[2009] VCAT 504
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2009-03-26
Original judgment source is linked above.
(1) At any time, the Tribunal may make an order summarily dismissing or striking out all, or any part, of a proceeding that, in its opinion -
(a) is frivolous, vexatious, misconceived or lacking in substance; or
Pursuant to a building contract dated 6 Junem2007, the respondent was engaged by Mr Darren Zerna and Mrs Catherine Zerna to build a new house on their land situated at 9 Outhwaite Avenue, Doncaster (the property).
Pursuant to that contract, the Zernas were required to demolish the existing building and provide a clear site to the respondent to enable the commencement of the construction of the new house.
Brechlen Pty Ltd was authorised to carry out the demolition in accordance with building permit (No 12470/20702553/0) issued for that purpose on 21 June 2007 (the demolition permit)
Following completion of that demolition, Mr Paul Gibcus (building surveyor) issued a certificate of final inspection in respect of the demolition work authorised under the demolition permit.
Prior to the construction of the new house, a tree root barrier was required to be installed in accordance with plans prepared by VHC Engineers (dated 6 July 2007) and, subsequently, approved under the building permit (No 10.3/200700499/0) issued on 22 August 2007 (the building permit).
The respondent engaged Citywide Service Solutions Pty Ltd to construct the tree root barrier in accordance wit the approved plans and the building permit.
That work, which was carried out on or about 2 November 2007, involved the digging of a trench, the insertion of a plastic barrier vertically into the trench and the filling of the trench with concrete slurry to protect and hold the barrier in place.
At the time it engaged Citywide to carry out construction of the root barrier, the respondent had no knowledge that the demolition work had not been carried out such that the then existing sewer connection to the building which had been demolished had not been terminated correctly at the inspection point at the rear of the property.
Accordingly, during the construction of the tree root barrier the improperly terminated sewerage pipe was broken and concrete slurry entered the sewerage system and caused a blockage which resulted in the damage the subject of this proceeding.
No employee of the respondent was involved in carrying out the work required to install the tree root barrier. Mr Kristian Ratten (the respondent's site supervisor) had been at the property, prior to the commencement of work by City wide, and had instructed City wide personnel to construct the tree root barrier in accordance wit the approved plan.
Citywide is not, and was not at all relevant times, the servant or agent of the respondent.
The Respondent had no notice of any difficulties encountered during the tree root barrier construction or of any blockage of the sewerage system until 7 November 2007 when Mr Ratten attended at the property and observed Yarra Valley Water personnel in attendance, carrying out repairs to rectify the blockage caused by the entry of concrete slurry.
(d) constructs, maintains or operates any unauthorised works -
and by that act causes injury to any other person or damage to the property (whether real or personal) of any other person or causes any other person to suffer economic loss is liable to pay damages to that other person in respect of that injury or damage
(a) a person interferes with a reasonable flow of water onto any land or by negligent conduct interferes with a flow of water onto any land which is not reasonable; and
(b) as a result of that interference water causes -
(ii) damage to the property (whether real or personal) of any other person; or
the person who interfered with the flow is liable to pay damages to that other person in respect of that injury, damage or loss.
(3) If the person who caused, or interfered with, the flow (as the case requires) -
(a) is the servant of another person and acted in the course of the servant's employment; or
(b) is the agent of another person and acted within the scope of the agent's authority -
that other person is liable to pay damages in respect of the injury, damage or loss.
fulfil its role as builder by supervising the entire construction of the root barrier including the positioning thereof. Secondly, it is further submitted that it is also responsible for acts of its agents whereby it had control over the entity in the control of that party in how it carries out its functions. (The agent referred to therein is Citywide).
That the respondent has been negligent in its role as supervisor, by not taking part in the planning, preparation and carrying out of the construction of the root barrier, and not being onsite when the concrete was poured. The question must be posed, if the supervisor was onsite either during the excavation, or pouring process, he should have picked up the broken earthenware pipe, or the fact that an extra three cubic metres of concrete had disappeared during the pour, and prevented the works from proceeding, thus minimising or preventing the damage.
The respondent may also be held liable for the negligent actions of its agent, being the company that constructed the tree root barrier. The basis for this proposition is the principles of agency, and the control test detailed thereunder. See Barlow v South East Water Ltd ibid at para 31.
The respondent did have the responsibility control the actions of Citywide Services by instructing them not to vary the plans for the root barrier, but did nothing to ensure that those plans were followed by staying onsite to supervise. Further, Mr Ratten's affidavit does not even give an opinion on whether Citywide did follow the plans, but rather is silent on this issue.
