There has been a substantial change to the context of the site through the development of the adjoining land to the north for residential properties which was not considered under the original assessment for the proposal. Unreasonable amenity impacts to these residential properties would occur which would mitigate against the issue of a permit today.
The change in physical circumstances being the residential development to the north at 209 Chapel Road, Keysborough.
[4] The car wash must only operate between 7:.00am -- 10:.00pm. > > [16] The amenity of the area must not be detrimentally effected by the use on the land, through the: > > 16.1. Transport of materials, goods or commodities to or from the land. > > 16.2. Appearance of any building, works or materials. > > 16.3. Emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil. > > 16.4. Presence of vermin.
Wash Enclosure Entry/Exit Doors
The entry/exit doors will achieve not less than Rw20. This will be achieved by either an acoustically rated 'fast' door, or by installing two rows of roller shutter doors in series to the entry and exit of the enclosure. The roller doors will be non-perforated and well fitted to the opening to minimise noise leakage around the door perimeter.
Wash Enclosure Roof
The roof for the wash enclosure will include 0.48mm thick metal sheet externally in combination with an internal suspended cement sheet ceiling. The cavity will be not less than 92mm deep and will include 75mm x 14kg/m3 fibrous insulation. There must be no gaps between panels or around the perimeter of the roof, and the overall system will achieve an ≥Rw40 performance.
Wash Enclosure Walls
The external walls of the enclosure will be constructed using blockwork or the like. The blockwork must be built with full depth mortar and with no gaps. The external wall construction will achieve an ≥Rw45 performance.
Plant Room
The walls and roof of the plant room will be constructed as for the remainder of the wash enclosure. Any external doors to the room will be 38-40mm solid core timber fitted with perimeter acoustic seals.
Operating Limitations
The facility will operate in accordance with the Planning Permit between 7:00am and 10:00pm. The operating sequence of the wash process which emits noise will only occur during times when all façade sections are closed.
The above construction and operating limitations have formed the basis for the assessment.
[24] It is clear enough that, if it is obvious that the new permit would be refused, that will normally be an important consideration in favour of not extending the existing permit. However, the same situation does not arise if there is doubt as to whether the new permit would be granted, and if so whether it would be on the same terms. If there is doubt, the appropriate thing is to refuse the extension so that the applicant can apply again and have the proposal assessed on the basis of the current situation, including the current law, current planning policies and the current situation in relation to the land and locality. It is not enough that there might be a reasonable prospect of an identical permit being granted. If there is doubt, then the public interest requires that the new application should be made and determined appropriately. For this reason too, I would refuse this extension. (Tribunal underlining).
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
WP Holdings Australia Pty Ltd
Greater Dandenong CC [2025] VCAT 454