Fair Value Hedge Accounting for a Portfolio Hedge of Interest Rate Risk
AG114 For a fair value hedge of interest rate risk associated with a portfolio of financial assets or financial liabilities, an entity would meet the requirements of this Standard if it complies with the procedures set out in (a)-(i) and paragraphs AG115-AG132 below.
(a) As part of its risk management process the entity identifies a portfolio of items whose interest rate risk it wishes to hedge. The portfolio may comprise only assets, only liabilities or both assets and liabilities. The entity may identify two or more portfolios, in which case it applies the guidance below to each portfolio separately.
(b) The entity analyses the portfolio into repricing time periods based on expected, rather than contractual, repricing dates. The analysis into repricing time periods may be performed in various ways including scheduling cash flows into the periods in which they are expected to occur, or scheduling notional principal amounts into all periods until repricing is expected to occur.
(c) On the basis of this analysis, the entity decides the amount it wishes to hedge. The entity designates as the hedged item an amount of assets or liabilities (but not a net amount) from the identified portfolio equal to the amount it wishes to designate as being hedged. This amount also determines the percentage measure that is used for testing effectiveness in accordance with paragraph AG126(b).
(d) The entity designates the interest rate risk it is hedging. This risk could be a portion of the interest rate risk in each of the items in the hedged position, such as a benchmark interest rate (e.g. LIBOR).
(e) The entity designates one or more hedging instruments for each repricing time period.
(f) Using the designations made in (c)-(e) above, the entity assesses at inception and in subsequent periods, whether the hedge is expected to be highly effective during the period for which the hedge is designated.
(g) Periodically, the entity measures the change in the fair value of the hedged item (as designated in (c)) that is attributable to the hedged risk (as designated in (d)), on the basis of the expected repricing dates determined in (b). Provided that the hedge is determined actually to have been highly effective when assessed using the entity’s documented method of assessing effectiveness, the entity recognises the change in fair value of the hedged item as a gain or loss in profit or loss and in one of two line items in the statement of financial position as described in paragraph 89A. The change in fair value need not be allocated to individual assets or liabilities.
(h) The entity measures the change in fair value of the hedging instrument(s) (as designated in (e)) and recognises it as a gain or loss in profit or loss. The fair value of the hedging instrument(s) is recognised as an asset or liability in the statement of financial position.
Division Fair Value Hedge Accounting for a Portfo - AASB 139 - Financial Instruments: Recognition and Measurement - July 2004 - Fair Value Hedge Accounting for a Portfolio Hedge of Interest Rate Risk | Zoe
(i) Any ineffectiveness[1] will be recognised in profit or loss as the difference between the change in fair value referred to in (g) and that referred to in (h).
AG115 This approach is described in more detail below. The approach shall be applied only to a fair value hedge of the interest rate risk associated with a portfolio of financial assets or financial liabilities.
AG116 The portfolio identified in paragraph AG114(a) could contain assets and liabilities. Alternatively, it could be a portfolio containing only assets, or only liabilities. The portfolio is used to determine the amount of the assets or liabilities the entity wishes to hedge. However, the portfolio is not itself designated as the hedged item.
AG117 In applying paragraph AG114(b), the entity determines the expected repricing date of an item as the earlier of the dates when that item is expected to mature or to reprice to market rates. The expected repricing dates are estimated at the inception of the hedge and throughout the term of the hedge, based on historical experience and other available information, including information and expectations regarding prepayment rates, interest rates and the interaction between them. Entities that have no entity-specific experience or insufficient experience use peer group experience for comparable financial instruments. These estimates are reviewed periodically and updated in the light of experience. In the case of a fixed rate item that is prepayable, the expected repricing date is the date on which the item is expected to prepay unless it reprices to market rates on an earlier date. For a group of similar items, the analysis into time periods based on expected repricing dates may take the form of allocating a percentage of the group, rather than individual items, to each time period. An entity may apply other methodologies for such allocation purposes. For example, it may use a prepayment rate multiplier for allocating amortising loans to time periods based on expected repricing dates. However, the methodology for such an allocation shall be in accordance with the entity’s risk management procedures and objectives.