The definition of interference with reasonable flow, or not reasonable which the Act provides guidelines for in section 20. However, here it is submitted that the flow of water, or any other material for that fact was completely stopped by the concrete slurry, and that therefore it is submitted that the threshold question in s 16(2) is whether or not it is the complete lack of flow of water that can cause the damage as anticipated by that section.
As the Act refers to interferes with a reasonable flow of water onto any land, or by negligent conduct, etc that it is reasonable to submit that the complete obstruction of flow by the pouring of concrete into the sewer connection at number 9, and then into the main sewer.
Citywide wanted to vary the location of the tree root barrier. I insisted that they follow the VHC plan. I instructed Citywide to construct the tree root barrier in accordance with the VHC plan.
I left the site approximately half an hour after I arrived, that is about 10.00 am.
I did not participate in the construction of the tree root barrier.
The next time I attended the property was the Wednesday after the Melbourne Cup weekend, that is, 7 November 2007. I usually attend all the sites I supervise each day.
Professor Fleming (the Law of Torts 9th Edition 1998) explains the issue in this way.
"As a general rule, the employment of an independent contractor does not entail responsibility for wrongs committed by him, or his employees, in the course of work for which he was engaged. This important qualification of vicarious liability, established in the early 19th Century, is most commonly explained on the ground that, as the employer lacks detailed control over the manner in which the work is done, it is the contractor who himself who is best able to prevent the risks incidental to it and absorb such losses as occur. While there may sometimes be far greater spot control over the details of work of a contractor as compared with a servant, it is nonetheless felt that, in the stock situations where work is turned over to another who is in that line of business, like a taxi driver, painter or builder, the risk of accident is incidental to the contractor's enterprise rather than his employers."
Accordingly, assuming for the sake of the argument that Mr Newton's use of the jet machine caused the flood of sewage in Mrs Barlow's house, since the doctrine of vicarious liability does not attribute Mr Newton's actions to South East Water Limited, how can it be said that the flow of water was caused by or was a concomitant of the exercise of a function by South East Water Limited? Doubtless if an employee of South East Water Limited had been operating the jet machine any vicarious liability that South East Water Limited may have for his actions would not extend to liability under Section 16 of the Water Act because of the operation of Section 16(2) of the Water Act. Since the work here is done by an independent contractor Section 17(2) has no application. Thiess is neither an authority nor a licensee. Thiess' actions or those of its employees are not attributed to South East Water Limited by the doctrine of vicarious liability.
The same reasoning applied in the manner in which Mr Scott primarily made the submission would lead to the view that even if it could be shown that Mr Newton's use of the jet machine was the cause of the flood of sewage, South East Water Limited is not responsible or liable for the consequences of Mr Newton's action.
It is appropriate I think to consider first what the situation is in the ordinary Common Law of Tort in circumstances where one person engages a contractor to carry out work for him and for his benefit. In Colonial Mutual Life Assurance Society Limited v Producers and Citizens Co-operative Assurance Co of Australia Limited (1931) 16 CLR 41, 48 Sir Owen Dixon said:
"In most cases in which a tort is committed in the course of the performance of work for the benefit of another person, he cannot be vicariously responsible if the actual tortfeasor is not his servant and he has not directly authorized the doing of the act which amounts to a tort. The work, although done at his request and for his benefit, is considered as the independent function of the person who undertakes it, and not as something which the person obtaining the benefit does by his representatives standing in his place and, therefore, identified with him for the purpose of liability arising in the course of its performance. The independent contractor carries out his work, not as a representative but as a principal."
If that is correct and applies under the Water Act then ACI even if it had engaged Qanstruct would not be liable for what Qanstruct did or was alleged to have done.
At Common Law therefore, even if Qanstruct had been contracted by ACI to do work and it turns out now that that is not the fact, ACI could not be liable vicariously for what Qanstruct did in the circumstances such as the present.
The principle stated by Sir Owen Dixon in the Colonial Mutual Life Assurance Society case is stated quite generally and would apply as much to tort of absolute liability as it would apply to a tort where there is liability only on a fault basis. In any event there is nothing that I can see in Section 16 of the Water Act that appears to codify in any way the concept of vicarious liability or even mention it. The inference is irresistible therefore that Section 16 intends in so far as it posits concepts of causation simply to adopt the law of ordinary analysis of vicarious liability. A person is regarded as causing those things which flow from the actions of those for whom that person is vicariously liable but not for those acts flowing from the acts of those for whom the first person is not vicariously liable.
(3) The Tribunal may make an order under subsection
(c) the relative strengths of the claims made by each of the parties, including whether a party has made a claim that has no tenable basis in fact or law;
(e) any other matter the Tribunal considers relevant.
Yarra Valley Water Ltd
Henley Arch Pty Ltd tas Henley Properties Group
(1931) 16 CLR 41