PRIOR TO COMMENCEMENT OF WORKS:
The following conditions must be satisfied prior to the commencement of site works, including any works relating to demolition, excavation or vegetation removal.
Approved Plans
25. A copy of the stamped approved plans must be kept on site for the duration of site works and be made available upon request to either the Principal Certifying Authority or an officer of the Council.
Building Code of Australia
26. The buildings must comply with the relevant provisions and requirements of the Building Code of Australia.
Demolition
27. Building demolition work is to be carried out in accordance with the provisions of AS 2601 - 1991 - The Demolition of Structures.
28. The disposal of any asbestos materials in accordance with the requirements of Workcover NSW and AS 2601 - 2001 - The Demolition of Structures.
Erosion and Sediment Control
29. The display of an appropriate sign to promote the awareness of the importance of the maintenance of sediment control techniques on the most prominent sediment fence or erosion control device, for the duration of the project. Note: On-the-spot fines may be imposed by Council for non-compliance with this condition.
30. The downpipes and stormwater drainage being installed and connected to the approved stormwater disposal system immediately the roof materials are positioned to prevent erosion of the site from roofwater.
Inspections
31. The following inspections of the work must be undertaken and certified. Should Council be appointed as the Principal Certifying Authority (PCA), the inspections must be carried out by Council, or may be carried out by an Accredited Certifier with Council's prior agreement. In these cases, a record of the results of the inspection must be forwarded to Council as soon as is practicable after the inspection and any associated Compliance Certificates must be forwarded to Council within 2 days of issue, to enable Council to conduct the final inspection and issue the Occupation Certificate. 48 hours prior notice must be given to Council of the required inspection.
32. At the commencement of any demolition or building work (ie. prior to any demolition, excavation, clearing or building work): Check for compliance with Development Consent conditions, including the installation of siltation controls, waste controls, hoardings, site fencing and tree protection measures, (Mandatory for all Building Classes)
33. Other inspections identified via conditions of this development consent. (Mandated by Development Consent conditions, included in Council's service as PCA)
34. After the building work has been completed and prior to the issue of any Occupation Certificate in relation to the building: Check completion of building, pool fencing, etc., is in place and hoardings, fencing, building signs, etc., are removed. (Mandatory for all building Classes. Inspection must be conducted by Council as PCA.)
Record of Inspections Carried Out
35. In accordance with clause 162E of the Environmental Planning and Assessment Regulation 2000, the certifying authority responsible for critical stage inspections must make a record of each inspection as soon as practicable after it has been carried out. Where Council is not the PCA, the PCA is to forward a copy of all records to Council.
The record must include details of: