[2018] VCAT 750
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2018-05-21
Original judgment source is linked above.
All of the above must be to the satisfaction of the Responsible Authority. Once approved these plans and documents become the endorsed plans of the permit.
All of the above must be to the satisfaction of the Responsible Authority.
Once approved these plans become the endorsed plans of this permit.
All of the above must be to the satisfaction of the Responsible Authority.
Once approved these plans become the endorsed plans of this permit.
The requirements and outcomes of the SMP must be demonstrated on the plans and elevations submitted for endorsement.
Once submitted to and approved by the Responsible Authority, the SMP will form part of the documents endorsed as part of this permit.
The requirements of the SMP must be implemented by the building manager, owners and occupiers of the site for the duration of the building's operation in accordance with this permit, to the satisfaction of the Responsible Authority.
All external lights must be of a limited intensity and must ensure no unreasonable nuisance is caused to surrounding road network, adjoining properties or nearby residents.
This lighting must be maintained and operated for the life of the building to the satisfaction of the Responsible Authority.
Car Parking and Traffic
This plan is to be to the satisfaction of the Responsible Authority and must include, but is not limited to, the following:
(a) Provision of a minimum of 187 car parking spaces.
(b) Allocation of spaces generally in accordance with the Traffic Impact Assessment by Traffix Group dated November 2016.
(c) Allocation of all parking spaces (except short term, visitor and accessible spaces) to individual dwellings and tenancies and commercial uses. Each space within any tandem parking bays must be allocated to the same unit/ commercial tenancy.
(d) Details of accessible (disabled) or motorcycle parking spaces to be nominated within the basement car parking areas.
(e) Details of the signing and line marking of parking spaces.
(f) Details of how access to the proposed parking spaces will be secured for residential and visitor use.
(g) Detail any access controls to the parking area, such as boom gates which shall take into account the required queue length required as per section 3.4 of AS2890.1.
(h) Pedestrian access and movement within the car parking areas, including strategies to minimize the potential for conflict between pedestrians and vehicles. This may include line marking such as hatched shared areas, directional signs and/or physical barriers.
(i) Allocation of bicycle spaces to tenancies and visitors.
(j) Provision of some of the bicycle parking hoops in front of the entrances to the retail areas, and gymnasium.
(k) Locations and details of bicycle parking signs in accordance with Clause 52.34-5.
(l) Line marking of car parking spaces.
(m) Details of how access to car spaces, accessible (disabled) car spaces and bicycle spaces will be achieved by visitors (i.e. an intercom) and how parking will be secured.
(n) Signage for car and bicycle parking spaces.
(o) Details of the car share scheme.
(p) Details of how access to the waste collection area will be achieved by waste collection vehicles (i.e. an intercom) and how these will be secured.
(q) How the car park will be managed to ensure that all vehicles exit the site in a forwards direction.
(r) Details of signage or alternative measures to ensure that waste vehicles exit the site in a forwards direction.
(s) STOP/ GIVE WAY Controls are to be provided at cross intersections within the car park, particularly at intersections with ramps where there is no control.
(t) Centre lines to be provided along curved sections of the access ramp to guide motorists and keep vehicles to the left of the ramp.
Once submitted to and approved by the Responsible Authority the Parking Management Plan will form part of the documents endorsed as part of this permit.
Once submitted to and approved by the Responsible Authority, the Green Travel Plan will form part of the documents endorsed as part of this permit.
The requirements of this plan must be implemented by the building manager, owners and occupiers of the site for the duration of the building's operation in accordance with this permit, to the satisfaction of the Responsible Authority.
Waste Management Plan
The requirements and outcomes of the Waste Management Plan must be demonstrated on the plans and elevations submitted for endorsement.
Once submitted to and approved by the Responsible Authority, the Waste Management Plan will form part of the documents endorsed as part of this permit.
The requirements of the Waste Management Plan must be implemented by the building manager, owners and occupiers of the site for the duration of the building's operation in accordance with this permit, to the satisfaction of the Responsible Authority.
Construction Management Plan
The Construction Management Plan must be prepared and managed by a suitably qualified person who is experienced in preparing Construction Management Plans.
This plan is to be to the satisfaction of the Responsible Authority and must be prepared in accordance with the City of Whitehorse Construction Management Plan Guidelines.
The CMP must address; any demolition, bulk excavation, management of the construction site, land disturbance, hours of construction, noise, control of dust, public safety, traffic management, construction vehicle road routes, soiling and cleaning of roadways, discharge of any polluted water, security fencing, disposal of site waste and any potentially contaminated materials, location of site offices, redirection of any above or underground services, and site security lighting.
The CMP must include suitable washing facilities are to be provided and utilized on site for the cleaning of all construction vehicles prior to them exiting the designated property so as to prevent any grease, oil, mud, clay or other substances to fall or run off a vehicle onto a road, or into any drain under the road.
Once submitted to and approved by the Responsible Authority the Construction Management Plan will form part of the documents endorsed as part of this planning permit.
When approved the Construction Management Plan will form part of this permit and must be complied with, to the satisfaction of the Responsible Authority, to the extent that this is in the control of the owner of the land. The owner of the land is to be responsible for all costs associated with the works to be undertaken in accordance with the requirements of the Construction Management Plan.
Alterations/ Reinstatement of Assets
To the satisfaction of the Responsible Authority.
Unless with the further written consent of the Responsible Authority.
Glazing
The Responsible Authority may extend the periods referred to if a request is made in writing in accordance with Section 69 of the Planning and Environment Act 1987.
Schedule of Decision Plans (as advertised) 34-36 Prospect Street, Box Hill VCAT Ref No P2830/2017
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
ZL Prospect Pty Ltd
Whitehorse CC [2018] VCAT 750