Accounting Standard AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity
In ForceCTH
Jurisdiction
Commonwealth
Collection
legislative instrument
Plain English Summary
7/10 complexity
This Standard amends AASB 7 and AASB 9 to clarify when contracts tied to weather‑dependent electricity fall inside or outside the accounting rules, to permit those contracts to be used as hedging instruments, and to add a single‑note disclosure and related measurement choices. It affects any entity that buys or sells nature‑dependent electricity (for example, wind or solar PPAs), by shifting measurement, disclosure and transition choices onto preparers and requiring estimates about future cash flows and usage.
AASB 2025-1 amends two existing Australian accounting standards, AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014), to respond to the IASB’s December 2024 International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7). The instrument is made by the Australian Accounting Standards Board under section 334 of the Corporations Act 2001, and it is dated 3 February 2025 (Accounting Standard AASB 2025-1, signed by the AASB Chair). The amendments take effect for annual reporting periods beginning on or after 1 January 2026, with earlier application permitted (7.1.15; Application paragraph).
Mechanically, the Standard adds specific scope, measurement, hedge accounting and disclosure rules tailored to contracts referencing nature‑dependent electricity, defined as contracts that expose an entity to variability in the underlying amount of electricity because the generation depends on uncontrollable natural conditions such as weather (paragraph 2.3A). Key changes are: clarifying the application of the own‑use criteria to such contracts (AASB 7 paragraphs 5B-5D cross‑refer to AASB 9 paragraph 2.3A and B2.7-B2.8); permitting particular hedge accounting treatments when these contracts are used as hedging instruments, including the ability to designate a variable nominal amount of forecast electricity as hedged item (AASB 9 paragraphs 6.10.1-6.10.2); and requiring new, consolidated disclosures in AASB 7 about contracts that are outside the scope of AASB 9 because they meet the own‑use criteria, or that are used as hedging instruments (AASB 7 paragraphs 30A-30C). The Standard also inserts application guidance (AASB 9 Appendix B paragraphs B2.7-B2.8) explaining how to assess whether these contracts are held for the entity’s expected usage requirements, in particular by applying a “net purchaser” assessment and considering a reasonable amount of time not exceeding 12 months.
Current sections
Direct links to the current provisions in Accounting Standard AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity.
12
Obtaining a copy of this Accounting Stan
Obtaining a copy of this Accounting Standard
Obtaining a copy of this Accounting Standard
This Standard is available on the AASB Digital Standards Portal (standards.aasb.gov.au), which can also be accessed from aasb.gov.au.
This AASB Standard contains IFRS Foundation copyright material. Reproduction within Australia in unaltered form (retaining this notice) is permitted for personal and non-commercial use subject to the inclusion of an acknowledgment of the source. Requests and enquiries concerning reproduction and rights for commercial purposes within Australia should be addressed to The Managing Director, Australian Accounting Standards Board, PO Box 204, Collins Street West, Victoria 8007.
All existing rights in this material are reserved outside Australia. Reproduction outside Australia in unaltered form (retaining this notice) is permitted for personal and non-commercial use only. Further information and requests for authorisation to reproduce IFRS Foundation copyright material for commercial purposes outside Australia should be addressed to the IFRS Foundation at www.ifrs.org.
ISSN 1036-4803
Contents
Contents
Contents
Preface
Accounting Standard
AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity
from page
Objective 5
Application 5
Amendments to AASB 7 5
Amendments to AASB 9 7
COMMENCEMENT OF THE LEGISLATIVE INSTRUMENT 9
aVailable on the AASB website
IASB Illustrative Examples – Amendments
IASB Bases for Conclusions – Amendments
Australian Accounting Standard AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity is set out on pages 5–9. All the paragraphs have equal authority.
Preface
Preface
Preface
Standards amended by AASB 2025-1
This Standard makes amendments to AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014).
These amendments arise from the issuance of International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) by the International Accounting Standards Board in December 2024.
Main features of this Standard
Main requirements
Nature-dependent electricity contracts help entities to secure their electricity supply from sources such as wind and solar power. The amount of electricity generated under these contracts can vary based on uncontrollable factors such as weather conditions.
This Standard amends AASB 7 and AASB 9 to allow entities to better reflect these contracts in the financial statements. The amendments:
clarify the application of the ‘own-use’ criteria to nature-dependent electricity contracts;
permit hedge accounting if these contracts are used as hedging instruments; and
add new disclosure requirements to enable users of financial statements to better understand the effect of these contracts on an entity’s financial performance and cash flows.
Application date
This Standard applies to annual periods beginning on or after 1 January 2026. Earlier application is permitted.
Standards amended by AASB 2025-1
Standards amended by AASB 2025-1
Standards amended by AASB 2025-1
This Standard makes amendments to AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014).
These amendments arise from the issuance of International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) by the International Accounting Standards Board in December 2024.
Main features of this Standard
Main features of this Standard
Main features of this Standard
Main requirements
Nature-dependent electricity contracts help entities to secure their electricity supply from sources such as wind and solar power. The amount of electricity generated under these contracts can vary based on uncontrollable factors such as weather conditions.
This Standard amends AASB 7 and AASB 9 to allow entities to better reflect these contracts in the financial statements. The amendments:
clarify the application of the ‘own-use’ criteria to nature-dependent electricity contracts;
permit hedge accounting if these contracts are used as hedging instruments; and
add new disclosure requirements to enable users of financial statements to better understand the effect of these contracts on an entity’s financial performance and cash flows.
Application date
This Standard applies to annual periods beginning on or after 1 January 2026. Earlier application is permitted.
Accounting Standard AASB 2025-1
Accounting Standard AASB 2025-1
Accounting Standard AASB 2025-1
The Australian Accounting Standards Board makes Accounting Standard AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity under section 334 of the Corporations Act 2001.
Keith Kendall
Dated 3 February 2025 Chair – AASB
Objective
Objective
Objective
This Standard amends AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014) as a consequence of the issuance of International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) by the International Accounting Standards Board in December 2024.
Application
Application
Application
The amendments set out in this Standard apply to entities and financial statements in accordance with the application of AASB 7 and AASB 9 set out in AASB 1057 Application of Australian Accounting Standards.
This Standard applies to annual reporting periods beginning on or after 1 January 2026. Earlier application is permitted.
This Standard uses underlining, striking out and other typographical material to identify some of the amendments to AASB 7 and AASB 9 in order to make the amendments more understandable. However, the amendments made by this Standard do not include that underlining, striking out or other typographical material. Ellipses (…) are used to help provide the context within which amendments are made and also to indicate text that is not amended.
Amendments to AASB 7
Amendments to AASB 7
Amendments to AASB 7
Paragraphs 5B–5D, 30A–30C, 44OO–44PP and the subheading before paragraph 30A are added. Paragraph 5 is not amended but is included for ease of reference. New text is underlined.
Scope
...
5 This Standard applies to contracts to buy or sell a non-financial item that are within the scope of AASB 9.
...
5B Paragraph 30A applies only to contracts to buy nature-dependent electricity that satisfy the requirements in paragraph 2.3A of AASB 9 and are outside the scope of that Standard in accordance with paragraphs B2.7–B2.8 of AASB 9.
5C Paragraph 30B applies only to contracts that satisfy the requirements in paragraph 2.3A of AASB 9 and have been designated in a cash flow hedging relationship in accordance with paragraph 6.10.1 of AASB 9.
5D Paragraph 30C applies only to contracts that satisfy the requirements in paragraph 2.3A of AASB 9 and have been entered into with regards to an entity’s electricity purchases. These contracts comprise those:
(a) within the scope of AASB 9; and
(b) outside the scope of AASB 9 in accordance with paragraph 2.4 of that Standard, including those excluded in accordance with paragraphs B2.7–B2.8 of that Standard.
...
Significance of financial instruments for financial position and performance
30A An entity shall disclose in a single note in its financial statements information about contracts that meet the criteria set out in paragraph 5B. In particular, the entity shall disclose information that enables users of its financial statements to understand the effects these contracts have on the amount, timing and uncertainty of its future cash flows and on its financial performance. To meet these objectives, an entity shall disclose:
(a) information about contractual features that expose the entity to:
(i) variability in the underlying amount of electricity (see paragraph 2.3A of AASB 9); and
(ii) the risk that the entity would be required to buy electricity during a delivery interval in which the entity cannot use the electricity (see paragraph B2.7 of AASB 9).
(b) information about unrecognised commitments arising from such contracts as at the reporting date, including:
(i) the estimated future cash flows from buying electricity under these contracts. The entity shall apply its judgement when identifying the appropriate time bands within which to disclose the estimated future cash flows.
(ii) qualitative information about how the entity assesses whether a contract might become onerous (see AASB 137 Provisions, Contingent Liabilities and Contingent Assets), including the assumptions the entity uses in making this assessment.
(c) qualitative and quantitative information about effects on the entity’s financial performance for the reporting period. The disclosure is based on the information that is applicable to the reporting period that the entity used to assess whether it has been a net purchaser of electricity (see paragraph B2.8 of AASB 9). An entity shall disclose information for the reporting period about:
(i) the costs arising from purchases of electricity made under the contracts, disclosing separately how much of the purchased electricity was unused at the time of delivery;
(ii) the proceeds arising from sales of unused electricity; and
(iii) the costs arising from purchases of electricity made to offset sales of unused electricity.
30B An entity shall disaggregate, for its contracts that meet the criteria set out in paragraph 5C, the information the entity discloses, by risk category, about the terms and conditions of hedging instruments in accordance with paragraph 23A.
30C If an entity discloses information about other contracts referencing nature-dependent electricity as described in paragraph 5D (including those contracts described in paragraph 30B) in other notes in its financial statements, the entity shall include cross-references to those notes in the single note required by paragraph 30A.
...
Effective date and transition
...
44OO AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity, issued in February 2025, which also amended AASB 9, added paragraphs 5B–5D, 30A–30C and 44PP. An entity shall apply these paragraphs when it applies the amendments to AASB 9. If an entity does not restate comparative information when it first applies the amendments to AASB 9 in accordance with paragraph 7.2.51 of that Standard, the entity shall not provide comparative information for the disclosures required by paragraphs 30A–30C.
44PP In the reporting period in which an entity first applies AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity, the entity need not disclose the quantitative information that would otherwise be required by paragraph 28(f) of AASB 108.
Amendments to AASB 9
Amendments to AASB 9
Amendments to AASB 9
Paragraphs 2.3A–2.3B, 2.8, 6.10.1–6.10.2, 7.1.15, 7.2.51–7.2.53, B2.7–B2.8 and their subheadings are added. A subheading is also added before paragraph 2.4. Paragraph 2.6 is amended. New text is underlined. Paragraphs 2.4 and 2.5 are not amended but are included for ease of reference.
Chapter 2 Scope
...
2.3A Paragraphs 6.10.1–6.10.2 and B2.7–B2.8 apply only to contracts referencing nature-dependent electricity. Contracts referencing nature-dependent electricity are contracts that expose an entity to variability in the underlying amount of electricity because the source of electricity generation depends on uncontrollable natural conditions (for example, the weather). Contracts referencing nature-dependent electricity include both contracts to buy or sell nature-dependent electricity and financial instruments that reference such electricity.
2.3B An entity shall not apply paragraphs 6.10.1–6.10.2 and B2.7–B2.8 by analogy to other contracts, items or transactions.
Contracts to buy or sell non‑financial items
2.4 This Standard shall be applied to those contracts to buy or sell a non‑financial item that can be settled net in cash or another financial instrument, or by exchanging financial instruments, as if the contracts were financial instruments, with the exception of contracts that were entered into and continue to be held for the purpose of the receipt or delivery of a non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements. However, this Standard shall be applied to those contracts that an entity designates as measured at fair value through profit or loss in accordance with paragraph 2.5.
2.5 A contract to buy or sell a non‑financial item that can be settled net in cash or another financial instrument, or by exchanging financial instruments, as if the contract was a financial instrument, may be irrevocably designated as measured at fair value through profit or loss even if it was entered into for the purpose of the receipt or delivery of a non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements. This designation is available only at inception of the contract and only if it eliminates or significantly reduces a recognition inconsistency (sometimes referred to as an ‘accounting mismatch’) that would otherwise arise from not recognising that contract because it is excluded from the scope of this Standard (see paragraph 2.4).
2.6 There are various ways in which a contract to buy or sell a non-financial item can be settled net in cash or another financial instrument or by exchanging financial instruments. These include:
...
A contract to which (b) or (c) applies is not entered into for the purpose of the receipt or delivery of the non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements and, accordingly, is within the scope of this Standard. Other contracts (which include contracts as described in paragraph 2.3A) to which paragraph 2.4 applies are evaluated to determine whether they were entered into and continue to be held for the purpose of the receipt or delivery of the non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements and, accordingly, whether they are within the scope of this Standard.
...
2.8 An entity shall also apply paragraphs B2.7–B2.8 to assess whether contracts referencing nature-dependent electricity (as described in paragraph 2.3A) are entered into and continue to be held for the purpose of the receipt of electricity in accordance with the entity’s expected usage requirements.
...
6.10.1 Some contracts referencing nature-dependent electricity are designated as hedging instruments in hedges of forecast electricity transactions. In addition to the requirements in paragraph 6.3.7, for such a hedging relationship an entity is permitted to designate as the hedged item a variable nominal amount of forecast electricity transactions that is aligned with the variable amount of nature-dependent electricity expected to be delivered by the generation facility as referenced in the hedging instrument. The other hedge accounting requirements of this chapter continue to apply to such a hedging relationship.
6.10.2 If the cash flows of the contract referencing nature-dependent electricity designated as the hedging instrument are conditional on the occurrence of a forecast transaction that is designated as the hedged item in accordance with paragraph 6.10.1, this forecast transaction is presumed to be highly probable as required by paragraph 6.3.3.
Chapter 7 Effective date and transition
7.1 Effective date
...
7.1.15 AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity, issued in February 2025, added paragraphs 2.3A–2.3B, 2.8, 6.10.1–6.10.2, 7.2.51–7.2.53, and B2.7–B2.8 and amended paragraph 2.6. An entity shall apply these amendments for annual reporting periods beginning on or after 1 January 2026. Early application is permitted. If an entity applies the amendments for an earlier period, it shall disclose that fact.
7.2 Transition
...
Transition for Contracts Referencing Nature-dependent Electricity
7.2.51 An entity shall apply paragraphs 2.3A–2.3B, 2.8 and B2.7–B2.8 retrospectively in accordance with AASB 108 using the facts and circumstances at the date of initial application (the date when an entity first applies the amendments). The date of initial application shall be the beginning of a reporting period, which might be a reporting period other than an annual reporting period. An entity need not restate prior periods to reflect the application of these amendments. The entity is permitted to restate prior periods only if it is possible to do so without the use of hindsight. If the entity does not restate prior periods, it shall recognise any difference between the previous carrying amount and the carrying amount at the date of initial application of these amendments in the opening retained earnings (or other component of equity, as appropriate) at the beginning of that reporting period.
