Construct a building or construct or carry out works in the Commercial 1 Zone.
Construct a canopy above the Malvern Road footpath.
Construct a building or construct or carry out works in the Design and Development Overlay Schedule 21.
Construct a building or construct or carry out works in the Special Building Overlay Schedule 2.
Reduce the number of car parking spaces required under Clause 52.06-5 for offices and shops.
Alter access to a road in a Transport Zone 2 by reinstating a redundant crossing in Malvern Road.
Nicola Collingwood, barrister, instructed by Tristan Layton, lawyer, Planning & Property Partners Pty Ltd. They called the following witnesses:
The evidence of Kim Stapleton, architect, Pointilism Pty Ltd (photomontages) was tendered. Mr Stapleton was not called to give oral evidence.
Gareth Gale, town planner, Gareth Gale Consulting Pty Ltd
Construction of a seventh level (sixth floor) to an approved six-storey (plus basements) mixed-use development. The additional floor level would increase the height of the approved building and contains a large, three-bedroom apartment. Other changes include replacing the offices on the third floor with apartments, changing the configuration of apartments on the fourth and fifth floors and introducing a third basement level, increasing the total number of car spaces from 70 to 84. The total number of dwellings is increased from nine to 13.
Application under s 87A of the Planning and Environment Act 1987 (Vic) to amend planning permit 0957/20, issued at the direction of the Tribunal.
Adjacent to a road in a Transport Zone 2 ('TRZ2') (Malvern Road)
Design and Development Overlay Schedule 21 - Hawksburn Village Neighbourhood Activity Centre ('DDO21')
Special Building Overlay Schedule 2 - Drainage System - Stonnington City Council ('SBO2')
Clause 34.01-4 - to construct a building or construct or carry out works on land in C1Z.
Clause 36.04-2 - to construct a canopy above the Malvern Road footpath in the TRZ2.
Clause 43.02-2 - to construct a building or construct or carry out works in DDO21.
Clause 44.05-2 - to construct a building or construct or carry out works in SBO2.
Clause 52.06-3 - to reduce the number of car parking spaces required under cl 52.06-5 (for offices and shops).
Clause 52.29-2 - to alter access to a road in a TRZ2 (Malvern Road).
The subject land comprises five lots located on the north side of Malvern Road, between Cromwell Street and Hobson Street. The irregular land holding has a combined frontage of 37.1 metres, a maximum depth of 42 metres and an overall site area of 1468 square metres.
Two-storey commercial buildings occupy the land, with at-grade car parking located at the rear, accessed via McKillop Street.
An unaccompanied site inspection was undertaken prior to the hearing, on 18 October 2025, as advised to the parties.
Figure 1: South elevation of the Revision A 'decision plans' dated 21 October 2016 in proceeding P253/2017, showing the proposed seven-storey building. Condition 1(a) in planning permit 941/16 ('the 2017 permit') required the deletion of the fifth floor (Source: Council submission attachments).
Figure 2: Cropped photomontage evidence in the 2017 hearing, extracted from the Council's submissions.
Figure 3: South elevation of plans endorsed on 5 June 2019 under the 2017 permit, showing the approved six-storey building (Source: Council submission attachments).
Figure 4: South Elevation of plans endorsed on 31 August 2022 under the 2022 permit (Source: Council submission attachments).
(f) Reduction in overall building height by 0.3 metres (Roof RL 38.100m).
Figure 5: South elevation of the Revision C 'decision plans' described in Condition 1 in the 2022 permit, as amended following P1613/2023, which shows the roof parapet of the six-storey building having a height of RL 38.1 (Source: Council submission attachments).
Figure 6: South elevation, showing the proposed seven-storey building (extracted from the Revision 1 plans).
Figure 7: Cropped photomontages depicting the proposal shown in the Revision 1 plans (Source: Kim Staplelton's evidence statement in VCAT proceeding P553/2025, dated 13 October 2025).
Focus investment and growth in... Activity Centres - Housing Choice and Stations.
Build up... Activity Centres - Housing Choice and Stations... as a focus for high-quality development, activity and living that:
Encourage a diversity of housing types at higher densities in and around... Activity Centres - Housing Choice and Stations and their residential catchments.
Reduce the number of private motorised trips by concentrating activities that generate high numbers of (non-freight) trips in highly accessible activity centres.
Improve access by walking, cycling and public transport to services and facilities.
Improve the social, economic and environmental performance and amenity of activity centres.
Stonnington's activity centres range from clusters of local shops to one of Australia's most famous shopping strips, Chapel Street, and the nation's largest stand-alone shopping centre, Chadstone. These major centres serve large regional catchments well beyond the City and are the focus of a large number of entertainment uses.
There is a comprehensive network of activity centres across the City, each with their own identity and all having access to public transport.
The vibrancy, safety, heritage and unique character of different centres is highly valued.
Council seeks to enhance the network of activity centres by:
Strengthen the neighbourhood role of the activity centre as a specialty retailing destination and ensure it continues to function as a sustainable and viable centre.
