Step 1 , Determine applicability. Inspect each A109E helicopter’s tail rotor blades and confirm whether the blades fitted are part number 109-8132-01-111. The Directive is strictly confined to helicopters "equipped with part number 109-8132-01-111 tail rotor blades." Only aircraft with that exact part number are subject to the mandatory actions described.
Step 2 , Obtain and read the Requirement document. The Directive mandates actions "in accordance with the requirements of Agusta Technical Bulletin 109EP-30 Revision C." Operators must obtain Revision C of the Technical Bulletin, read its Part II visual inspection procedures, intervals, and corrective actions, and incorporate those procedures into the aircraft’s maintenance programme.
Step 3 , Update Maintenance Release records. The Directive "shall be entered on the Maintenance Release as maintenance required." Make the appropriate Maintenance Release entries and ensure the aircraft's maintenance control system records the Directive and relevant actions. Where the PIC will not perform Part II inspections, ensure maintenance personnel schedule and certify the inspections and corrective actions in the Maintenance Release.
Step 4 , Implement inspection and retirement rules. Follow the inspection intervals and procedures set out in the Technical Bulletin. Amendment 1 extends the inspection interval of the tail rotor blade bushing to 200 flight hours as specified in Revision C; ensure your scheduling reflects the 200-hour inspection interval and the 200-hour life limit for the blade. Monitor the time in service for each affected blade and remove blades at or before 200 hours time in service until the tail rotor grip assembly has been modified.
Step 5 , Train PICs if using PIC-certification route. If the operator intends to have the Pilot in Command perform and certify the Part II visual inspections, ensure each PIC receives the required training from an "appropriately qualified person." The Directive does not define that term; operators should therefore adopt a conservative approach , use a maintenance certifying engineer or other qualified maintenance trainer , and document the training. When a PIC performs the inspection and certification, ensure a copy of the Requirement document and the Directive is carried in the aircraft as required.
Step 6 , Carry required documents. Where PICs perform and certify inspections, place a copy of Agusta Technical Bulletin 109EP-30 Revision C and the Directive on board the aircraft. Ensure those copies are the correct revision and accessible during operations in which PIC-certification is used.
Step 7 , Plan for modification. The manufacturer has redesigned the tail rotor grip bushings. Operators should obtain information from the manufacturer or authorised service providers about the redesign, availability of modification kits or approved parts, and the procedure for installing the modification. While the Directive does not specify a deadline for modification, the interim life limit applies "until the tail rotor grip assembly is modified." Operators should therefore plan for prompt modification to remove the 200-hour constraint and to reduce inspection burden.
Step 8 , Coordinate with maintainers and regulators. Ensure the maintenance organisation and licensed engineers responsible for the aircraft are aware of the Directive and the Technical Bulletin requirements. Enter the Directive on any internal maintenance control logs and share the Technical Bulletin with staff responsible for inspections and component tracking. If in doubt about "appropriately qualified person" for PIC training, consult the maintenance certifying authority or CASA guidance.
Step 9 , Align records with Amendment effective date. Amendment 1 "becomes effective on 15 February 2007." For any compliance actions taken after that date, ensure records reflect adherence to Revision C intervals (200 hours for bushing inspection) and any other revisions in the Requirement document. Back-records should indicate which revision was followed for past inspections.
Step 10 , Maintain auditable trail. Because the Directive requires Maintenance Release entry and document carriage in certain circumstances, keep written evidence of compliance: Maintenance Release entries, inspection certificates, PIC training records where applicable, parts replacement logs noting time in service at replacement, and paperwork for any modification carried out. This auditable trail will support compliance in audits, inspections, or incident investigations.
In sum, compliance requires: (1) identification of affected aircraft by part number; (2) implementing actions and intervals in Agusta Technical Bulletin 109EP-30 Revision C; (3) entering the Directive on the Maintenance Release; (4) ensuring PIC training and document carriage where PIC-certified inspections are used; (5) retiring blades at 200 hours time in service until modification; and (6) planning and executing the manufacturer’s redesign modification when available. The Directive does not itself set out sanction mechanisms, so maintaining clear records and following the Technical Bulletin precisely are the primary means to demonstrate compliance.