7.2.52 If a contract referencing nature-dependent electricity (as described in paragraph 2.3A) would be outside the scope of AASB 9 as a result of applying the requirements in paragraphs B2.7−B2.8, an entity is permitted, at the date of initial application, to irrevocably designate this contract as measured at fair value through profit or loss in accordance with paragraph 2.5.
7.2.53 An entity shall apply paragraphs 6.10.1–6.10.2 prospectively to new hedging relationships designated on or after the date of initial application. An entity is permitted, at the date of initial application, to discontinue a hedging relationship in which a contract referencing nature-dependent electricity (as described in paragraph 2.3A) has been designated as the hedging instrument, if the same hedging instrument is designated in a new hedging relationship in accordance with paragraphs 6.10.1–6.10.2.
...
Appendix B
Application guidance
This appendix is an integral part of AASB 9.
Scope (Chapter 2)
...
Contracts to buy nature-dependent electricity
B2.7 Some contracts referencing nature-dependent electricity (as described in paragraph 2.3A) require an entity to buy and take delivery of the electricity when it is generated. These contractual features expose the entity to the risk that it would be required to buy electricity during a delivery interval in which the entity cannot use the electricity. The entity might also have no practical ability to avoid making sales of unused electricity because the design and operation of the electricity market in which the electricity is transacted under the contract require any amounts of unused electricity to be sold within a specified time. When an entity applies the requirements in paragraph 2.4, such sales are not necessarily inconsistent with the contract being held in accordance with the entity’s expected usage requirements. An entity entered into and continues to hold such a contract in accordance with its expected electricity usage requirements if the entity has been, and expects to be, a net purchaser of electricity for the contract period. An entity is a net purchaser of electricity if it buys sufficient electricity to offset the sales of any unused electricity in the same market in which it sold the electricity.
B2.8 In determining whether an entity is a net purchaser of electricity, the entity shall consider reasonable and supportable information (that is available without undue cost or effort) about its past, current and expected future electricity transactions over a reasonable amount of time. The entity identifies ‘a reasonable amount of time’ by considering the variability in the amount of electricity expected to be generated due to the seasonal cycle of the natural conditions and the variability in the entity’s demand for electricity due to its operating cycle. In determining whether the entity has been a net purchaser, ‘a reasonable amount of time’ shall not exceed 12 months.
Commencement of the legislative instrume
Commencement of the legislative instrument
Commencement of the legislative instrument
For legal purposes, this legislative instrument commences on 31 December 2025.
Source text: opening excerpt
Sourced from the Federal Register of Legislation (legislation.gov.au), CC BY 4.0.
Obtaining a copy of this Accounting Stan Obtaining a copy of this Accounting Standard
Obtaining a copy of this Accounting Standard
This Standard is available on the AASB Digital Standards Portal (standards.aasb.gov.au), which can also be accessed from aasb.gov.au.
This AASB Standard contains IFRS Foundation copyright material. Reproduction within Australia in unaltered form (retaining this notice) is permitted for personal and non-commercial use subject to the inclusion of an acknowledgment of the source. Requests and enquiries concerning reproduction and rights for commercial purposes within Australia should be addressed to The Managing Director, Australian Accounting Standards Board, PO Box 204, Collins Street West, Victoria 8007.
All existing rights in this material are reserved outside Australia. Reproduction outside Australia in unaltered form (retaining this notice) is permitted for personal and non-commercial use only. Further information and requests for authorisation to reproduce IFRS Foundation copyright material for commercial purposes outside Australia should be addressed to the IFRS Foundation at www.ifrs.org.
ISSN 1036-4803
Contents Contents
Contents
Preface
Accounting Standard
AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity
from page
Objective 5
Application 5
Amendments to AASB 7 5
Amendments to AASB 9 7
COMMENCEMENT OF THE LEGISLATIVE INSTRUMENT 9
aVailable on the AASB website
IASB Illustrative Examples – Amendments
IASB Bases for Conclusions – Amendments
Australian Accounting Standard AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity is set out on pages 5–9. All the paragraphs have equal authority.
Transition mechanics are specified. Some elements must be applied retrospectively in line with AASB 108 (paragraph 7.2.51), but entities are permitted not to restate prior periods if doing so would require hindsight. If prior periods are not restated, differences are recognised in opening retained earnings or other equity components. For contracts that would be outside the scope of AASB 9 on application, an irrevocable designation at initial application to measure at fair value through profit or loss is permitted (7.2.52). Hedge accounting provisions applying to new designations are prospective (7.2.53). The Standard includes limited relief for first‑time adopters of the amendments, for example not requiring some comparative quantitative information in the first period of application (44PP and 44OO).
The instrument is procedural rather than substantive tax or criminal law. It alters accounting recognition, measurement choices, hedge accounting eligibility and disclosure obligations for a narrow class of electricity contracts described in the text. The Standard does not itself set civil penalties. It integrates with the existing Australian accounting framework by amending AASB 7 and AASB 9 and by linking to AASB 1057 for application (Application paragraph).
Main concepts
The Standard revolves around a small set of linked technical concepts introduced into AASB 7 and AASB 9, each explicitly defined or constrained in the text. The primary conceptual building blocks are: (1) contracts referencing nature‑dependent electricity; (2) the own‑use or expected usage test for non‑financial contracts that otherwise might be within the scope of AASB 9; (3) specific hedge accounting permissibility and mechanics for variable nominal amounts; and (4) disclosure requirements targeted at users’ understanding of cash flow variability and financial performance effects.
Contracts referencing nature‑dependent electricity are those that expose an entity to variability in the underlying amount of electricity because generation depends on uncontrollable natural conditions, for example weather. The definition is in paragraph 2.3A. The Standard forbids extending these rules by analogy beyond the specified subject matter (2.3B), so the amendments only apply to contracts that meet that narrow factual characteristic.
The own‑use or expected usage assessment is a recurring concept. AASB 9 paragraph 2.4 and related guidance determine when contracts to buy or sell non‑financial items are excluded from the scope of financial instruments accounting because they were entered into and continue to be held for delivery or receipt in accordance with expected purchase, sale or usage requirements. For nature‑dependent electricity contracts, AASB 9 requires application of additional guidance (paragraph 2.8, and Appendix B paragraphs B2.7-B2.8) to decide whether a particular contract is outside the scope of AASB 9 or within it. Appendix B explains the “net purchaser” idea: an entity entered into and continues to hold such a contract in accordance with expected electricity usage requirements if it has been, and expects to be, a net purchaser of electricity for the contract period, meaning it buys sufficient electricity to offset sales of any unused electricity in the same market (B2.7). When assessing net purchaser status, the entity must consider reasonable and supportable information about past, current and expected future electricity transactions over a reasonable amount of time, and that reasonable amount of time shall not exceed 12 months when determining whether the entity has been a net purchaser (B2.8).
Hedge accounting adaptations are precise. Paragraphs 6.10.1-6.10.2 permit an entity to designate as the hedged item a variable nominal amount of forecast electricity that is aligned with the variable amount of nature‑dependent electricity expected to be delivered by the referenced generation facility. This sits in addition to other hedge accounting requirements (6.10.1). Paragraph 6.10.2 creates a presumption that a forecast transaction conditional on the cash flows of the contract is highly probable for hedge accounting purposes.