Establish a more diversified land use mix.
Retain employment areas on ground and first floors and encourage residential uses above these.
Stonnington is experiencing medium to higher density development activity within its activity centres, particularly in the City's Major and Neighbourhood Activity Centres. This is expected to continue as there is a need to provide housing in well serviced areas.
Most buildings in these activity centres will be built out to the street frontage, where a fine grain building rhythm for retail and office is encouraged. Upper level setbacks will reduce visual bulk, minimise overshadowing and protect the prominence of heritage places.
A key challenge is upholding and restoring the City's distinctive built form and landscape character, protecting heritage buildings, key landmarks, important vistas and riverside environs while encouraging appropriate high quality new development.
Manage the scale, density and design of commercial development to reflect the character and identity of each centre.
Direct higher built form to major activity centres.
Design development in neighbourhood activity centres to be consistent with the existing and preferred scale and character of the centre.
Design higher built form so that it minimises impacts on the streetscape and does not dominate the heritage values and the human scale of the traditional retail strips including by:
...
Provide for additional housing in activity centres and mixed-use areas where it respects the character and amenity of adjoining dwellings and does not compromise the primary commercial and cultural role of activity centres.
To create vibrant mixed use commercial centres for retail, office, business, entertainment and community uses.
To provide for residential uses at densities complementary to the role and scale of the commercial centre.
IS THE APPLICATION INCONSISTENT WITH THE 'KING DAVID' AND 'REPEAT APPEAL' PRINCIPLES?
so is inconsistent with the King David[13] principles which cautions against using the permit amendment process to revisit or substantially alter the outcome of a mediated or Tribunal-issued permit without 'good and sound reason'.
WILL THE AMENDED DEVELOPMENT BE AN ACCEPTABLE BUILT FORM OUTCOME?
A two or three storey streetwall, with three or two, respectively, clearly visible upper storeys with potentially a sixth heavily recessive sixth storey or lift core partially visible.
Figure 8: Photo annotated by Council's urban designer, depicting the extent to which an existing sixth floor will be masked from views if infill development consistent with the DDO21 preferred five-storey building envelope occurs. The visible component is coloured red (Source: Tribunal Book page 2002).
Figure 9: Photomontage, looking west from Malvern Road, with overlaid indicative DDO masing envelope, extracted from the evidence statement of Mr Stapleton.
...due to the large size of the site there is also an opportunity to deliver a seventh storey. This additional storey however should be heavily recessed, so it effectively disappears, and the building reads as a predominantly five storey form.
The Structure Plan emphasises retaining and enhancing the village character of Malvern Road, and conserving the architectural, cultural and historic significance of Hawksburn Village. A key objective includes ensuring infill development respects Hawksburn's scale, materiality and rhythm, with particular reference to the industrial character of the Western Precinct.
The Panel is satisfied that the broad strategic directions for Hawksburn Village set out in the Structure Plan are appropriate, and consistent with the Victorian planning objectives and the policy framework. They reflect policy imperatives to promote a housing market that meets community need, and to facilitate development in targeted areas including neighbourhood activity centres, particularly those with good public transport. The Structure Plan encourages a range of housing types and a mixed use neighbourhood with varying densities that provides choice in housing, and directs economic development, built form change and housing growth to an activity centre, taking development pressure off the more sensitive residential hinterland (Clauses 11, 16 and 21.05).
...
Broadly speaking, the level of growth anticipated in the Structure Plan reflects Hawksburn Village's position in the activity centre hierarchy. The Amendment appropriately provides for a lower level of growth and intensification than the higher order centres in the municipality, and a level of growth and intensification that is broadly consistent with comparable centres such as Toorak Village (Clause 21.04).
The Panel considers that, on the whole, a 5 storey limit remains appropriate across the Western Precinct. That said, it acknowledges there are large sites (such as the BMW site) with potential to accommodate taller forms whilst still meeting character, heritage and amenity considerations. Discretionary controls will allow such proposals to be considered.
WILL THERE BE ANY UNACCEPTABLE IMPACTS ON THE AMENITY OF NEARBY RESIDENTIAL PROPERTIES?
Figure 10: Extract from the Revision 1 First Floor plan, showing the proposed form of the canopy above Malvern Road.
Figure 11: Extract from the Revision 1 South Elevation, showing the proposed form of the front façade (streetwall).
The Planning Policy Framework operates together with the remainder of the scheme to deliver integrated decision making. Planning and responsible authorities should endeavour to integrate the range of planning policies relevant to the issues to be determined and balance conflicting objectives in favour of net community benefit and sustainable development for the benefit of present and future generations.
Construct a building or construct or carry out works in the Commercial 1 Zone.
Construct a canopy above the Malvern Road footpath.
Construct a building or construct or carry out works in the Design and Development Overlay Schedule 21.
Construct a building or construct or carry out works in the Special Building Overlay Schedule 2.
Reduce the number of car parking spaces required under Clause 52.06-5 for offices and shops.