AG118 As an example of the designation set out in paragraph AG114(c), if in a particular repricing time period an entity estimates that it has fixed rate assets of CU100 and fixed rate liabilities of CU80 and decides to hedge all of the net position of CU20, it designates as the hedged item assets in the amount of CU20 (a portion of the assets). The designation is expressed as an ‘amount of a currency’ (e.g. an amount of dollars, euro, pounds or rand) rather than as individual assets. It follows that all of the assets (or liabilities) from which the hedged amount is drawn – that is all of the CU100 of assets in the above example – must be:
(a) items whose fair value changes in response to changes in the interest rate being hedged; and
(b) items that could have qualified for fair value hedge accounting if they had been designated as hedged individually. In particular, because AASB 9 specifies that the fair value of a financial liability with a demand feature (such as demand deposits and some types of time deposits) is not less than the amount payable on demand, discounted from the first date that the amount could be required to be paid, such an item cannot qualify for fair value hedge accounting for any time period beyond the shortest period in which the holder can demand payment. In the above example, the hedged position is an amount of assets. Hence, such liabilities are not a part of the designated hedged item, but are used by the entity to determine the amount of the asset that is designated as being hedged. If the position the entity wished to hedge was an amount of liabilities, the amount representing the designated hedged item must be drawn from fixed rate liabilities other than liabilities that the entity can be required to repay in an earlier time period, and the percentage measure used for assessing hedge effectiveness in accordance with paragraph AG126(b) would be calculated as a percentage of these other liabilities. For example, assume that an entity estimates that in a particular repricing time period it has fixed rate liabilities of CU100, comprising CU40 of demand deposits and CU60 of liabilities with no demand feature, and CU70 of fixed rate assets. If the entity decides to hedge all of the net position of CU30, it designates as the hedged item liabilities of CU30 or 50 per cent[2] of the liabilities with no demand feature.
AG119 The entity also complies with the other designation and documentation requirements set out in paragraph 88(a). For a portfolio hedge of interest rate risk, this designation and documentation specifies the entity’s policy for all of the variables that are used to identify the amount that is hedged and how effectiveness is measured, including the following:
(a) which assets and liabilities are to be included in the portfolio hedge and the basis to be used for removing them from the portfolio;
(b) how the entity estimates repricing dates, including what interest rate assumptions underlie estimates of prepayment rates and the basis for changing those estimates. The same method is used for both the initial estimates made at the time an asset or liability is included in the hedged portfolio and for any later revisions to those estimates;
(c) the number and duration of repricing time periods;
(d) how often the entity will test effectiveness and which of the two methods in paragraph AG126 it will use;
(e) the methodology used by the entity to determine the amount of assets or liabilities that are designated as the hedged item and, accordingly, the percentage measure used when the entity tests effectiveness using the method described in paragraph AG126(b); and
(f) when the entity tests effectiveness using the method described in paragraph AG126(b), whether the entity will test effectiveness for each repricing time period individually, for all time periods in aggregate, or by using some combination of the two.
The policies specified in designating and documenting the hedging relationship shall be in accordance with the entity’s risk management procedures and objectives. Changes in policies shall not be made arbitrarily. They shall be justified on the basis of changes in market conditions and other factors and be founded on and consistent with the entity’s risk management procedures and objectives.
AG120 The hedging instrument referred to in paragraph AG114(e) may be a single derivative or a portfolio of derivatives all of which contain exposure to the hedged interest rate risk designated in paragraph AG114(d) (e.g. a portfolio of interest rate swaps all of which contain exposure to LIBOR). Such a portfolio of derivatives may contain offsetting risk positions. However, it may not include written options or net written options, because the Standard[3] does not permit such options to be designated as hedging instruments (except when a written option is designated as an offset to a purchased option). If the hedging instrument hedges the amount designated in paragraph AG114(c) for more than one repricing time period, it is allocated to all of the time periods that it hedges. However, the whole of the hedging instrument must be allocated to those repricing time periods because the Standard[4] does not permit a hedging relationship to be designated for only a portion of the time period during which a hedging instrument remains outstanding.