Disclosures are consolidated into a single note requirement in AASB 7 (paragraph 30A). The note must enable users to understand the effects of these contracts on amount, timing and uncertainty of future cash flows and on financial performance. Disclosures required include contractual features exposing the entity to variability and to the risk of being required to buy electricity it cannot use (30A(a)), unrecognised commitments with estimated future cash flows and qualitative information about assessing onerousness (30A(b)), and reporting‑period information on costs of purchases, proceeds from sales of unused electricity, and costs of purchases made to offset those sales (30A(c)). For contracts designated as hedging instruments, entities must disaggregate terms and conditions by risk category in accordance with paragraph 23A (30B). Cross‑reference rules are in 30C.
Transition concepts include retrospective application of some scope changes under AASB 108 using the facts and circumstances at the date of initial application (7.2.51), optional irrevocable designation at initial application to measure certain contracts at fair value through profit or loss (7.2.52), and prospective application for hedge accounting (7.2.53). The Standard also includes limited relief in the first reporting period for certain AASB 108 comparative disclosure requirements (44PP and 44OO).
Collectively, these concepts create a framework where an entity must first categorise whether a nature‑dependent electricity contract sits inside or outside AASB 9, then apply measurement and hedge accounting rules accordingly, and finally provide a targeted single‑note disclosure to explain the cash flow and performance effects to users.
Who it affects
The Standard targets any entity that enters into contracts referencing nature‑dependent electricity, or that holds financial instruments referencing such electricity. That includes non‑financial corporates that procure electricity from wind, solar or other generation whose output varies with natural conditions, entities that purchase bundled or shaped electricity products tied to specific generation facilities, energy retailers, large energy users with bespoke power purchase arrangements, and entities that use such contracts as hedging instruments for forecast electricity transactions. The definition in paragraph 2.3A covers both buy and sell contracts and financial instruments that reference nature‑dependent electricity.
Financial statement preparers across a range of industries are affected. Preparers must determine whether existing or new contracts meet the 2.3A description, and then apply the Appendix B guidance to decide whether the contract is within AASB 9 or excluded as expected usage. Where contracts are excluded from AASB 9 by the own‑use test but still meet the specific nature‑dependent characteristics, AASB 7 requires the single consolidated note (30A) disclosing contractual features, unrecognised commitments and reporting‑period effects on costs and proceeds. Preparers who designate these contracts as hedging instruments are subject to the modified hedge accounting mechanics in paragraphs 6.10.1-6.10.2 and the related disclosure disaggregation requirements (30B).
Auditors and assurance professionals are affected because they must assess whether management’s judgements in applying the new guidance are reasonable, documented and supported. The Standard requires judgement about reasonable and supportable information for net purchaser assessments and about assumptions used when determining whether contracts might become onerous (30A(b)(ii) cross‑refers to AASB 137). Auditors will need evidence on historical and expected electricity transactions, the choice of time bands for estimated future cash flows, and the basis for any irrevocable designation to measure a contract at fair value through profit or loss.
Users of financial statements are affected indirectly because AASB 7 adds prescribed disclosure designed to improve understanding of the timing, amount and uncertainty of cash flows arising from these contracts (30A), and to distinguish hedging activity by risk category (30B). Regulators and standard setters are affected because the AASB adopted the IASB amendments and linked them into AASB 7 and AASB 9, including transition mechanics and effective date (7.1.15; commencement).
Market intermediaries and systems providers are also affected. Entities will need systems, controls and data capture to estimate variability in generation linked to natural conditions, to track volumes of unused electricity sold within specified market time bands, to calculate estimated future cash flows for unrecognised commitments, and to support hedge documentation when designating variable nominal amounts as hedged items. The Appendix B guidance constrains the time horizon for assessing “been a net purchaser” to not more than 12 months for determining whether the entity has been a net purchaser (B2.8), which may require transactional analysis for at least that rolling period.
Finally, the Standard expressly limits its own reach. Paragraph 2.3B prevents entities from applying these rules by analogy to other types of contracts, which narrows the affected population to contracts referencing nature‑dependent electricity only.
Key duties and rights
The instrument imposes specific duties on entities that have contracts referencing nature‑dependent electricity, and it grants certain accounting choices to those entities. The duties are primarily disclosure and assessment obligations, together with certain measurement and hedge accounting consequences that an entity must apply if it elects the permitted options.
Disclosure duties under AASB 7 are explicit. Paragraph 30A requires an entity to disclose, in a single note, information enabling users to understand the effects these contracts have on the amount, timing and uncertainty of future cash flows and on financial performance. The duty includes disclosing contractual features that expose the entity to variability in the underlying amount (30A(a)(i)) and to the risk of being required to buy electricity it cannot use (30A(a)(ii)). The entity must disclose unrecognised commitments and estimated future cash flows from buying electricity under these contracts and apply judgement in selecting time bands for those cash flow estimates (30A(b)(i)). The entity must provide qualitative information about how it assesses whether a contract might be onerous and disclose the assumptions used in that assessment (30A(b)(ii)). For the reporting period, the entity must disclose costs from purchases of electricity under the contracts, separately disclose how much was unused at delivery (30A(c)(i)), disclose proceeds from sales of unused electricity (30A(c)(ii)), and disclose costs from purchases to offset sales of unused electricity (30A(c)(iii)). These are duties, not options.
Assessment duties are set out in AASB 9 and Appendix B. Paragraphs 2.4, 2.5, 2.8 and B2.7-B2.8 require entities to assess whether contracts are held for expected receipt or delivery and thus excluded from AASB 9. The Appendix B test requires entities to determine whether they have been and expect to be a net purchaser of electricity for the contract period. The net purchaser test must rely on reasonable and supportable information available without undue cost or effort about past, current and expected transactions, and the reasonable amount of time considered shall not exceed 12 months when determining whether the entity has been a net purchaser (B2.8). These are ongoing duties requiring judgement and documentation.
Rights and options include measurement and hedge accounting elections. Paragraph 2.5 permits irrevocable designation at inception of a contract to measure it at fair value through profit or loss even if it was entered into for expected receipt or delivery, but only if designation eliminates or significantly reduces an accounting mismatch. Separately, transition paragraph 7.2.52 permits an entity, at the date of initial application of the amendments, to irrevocably designate contracts that would otherwise be outside the scope of AASB 9 as measured at fair value through profit or loss. Entities have a right to make that irrevocable election.
Hedge accounting rights are expanded but conditional. Under paragraph 6.10.1, an entity is permitted to designate a variable nominal amount of forecast electricity transactions as the hedged item, aligned with the variable nature of the generation referenced in the hedging instrument. The other hedge accounting requirements continue to apply. Paragraph 6.10.2 presumes that a forecast transaction that is conditional on such a hedging instrument is highly probable for hedge accounting purposes. Entities therefore have the ability to use these contracts as hedging instruments subject to meeting standard hedge accounting documentation and effectiveness requirements.
Transition rights affect reporting choices. Paragraph 7.2.51 allows retrospective application of paragraphs 2.3A-2.3B, 2.8 and B2.7-B2.8 in accordance with AASB 108 but permits entities not to restate prior periods if restatement would require hindsight. If prior periods are not restated, the entity recognises the difference in opening retained earnings (or other component of equity) at the date of initial application. Paragraph 7.2.53 permits an entity to discontinue an existing hedging relationship involving a contract referencing nature‑dependent electricity and to designate the same instrument in a new hedging relationship under the new paragraphs, allowing some flexibility in aligning hedge accounting with the amended rules.
