regardless of condition, reflecting an engineering judgment that the original parts are susceptible to cracking even without visible corrosion.