AG121 When the entity measures the change in the fair value of a prepayable item in accordance with paragraph AG114(g), a change in interest rates affects the fair value of the prepayable item in two ways: it affects the fair value of the contractual cash flows and the fair value of the prepayment option that is contained in a prepayable item. Paragraph 81 of the Standard permits an entity to designate a portion of a financial asset or financial liability, sharing a common risk exposure, as the hedged item, provided effectiveness can be measured. For prepayable items, paragraph 81A permits this to be achieved by designating the hedged item in terms of the change in the fair value that is attributable to changes in the designated interest rate on the basis of expected, rather than contractual, repricing dates. However, the effect that changes in the hedged interest rate have on those expected repricing dates shall be included when determining the change in the fair value of the hedged item. Consequently, if the expected repricing dates are revised (e.g. to reflect a change in expected prepayments), or if actual repricing dates differ from those expected, ineffectiveness will arise as described in paragraph AG126. Conversely, changes in expected repricing dates that (a) clearly arise from factors other than changes in the hedged interest rate, (b) are uncorrelated with changes in the hedged interest rate and (c) can be reliably separated from changes that are attributable to the hedged interest rate (e.g. changes in prepayment rates clearly arising from a change in demographic factors or tax regulations rather than changes in interest rate) are excluded when determining the change in the fair value of the hedged item, because they are not attributable to the hedged risk. If there is uncertainty about the factor that gave rise to the change in expected repricing dates or the entity is not able to separate reliably the changes that arise from the hedged interest rate from those that arise from other factors, the change is assumed to arise from changes in the hedged interest rate.
AG122 The Standard does not specify the techniques used to determine the amount referred to in paragraph AG114(g), namely the change in the fair value of the hedged item that is attributable to the hedged risk. If statistical or other estimation techniques are used for such measurement, management must expect the result to approximate closely that which would have been obtained from measurement of all the individual assets or liabilities that constitute the hedged item. It is not appropriate to assume that changes in the fair value of the hedged item equal changes in the value of the hedging instrument.
AG123 Paragraph 89A requires that if the hedged item for a particular repricing time period is an asset, the change in its value is presented in a separate line item within assets. Conversely, if the hedged item for a particular repricing time period is a liability, the change in its value is presented in a separate line item within liabilities. These are the separate line items referred to in paragraph AG114(g). Specific allocation to individual assets (or liabilities) is not required.
AG124 Paragraph AG114(i) notes that ineffectiveness arises to the extent that the change in the fair value of the hedged item that is attributable to the hedged risk differs from the change in the fair value of the hedging derivative. Such a difference may arise for a number of reasons, including:
(a) actual repricing dates being different from those expected, or expected repricing dates being revised;
(b) items in the hedged portfolio becoming impaired or being derecognised;
(c) the payment dates of the hedging instrument and the hedged item being different; and
(d) other causes (e.g. when a few of the hedged items bear interest at a rate below the benchmark rate for which they are designated as being hedged, and the resulting ineffectiveness is not so great that the portfolio as a whole fails to qualify for hedge accounting).
Such ineffectiveness[5] shall be identified and recognised in profit or loss.
AG125 Generally, the effectiveness of the hedge will be improved:
(a) if the entity schedules items with different prepayment characteristics in a way that takes account of the differences in prepayment behaviour;
(b) when the number of items in the portfolio is larger. When only a few items are contained in the portfolio, relatively high ineffectiveness is likely if one of the items prepays earlier or later than expected. Conversely, when the portfolio contains many items, the prepayment behaviour can be predicted more accurately;
(c) when the repricing time periods used are narrower (e.g. 1‑month as opposed to 3-month repricing time periods). Narrower repricing time periods reduce the effect of any mismatch between the repricing and payment dates (within the repricing time period) of the hedged item and those of the hedging instrument; and
(d) the greater the frequency with which the amount of the hedging instrument is adjusted to reflect changes in the hedged item (e.g. because of changes in prepayment expectations).