Recordkeeping and cross‑reference duties arise under AASB 7 paragraph 30C which requires, where contracts are described in other notes, cross‑references to those notes in the single note required by paragraph 30A. Paragraph 30B imposes a duty to disaggregate hedging instrument information by risk category in accordance with paragraph 23A, which connects to existing disaggregation duties.
The Standard does not itself specify enforcement or penalties. It is made under section 334 of the Corporations Act 2001 and it refers reporting entities to existing application rules in AASB 1057. The duties and rights therefore sit within the broader Australian financial reporting framework, and compliance will be realised through that framework.
Penalties and enforcement
The text of AASB 2025-1 does not create new criminal sanctions, civil penalties or an enforcement regime within the instrument itself. The Standard is issued by the AASB under section 334 of the Corporations Act 2001, as stated at the head of the Accounting Standard (Accounting Standard AASB 2025-1). The instrument integrates into the existing Australian accounting framework and refers entities to application rules in AASB 1057 (Application paragraph), and to transitional rules under AASB 108 (7.2.51). The Standard therefore operates as part of the body of Australian Accounting Standards.
Enforcement of accounting standards in Australia typically occurs through statutory reporting obligations and the powers of regulators and stakeholders outside the Standard itself. The text does not purport to confer enforcement authority or list specific penalties. The Standard’s legal basis under section 334 means it is an Australian Accounting Standard for the purposes of the Corporations Act framework, and hence it will apply to entities required to prepare financial reports under that Act. The instrument does not modify the Corporations Act’s enforcement provisions, and it does not purport to create separate sanctions.
Practical enforcement therefore relies on existing mechanisms external to the Standard, not contained in this text. Those mechanisms include company law reporting obligations, audit and assurance processes, and the oversight roles of regulatory bodies that operate under separate legislation. The Standard makes repeated cross‑references to other Australian Accounting Standards when prescribing duties, for example AASB 7, AASB 9, AASB 1057 and AASB 108, which are themselves part of the statutory framework.
Because the instrument does not specify penalties, entities should be aware that non‑compliance will be assessed under the existing applicable regulatory and governance framework. The absence of specified penalties in the Standard does not mean the reporting consequences are unenforceable. Rather, the Standard defines required accounting treatment and disclosures that form part of the financial statements that, when prepared for statutory or regulated disclosure purposes, are subject to audit, oversight and any legal consequences attached to false or misleading statements under the Corporations Act and other regimes. The Standard itself, however, limits itself to setting accounting requirements and transition mechanics.
Readers should note that the Standard contains transitional relief and discretion over restatement. For example, paragraph 7.2.51 allows an entity not to restate prior periods where restatement would require hindsight, and to recognise differences in opening retained earnings. Paragraph 44OO provides practical transitional disclosure relief for comparative information if the entity does not restate comparative information when it first applies the amendments to AASB 9. These transitional provisions may affect the timing and scope of any supervisory review that would otherwise follow a strict restatement.
In short, the Standard prescribes accounting duties and gives choices, but it does not itself create a novel enforcement mechanism or list penalties. Those consequences will flow from the broader statutory reporting environment and customary audit and regulatory practices outside the text.
How it interacts with other laws
AASB 2025-1 is drafted to sit within the existing suite of Australian Accounting Standards and cross‑references a number of them. The instrument explicitly amends AASB 7 and AASB 9 and links its application to AASB 1057 Application of Australian Accounting Standards (Application paragraph). It also directs transition work to AASB 108 Accounting Policies, Changes in Accounting Estimates and Errors (7.2.51 and 44PP). The Standard cross‑refers to AASB 137 Provisions, Contingent Liabilities and Contingent Assets by requiring qualitative information about how the entity assesses whether a contract might become onerous (30A(b)(ii)). The inserted AASB 7 disclosure paragraph 30B also requires disaggregation “in accordance with paragraph 23A”, which is an existing AASB 7 disclosure requirement and therefore ties the new disclosures to the broader AASB 7 disclosure architecture.
Statutory context is limited in the text to the enabling provision. The accounting standard is made under section 334 of the Corporations Act 2001 (Accounting Standard AASB 2025-1), which is the usual legislative basis for AASB standards. The Standard itself does not vary Corporations Act reporting obligations, but as a legislative instrument it modifies the content of the binding Australian Accounting Standards that entities must apply when they prepare financial reports required under the Corporations Act. Therefore the interaction with company law comes through the statutory requirement to apply Australian Accounting Standards when preparing financial reports.
The Standard incorporates an international element. It implements the IASB’s December 2024 IFRS amendments by amending AASB 7 and AASB 9, and it copies or adapts the IASB material, including the IASB Illustrative Examples and IASB Bases for Conclusions, which the AASB makes available as supporting material (Contents). The copyright notice states that the Standard contains IFRS Foundation copyright material and notes reproduction conditions; those copyright terms are separate legal constraints on redistribution of the IFRS content, and are stated in the prefatory material.
Regulatory and market interactions are indirect but factual. The Standard assumes the design and operation of electricity markets may require any unused electricity to be sold within a specified time, and this market design feeds directly into the accounting outcome via Appendix B paragraph B2.7. That means the accounting treatment of these contracts depends on how the electricity market operates in practice, which could interact with energy market rules, contracts law, and regulatory frameworks governing electricity trading. The Standard does not alter those market rules, but it requires an accounting assessment that is responsive to them.
The Standard also interacts with hedge accounting rules that are part of AASB 9 and the broader financial reporting regime. Paragraphs 6.10.1-6.10.2 modify hedge accounting practice for entities that use these contracts to hedge forecast electricity transactions. Those amendments interact with existing hedge effectiveness, documentation and designation requirements in AASB 9.
Transition and application of the amendments require application of AASB 108. The retrospective application required by 7.2.51 is via AASB 108 procedures, including recognition in opening retained earnings where restatement is not performed. The Standard provides limited relief for comparative disclosure in the first period of application (44OO; 44PP). Therefore entities must coordinate application of these amendments with existing accounting policy change rules under AASB 108.
Finally, the Standard explicitly limits analogy. Paragraph 2.3B states an entity shall not apply paragraphs 6.10.1-6.10.2 and B2.7-B2.8 by analogy to other contracts, items or transactions. That limits spillover of these accounting rules into other realms of contract law or accounting that do not encompass nature‑dependent electricity characteristics.
In sum, the Standard modifies accounting rules within the established Australian accounting and corporate reporting framework, it references and relies on other Australian Accounting Standards for application and transition, and it ties accounting outcomes to actual electricity market design facts without changing those external market rules.
Amendment history
AASB 2025-1 is a single legislative instrument that implements the IASB’s December 2024 IFRS amendments relating to contracts referencing nature‑dependent electricity. The instrument was issued by the Australian Accounting Standards Board and is dated 3 February 2025, signed by the Chair (Accounting Standard AASB 2025-1). The prefatory material states the amendments arise from the IASB issuance in December 2024 and that the Standard makes amendments to AASB 7 and AASB 9. The Standard amends AASB 7 by inserting paragraphs 5B-5D, 30A-30C, 44OO-44PP and a subheading before paragraph 30A, and amends AASB 9 by adding paragraphs 2.3A-2.3B, 2.8, 6.10.1-6.10.2, 7.2.51-7.2.53, and B2.7-B2.8, and by amending paragraph 2.6, with paragraph 7.1.15 recording the effective date for those amendments. The instrument includes guidance text for ease of reference and uses typographical conventions to show inserted text in the published standard, while noting the typographical marking is for readability only and not part of the operative amendments.
The key dates in the instrument are these. The IASB issued the IFRS amendments in December 2024, prompting the AASB amendments. The AASB Standard itself is dated 3 February 2025. For legal purposes, the legislative instrument commences on 31 December 2025 (Commencement paragraph). The amendments are effective for annual reporting periods beginning on or after 1 January 2026, with earlier application permitted (7.1.15; Application paragraph). The Standard provides transitional mechanics in 7.2.51-7.2.53 and provides relief for comparative disclosure in the first reporting period of application (44OO and 44PP).
The Standard also records the inclusion of accompanying materials: IASB Illustrative Examples and IASB Bases for Conclusions are made available adjacent to the Standard on the AASB website, as referenced in the Contents. The copyright section notes that the AASB Standard contains IFRS Foundation copyright material, and it sets out permissions and reproduction conditions.
No further amendment history prior to issuance is recorded in the text provided. There is no schedule of previous exposures, consultation papers, or separate AASB project history within this instrument. The Standard’s transition paragraphs (7.2.51-7.2.53) set out the precise mechanics for initial application, including a permission at initial application to irrevocably designate certain contracts as measured at fair value through profit or loss (7.2.52) and prospective application of the hedge accounting amendments (7.2.53).
Because the instrument is an implementing amendment that imports an IASB change, future amendment history will depend on the AASB’s approach to any subsequent IASB revisions, and on domestic policy decisions should the AASB choose to change the Australian implementation. The published instrument does not describe any planned future changes beyond the stated effective date and transitional provisions.
Litigation history
The instrument as provided contains no litigation history. It does not reference any judicial decisions, case law, or administrative determinations. The text is limited to amending AASB 7 and AASB 9 and providing related application, transition and disclosure text. There are no party names, disputes or precedent citations contained in the Standard.
Because the Standard is an accounting standard enacted under the Corporations Act framework, it may in future be the subject of disputes over interpretation in litigation or regulatory enforcement actions, but the instrument itself does not record or cite any such matters. The Standard contains no settled or cited cases as authorities, and it expressly relies on the IASB’s December 2024 amendments as the basis for its changes.
If a reader requires information about disputes or litigation that might arise from these amendments, that material is not contained in this text and would need to be sought from regulatory bodies, court records or subsequent administrative decisions. As at the text provided, no litigation history is recorded.
Gotchas
The Standard contains several technical and operational traps for the unwary. These are not legal opinions, they are mechanistic sources of compliance or reporting risk that arise directly from the text.
Narrow material scope and anti‑analogy rule. Paragraph 2.3A defines contracts referencing nature‑dependent electricity narrowly. Paragraph 2.3B forbids applying the new paragraphs by analogy to other contracts, items or transactions. Entities with contracts that have some seasonal variability but that are not explicitly linked to natural generation variability cannot assume these rules apply.
The own‑use assessment is fact sensitive and capped. Appendix B paragraphs B2.7-B2.8 require a “net purchaser” assessment and the use of reasonable and supportable information about past, current and expected transactions. Importantly, when determining whether the entity has been a net purchaser, the reasonable amount of time considered shall not exceed 12 months (B2.8). Entities that use longer historical periods for other purposes must not default to those periods for this test, which could materially change the outcome.
Judgement over “reasonable and supportable information” and time bands. Paragraph 30A(b)(i) requires estimated future cash flows disclosed in time bands chosen by judgement. The Standard requires the entity to apply its judgement when identifying appropriate time bands. That creates a disclosure comparability and audit risk if time‑band choices are not well documented or are inconsistent across reporting periods.
Unused electricity accounting and market rules interaction. Appendix B B2.7 recognises that market design may force sale of unused electricity within specified time frames and that sales do not automatically defeat the own‑use test. Entities must understand actual market obligations and how trade timing rules operate, because those market features determine whether the entity is a net purchaser and thus whether the contract sits within or outside AASB 9.
Single note requirement with cross‑references. AASB 7 paragraph 30A requires a single note with specific elements. Paragraph 30C allows cross‑references to other notes only if the entity discloses other contracts referencing nature‑dependent electricity elsewhere, but the single note must still exist. Failure to include full disclosures in the single note, or to cross‑reference correctly, risks non‑compliance.
Hedge accounting mechanics and presumption of high probability. Paragraph 6.10.1 permits designation of a variable nominal amount as the hedged item, but other hedge accounting requirements apply. Paragraph 6.10.2 presumes that a forecast transaction conditional on the hedging contract is highly probable. Entities must still satisfy hedge documentation and effectiveness rules, and the presumption does not eliminate other qualifying criteria. Misunderstanding that 6.10.2 automatically creates hedge eligibility could lead to inadequate hedge documentation.
Transition choices can affect comparatives. Paragraph 7.2.51 permits retrospective application but does not force restatement where restatement requires hindsight. If an entity elects not to restate, it must recognise differences in opening retained earnings. Paragraph 44OO specifies that if an entity does not restate comparative information when applying the AASB 9 amendments, it shall not provide comparative information for the disclosures required by paragraphs 30A-30C. Entities that fail to take the election formally or document the reason for not restating may face inconsistent comparatives.
Irrevocable designations at initial application. Paragraph 7.2.52 permits irrevocable designation at the date of initial application to measure certain contracts at fair value through profit or loss. The irrevocable nature of that election means preparers should carefully evaluate the decision and support it with documentation before making the election.
Operational data and systems burden. The Standard implicitly requires data about volumes generated and delivered by generation facilities, amounts of electricity unused at delivery, proceeds from sales of unused electricity, and costs to offset those sales. Entities without billing and control systems that can produce reliable, timely data for the required disclosures will face operational headaches.
Disclosure linkage to provision rules. Paragraph 30A(b)(ii) requires qualitative disclosure about how the entity assesses whether a contract might become onerous, with a cross‑reference to AASB 137. Entities must align their onerous contract assessments and provisioning practices with the disclosure requirements, which may expose assumptions to closer scrutiny.
Not an escape hatch for other commodities. The Standard is specific to nature‑dependent electricity. Entities with contracts referencing other weather‑dependent commodities or volumes cannot import these mechanics by analogy, per paragraph 2.3B.
Effective date and legal commencement are close. The legal commencement is 31 December 2025 and the accounting effective date is annual periods beginning on or after 1 January 2026 (Application paragraph; Commencement). Practically, preparers must plan quickly to apply the new rules for year ends early in 2026.
In short, the combination of judgement heavy assessments, data requirements, irrevocable election options, and transitional choices create implementation risk. Each step requires documented rationale tied to the specific paragraphs cited above.
How to comply
Compliance requires a programme that maps the instrument’s textual requirements to process, control and disclosure outputs. Below are concrete steps, with cross‑references to the controlling paragraphs.
Identify relevant contracts. Screen all electricity procurement and sale contracts and financial instruments to identify those that expose the entity to variability in the underlying amount of electricity because the generation source depends on uncontrollable natural conditions, as defined in paragraph 2.3A.