AG126 An entity tests effectiveness periodically. If estimates of repricing dates change between one date on which an entity assesses effectiveness and the next, it shall calculate the amount of effectiveness either:
(a) as the difference between the change in the fair value of the hedging instrument (see paragraph AG114(h)) and the change in the value of the entire hedged item that is attributable to changes in the hedged interest rate (including the effect that changes in the hedged interest rate have on the fair value of any embedded prepayment option); or
(b) using the following approximation. The entity:
(i) calculates the percentage of the assets (or liabilities) in each repricing time period that was hedged, on the basis of the estimated repricing dates at the last date it tested effectiveness;
(ii) applies this percentage to its revised estimate of the amount in that repricing time period to calculate the amount of the hedged item based on its revised estimate;
(iii) calculates the change in the fair value of its revised estimate of the hedged item that is attributable to the hedged risk and presents it as set out in paragraph AG114(g);
(iv) recognises ineffectiveness equal to the difference between the amount determined in (iii) and the change in the fair value of the hedging instrument (see paragraph AG114(h)).
AG127 When measuring effectiveness, the entity distinguishes revisions to the estimated repricing dates of existing assets (or liabilities) from the origination of new assets (or liabilities), with only the former giving rise to ineffectiveness. All revisions to estimated repricing dates (other than those excluded in accordance with paragraph AG121), including any reallocation of existing items between time periods, are included when revising the estimated amount in a time period in accordance with paragraph AG126(b)(ii) and hence when measuring effectiveness. Once ineffectiveness has been recognised as set out above, the entity establishes a new estimate of the total assets (or liabilities) in each repricing time period, including new assets (or liabilities) that have been originated since it last tested effectiveness, and designates a new amount as the hedged item and a new percentage as the hedged percentage. The procedures set out in paragraph AG126(b) are then repeated at the next date it tests effectiveness.
AG128 Items that were originally scheduled into a repricing time period may be derecognised because of earlier than expected prepayment or writeoffs caused by impairment or sale. When this occurs, the amount of change in fair value included in the separate line item referred to in paragraph AG114(g) that relates to the derecognised item shall be removed from the statement of financial position, and included in the gain or loss that arises on derecognition of the item. For this purpose, it is necessary to know the repricing time period(s) into which the derecognised item was scheduled, because this determines the repricing time period(s) from which to remove it and hence the amount to remove from the separate line item referred to in paragraph AG114(g). When an item is derecognised, if it can be determined in which time period it was included, it is removed from that time period. If not, it is removed from the earliest time period if the derecognition resulted from higher than expected prepayments, or allocated to all time periods containing the derecognised item on a systematic and rational basis if the item was sold or became impaired.
AG129 In addition, any amount relating to a particular time period that has not been derecognised when the time period expires is recognised in profit or loss at that time (see paragraph 89A). For example, assume an entity schedules items into three repricing time periods. At the previous redesignation, the change in fair value reported in the single line item in the statement of financial position was an asset of CU25. That amount represents amounts attributable to periods 1, 2 and 3 of CU7, CU8 and CU10, respectively. At the next redesignation, the assets attributable to period 1 have been either realised or rescheduled into other periods. Therefore, CU7 is derecognised from the statement of financial position and recognised in profit or loss. CU8 and CU10 are now attributable to periods 1 and 2, respectively. These remaining periods are then adjusted, as necessary, for changes in fair value as described in paragraph AG114(g).
AG130 As an illustration of the requirements of the previous two paragraphs, assume that an entity scheduled assets by allocating a percentage of the portfolio into each repricing time period. Assume also that it scheduled CU100 into each of the first two time periods. When the first repricing time period expires, CU110 of assets are derecognised because of expected and unexpected repayments. In this case, all of the amount contained in the separate line item referred to in paragraph AG114(g) that relates to the first time period is removed from the statement of financial position, plus 10 per cent of the amount that relates to the second time period.
AG131 If the hedged amount for a repricing time period is reduced without the related assets (or liabilities) being derecognised, the amount included in the separate line item referred to in paragraph AG114(g) that relates to the reduction shall be amortised in accordance with paragraph 92.
AG132 An entity may wish to apply the approach set out in paragraphs AG114-AG131 to a portfolio hedge that had previously been accounted for as a cash flow hedge in accordance with AASB 139. Such an entity would revoke the previous designation of a cash flow hedge in accordance with paragraph 101(d), and apply the requirements set out in that paragraph. It would also redesignate the hedge as a fair value hedge and apply the approach set out in paragraphs AG114-AG131 prospectively to subsequent reporting periods.