Apply the scope assessment. For each identified contract, apply AASB 9 paragraph 2.4 and 2.5 and the Appendix B guidance B2.7-B2.8. Determine whether each contract is within the scope of AASB 9 or excluded as entered into and held for expected purchase, sale or usage requirements. When applying B2.8, consider reasonable and supportable information about past, current and expected future electricity transactions. Ensure that the “been a net purchaser” assessment uses a time horizon not exceeding 12 months when determining whether the entity has been a net purchaser (B2.8).
Document judgements and evidence. Maintain contemporaneous documentation of the facts and circumstances relied upon for scope assessments, including market rules that require sale of unused electricity, volumes bought and sold, forecasts of expected usage, and the chosen period used for the net purchaser test. Where management uses the permitted decision to not restate prior periods, document the reasons and the calculation used to determine the opening retained earnings adjustment required by paragraph 7.2.51.
Decide on measurement elections. Where AASB 9 would otherwise exclude contracts but the entity prefers to measure at fair value through profit or loss, evaluate the availability and appropriateness of the irrevocable designation at inception under paragraph 2.5, or the one‑time irrevocable designation at initial application under paragraph 7.2.52. Document the rationale for any designation and the elimination or significant reduction of recognition inconsistency when using paragraph 2.5.
Hedge accounting procedures. If a contract referencing nature‑dependent electricity is to be used as a hedging instrument, prepare hedge documentation that records designation, hedged risk, hedged item and the determination of the variable nominal amount of the forecast electricity transactions that will be designated as the hedged item (6.10.1). Ensure the entity observes the other hedge accounting requirements in Chapter 6 of AASB 9. Where cash flows of the hedging instrument are conditional on the occurrence of the forecast transaction, rely on paragraph 6.10.2’s presumption of high probability only where appropriate, and document evidence supporting that presumption.
Build the single note. Prepare the single note required by AASB 7 paragraph 30A. The note must include:
contractual features exposing the entity to variability in underlying electricity volumes and to the risk of being required to buy electricity it cannot use (30A(a));
unrecognised commitments and estimated future cash flows from buying electricity under the contracts, with reasoned time bands chosen by management (30A(b)(i));
qualitative description of how management assesses whether a contract might become onerous and the assumptions used (30A(b)(ii));
reporting‑period disclosures of costs arising from purchases, the portion unused at delivery, proceeds from sales of unused electricity, and costs arising from purchases to offset sales of unused electricity (30A(c)(i)-(iii)).
If hedging instruments are used and meet paragraph 5C conditions, disaggregate hedging instrument terms by risk category in accordance with paragraph 23A (30B). If related information appears elsewhere in the financial statements, include cross‑references from the single note as required by 30C.
Choose transition approach and make elections. Decide whether to apply paragraphs 2.3A-2.3B, 2.8 and B2.7-B2.8 retrospectively in accordance with AASB 108 or to apply them without restating prior periods, recognising differences in opening retained earnings (7.2.51). If not restating, be aware of paragraph 44OO which states entities that do not restate comparatives shall not provide comparative information for disclosures required by 30A-30C. If choosing the irrevocable designation at initial application to measure a contract at fair value through profit or loss, document that election per 7.2.52. Plan for prospective application of hedge accounting amendments for new hedging relationships designated on or after the date of initial application (7.2.53).
Strengthen systems and controls. Implement or modify systems to capture:
volumes expected to be delivered by referenced generation facilities;
actual electricity received and unused at delivery;
proceeds from sales of unused electricity in the market and timing of such sales;
forecast transactions used in hedge relationships and the variable nominal quantities designated.
Ensure internal control procedures capture the assumptions and methods used to estimate future cash flows and to determine whether contracts may be onerous, supporting the AASB 7 disclosures.
Engage auditors early. Discuss with external auditors the approach to scope assessments, measurement elections and the composition of the single note. Provide auditors with the documentation required by AASB 108 for any prior period adjustments or opening retained earnings recognitions.
Communicate with stakeholders. Coordinate disclosure drafting with treasury, commercial, legal and sustainability teams because the accounting position derives from contract terms, electricity market rules, and generation variability. Ensure cross‑functional sign‑off on key assumptions disclosed in the single note and on any irrevocable election.
Monitor market rule changes. Because Appendix B explicitly recognises market design may require sale of unused electricity within specified time bands (B2.7), entities should monitor changes to electricity market rules and adapt the accounting assessment and disclosures accordingly.
Compliance timetable. Legal commencement is 31 December 2025 and the Standard applies to annual periods beginning on or after 1 January 2026 (Commencement; 7.1.15). Build a project plan that completes identification, assessment, system changes, documentation and draft disclosures sufficiently ahead of the first reporting date affected.
By following these concrete steps and documenting the factual basis for scope and measurement outcomes with reference to the controlling paragraphs (2.3A; B2.7-B2.8; 2.4-2.5; 6.10.1-6.10.2; 30A-30C; 7.2.51-7.2.53; 44OO-44PP), an entity can align processes and controls to satisfy the Standard’s requirements.
Part Standards amended by AASB 2025-1Standards amended by AASB 2025-1
This Standard makes amendments to AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014).
These amendments arise from the issuance of International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) by the International Accounting Standards Board in December 2024.
Main features of this Standard
Main requirements
Nature-dependent electricity contracts help entities to secure their electricity supply from sources such as wind and solar power. The amount of electricity generated under these contracts can vary based on uncontrollable factors such as weather conditions.
This Standard amends AASB 7 and AASB 9 to allow entities to better reflect these contracts in the financial statements. The amendments:
clarify the application of the ‘own-use’ criteria to nature-dependent electricity contracts;
permit hedge accounting if these contracts are used as hedging instruments; and
add new disclosure requirements to enable users of financial statements to better understand the effect of these contracts on an entity’s financial performance and cash flows.
Application date
This Standard applies to annual periods beginning on or after 1 January 2026. Earlier application is permitted.
Standards amended by AASB 2025-1 Standards amended by AASB 2025-1
Standards amended by AASB 2025-1
This Standard makes amendments to AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014).
These amendments arise from the issuance of International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) by the International Accounting Standards Board in December 2024.
Main features of this Standard Main features of this Standard
Main features of this Standard
Main requirements
Nature-dependent electricity contracts help entities to secure their electricity supply from sources such as wind and solar power. The amount of electricity generated under these contracts can vary based on uncontrollable factors such as weather conditions.
This Standard amends AASB 7 and AASB 9 to allow entities to better reflect these contracts in the financial statements. The amendments:
clarify the application of the ‘own-use’ criteria to nature-dependent electricity contracts;
permit hedge accounting if these contracts are used as hedging instruments; and
add new disclosure requirements to enable users of financial statements to better understand the effect of these contracts on an entity’s financial performance and cash flows.
Application date
This Standard applies to annual periods beginning on or after 1 January 2026. Earlier application is permitted.
Accounting Standard AASB 2025-1 Accounting Standard AASB 2025-1
Accounting Standard AASB 2025-1
The Australian Accounting Standards Board makes Accounting Standard AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity under section 334 of the Corporations Act 2001.
Keith Kendall
Dated 3 February 2025 Chair – AASB
Accounting Standard AASB 2025-1 Accounting Standard AASB 2025-1
Accounting Standard AASB 2025-1
Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity
Objective Objective
Objective
This Standard amends AASB 7 Financial Instruments: Disclosures (August 2015) and AASB 9 Financial Instruments (December 2014) as a consequence of the issuance of International Financial Reporting Standard Contracts Referencing Nature-dependent Electricity (Amendments to IFRS 9 and IFRS 7) by the International Accounting Standards Board in December 2024.
Application Application
Application
The amendments set out in this Standard apply to entities and financial statements in accordance with the application of AASB 7 and AASB 9 set out in AASB 1057 Application of Australian Accounting Standards.
This Standard applies to annual reporting periods beginning on or after 1 January 2026. Earlier application is permitted.
This Standard uses underlining, striking out and other typographical material to identify some of the amendments to AASB 7 and AASB 9 in order to make the amendments more understandable. However, the amendments made by this Standard do not include that underlining, striking out or other typographical material. Ellipses (…) are used to help provide the context within which amendments are made and also to indicate text that is not amended.
Amendments to AASB 7 Amendments to AASB 7
Amendments to AASB 7
Paragraphs 5B–5D, 30A–30C, 44OO–44PP and the subheading before paragraph 30A are added. Paragraph 5 is not amended but is included for ease of reference. New text is underlined.
Scope
...
5 This Standard applies to contracts to buy or sell a non-financial item that are within the scope of AASB 9.
...
5B Paragraph 30A applies only to contracts to buy nature-dependent electricity that satisfy the requirements in paragraph 2.3A of AASB 9 and are outside the scope of that Standard in accordance with paragraphs B2.7–B2.8 of AASB 9.
5C Paragraph 30B applies only to contracts that satisfy the requirements in paragraph 2.3A of AASB 9 and have been designated in a cash flow hedging relationship in accordance with paragraph 6.10.1 of AASB 9.
5D Paragraph 30C applies only to contracts that satisfy the requirements in paragraph 2.3A of AASB 9 and have been entered into with regards to an entity’s electricity purchases. These contracts comprise those:
(a) within the scope of AASB 9; and
(b) outside the scope of AASB 9 in accordance with paragraph 2.4 of that Standard, including those excluded in accordance with paragraphs B2.7–B2.8 of that Standard.
...
Significance of financial instruments for financial position and performance
30A An entity shall disclose in a single note in its financial statements information about contracts that meet the criteria set out in paragraph 5B. In particular, the entity shall disclose information that enables users of its financial statements to understand the effects these contracts have on the amount, timing and uncertainty of its future cash flows and on its financial performance. To meet these objectives, an entity shall disclose:
(a) information about contractual features that expose the entity to:
(i) variability in the underlying amount of electricity (see paragraph 2.3A of AASB 9); and
(ii) the risk that the entity would be required to buy electricity during a delivery interval in which the entity cannot use the electricity (see paragraph B2.7 of AASB 9).
(b) information about unrecognised commitments arising from such contracts as at the reporting date, including:
(i) the estimated future cash flows from buying electricity under these contracts. The entity shall apply its judgement when identifying the appropriate time bands within which to disclose the estimated future cash flows.
(ii) qualitative information about how the entity assesses whether a contract might become onerous (see AASB 137 Provisions, Contingent Liabilities and Contingent Assets), including the assumptions the entity uses in making this assessment.
(c) qualitative and quantitative information about effects on the entity’s financial performance for the reporting period. The disclosure is based on the information that is applicable to the reporting period that the entity used to assess whether it has been a net purchaser of electricity (see paragraph B2.8 of AASB 9). An entity shall disclose information for the reporting period about:
(i) the costs arising from purchases of electricity made under the contracts, disclosing separately how much of the purchased electricity was unused at the time of delivery;
(ii) the proceeds arising from sales of unused electricity; and
(iii) the costs arising from purchases of electricity made to offset sales of unused electricity.
30B An entity shall disaggregate, for its contracts that meet the criteria set out in paragraph 5C, the information the entity discloses, by risk category, about the terms and conditions of hedging instruments in accordance with paragraph 23A.
30C If an entity discloses information about other contracts referencing nature-dependent electricity as described in paragraph 5D (including those contracts described in paragraph 30B) in other notes in its financial statements, the entity shall include cross-references to those notes in the single note required by paragraph 30A.
...
Effective date and transition
...
44OO AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity, issued in February 2025, which also amended AASB 9, added paragraphs 5B–5D, 30A–30C and 44PP. An entity shall apply these paragraphs when it applies the amendments to AASB 9. If an entity does not restate comparative information when it first applies the amendments to AASB 9 in accordance with paragraph 7.2.51 of that Standard, the entity shall not provide comparative information for the disclosures required by paragraphs 30A–30C.
44PP In the reporting period in which an entity first applies AASB 2025-1 Amendments to Australian Accounting Standards – Contracts Referencing Nature-dependent Electricity, the entity need not disclose the quantitative information that would otherwise be required by paragraph 28(f) of AASB 108.
Amendments to AASB 9 Amendments to AASB 9
Amendments to AASB 9
Paragraphs 2.3A–2.3B, 2.8, 6.10.1–6.10.2, 7.1.15, 7.2.51–7.2.53, B2.7–B2.8 and their subheadings are added. A subheading is also added before paragraph 2.4. Paragraph 2.6 is amended. New text is underlined. Paragraphs 2.4 and 2.5 are not amended but are included for ease of reference.
Chapter 2 Scope
...
2.3A Paragraphs 6.10.1–6.10.2 and B2.7–B2.8 apply only to contracts referencing nature-dependent electricity. Contracts referencing nature-dependent electricity are contracts that expose an entity to variability in the underlying amount of electricity because the source of electricity generation depends on uncontrollable natural conditions (for example, the weather). Contracts referencing nature-dependent electricity include both contracts to buy or sell nature-dependent electricity and financial instruments that reference such electricity.
2.3B An entity shall not apply paragraphs 6.10.1–6.10.2 and B2.7–B2.8 by analogy to other contracts, items or transactions.
Contracts to buy or sell non‑financial items
2.4 This Standard shall be applied to those contracts to buy or sell a non‑financial item that can be settled net in cash or another financial instrument, or by exchanging financial instruments, as if the contracts were financial instruments, with the exception of contracts that were entered into and continue to be held for the purpose of the receipt or delivery of a non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements. However, this Standard shall be applied to those contracts that an entity designates as measured at fair value through profit or loss in accordance with paragraph 2.5.
2.5 A contract to buy or sell a non‑financial item that can be settled net in cash or another financial instrument, or by exchanging financial instruments, as if the contract was a financial instrument, may be irrevocably designated as measured at fair value through profit or loss even if it was entered into for the purpose of the receipt or delivery of a non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements. This designation is available only at inception of the contract and only if it eliminates or significantly reduces a recognition inconsistency (sometimes referred to as an ‘accounting mismatch’) that would otherwise arise from not recognising that contract because it is excluded from the scope of this Standard (see paragraph 2.4).
2.6 There are various ways in which a contract to buy or sell a non-financial item can be settled net in cash or another financial instrument or by exchanging financial instruments. These include:
...
A contract to which (b) or (c) applies is not entered into for the purpose of the receipt or delivery of the non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements and, accordingly, is within the scope of this Standard. Other contracts (which include contracts as described in paragraph 2.3A) to which paragraph 2.4 applies are evaluated to determine whether they were entered into and continue to be held for the purpose of the receipt or delivery of the non‑financial item in accordance with the entity’s expected purchase, sale or usage requirements and, accordingly, whether they are within the scope of this Standard.
...
2.8 An entity shall also apply paragraphs B2.7–B2.8 to assess whether contracts referencing nature-dependent electricity (as described in paragraph 2.3A) are entered into and continue to be held for the purpose of the