Alter access to a road in a Transport Zone 2 by reinstating a redundant crossing in Malvern Road.
(a) The southern setback of the Sixth Floor increased so that it is not visible when viewed from the opposite footpath, as demonstrated by a sightline diagram.
(b) The eastern and western setbacks of the Sixth Floor increased to a minimum of 9.0 metres.
(c) The canopies above the Malvern Road footpath to be consolidated into two canopies, maintaining the gap adjacent to the central residential and commercial entry lobbies, and to extend to 750 millimetres from the face of the kerb.
(d) The retail entry doors changed to full clear glazing.
(e) Inclusion of minimum 2.85 metre high window forms to apartment living rooms on the fourth and fifth floor levels.
(f) Details of car park ventilation shown on basement plan to show CO2 monitoring to limit usage to satisfy Clause 58.03-7 - Standard D12.
(g) Residential corridors at levels 03-06 to be mechanically ventilated to satisfy Clause 58.05-2 - Standard D18.
(h) Annotation on plans to be clarified to reference Clause 58.05-4 - Standard D20 - storage.
(i) All B type bathrooms to reposition the toilet closest to the door with all inwards opening doors having readily removable hinges to meet Clause 58.05-1 - Standard D17.
(j) Dwelling 6.01 to identify an accessible bathroom to meet Clause 58.05-1 - Standard D17.
(k) The layout of the Type A bathrooms for Dwellings 4.04 and 5.01 to remove the enclosure of the toilet to meet Clause 58.05-1 - Standard D17.
(l) All accessible dwellings to show the required clear path to the living rooms to meet Clause 58.05-1 - Standard D17.
(m) An annotation on the elevation plans (TP400, TP401, TP402 & TP403) to show the materiality of the boundary walls as concrete with a vertical linear pattern.
(n) The set-out of all of the bicycle parking racks, including space for access/egress is to be dimensioned on the plans and should align with the provisions within the Australian Standards AS2890.3 Bicycle Parking.
(o) Any changes required by Condition 3 (Material Schedule), Condition 4 (Car Parking Management Plan), Condition 5 (Landscape Plan), Condition 7 (Sustainable Management Plan), Condition 9 (Water Sensitive Urban Design Response), Condition 10 (Green Travel Plan), and Condition 13 (Waste Management Plan).
(p) Any changes required by Conditions 15 and 16.
(q) The two terraces to Dwelling 3.04 to include raised balustrade heights to 1.3 metres above the finished floor level with a 900mm wide horizontal privacy blade and integrated planted beds to the northern side.
(r) All north facing windows that are not overhung by balcony to have a 600mm deep fixed awning.
(a) A schedule of allocation of car parking spaces to each tenancy;
(b) Details of the signing and line marking of parking spaces;
(c) Detail any access controls to the parking area; and
(d) Details of the access arrangements for the bicycle facilities;
all to the satisfaction of the Responsible Authority.
(a) The layout of the development to accord with the plans required by Condition 1.
(b) Notation to confirm that the landscape irrigation system is connected to the rainwater tank(s) as default and with potable water (mains water supply) to only be used for irrigation where tanks are depleted;
(c) A planting schedule of all proposed species to be planted within the development, including botanical names, common names, pot/planter sizes, sizes at maturity, and quantities of each plant;
(d) Soil volumes for each planter box to be installed;
(e) Details of the irrigation system that will support the planting;
(f) The on-going maintenance regime that will be implemented to ensure the sustained health of the planting;
(g) Details of all proposed hard surface materials including pathways, patio or decked areas; and
(h) More diverse planting in the perimeter planter boxes on Level 5 and 6.
(a) The layout of the development to accord with the plans required by Condition 1.
(b) Connection of all urinals to rainwater tank(s), if any proposed.
(c) Demonstrate how Best Practice measures from each of the 10 key Sustainable Design Categories of Stonnington Council's Sustainable Design Assessment in the Planning Process (SDAPP) have been addressed.
(d) Identify relevant statutory obligations, strategic or other documented sustainability targets or performance standards.
(e) Document the means by which the appropriate target or performance is to be achieved.
(f) Identify responsibilities and a schedule for implementation, and ongoing management, maintenance and monitoring.
(g) Demonstrate that the design elements, technologies and operational practices that comprise the SMP can be maintained over time.
(a) A description of the location in the context of alternative modes of transport.
(b) Any actions and recommendations designed to reduce the use of cars and increase the use of alternative travel methods.
(c) Sustainable transport goals linked to measurable targets, performance indicators, monitoring timeframes, and costs.
(d) Initiatives that would encourage employees and visitors of the development to utilise active private and public transport and other measures that would assist in reducing the amount of private vehicle traffic generated by the site.
(e) Details of GTP funding and management responsibilities.
(f) Promotion of existing car-share schemes, bicycle parking facilities for employees/visitors, railway stations, tram stops, bus stops, taxi ranks, and bicycle paths.
(g) Details of bicycle parking and bicycle routes.
(h) Signage and wayfinding information for bicycle facilities and pedestrians pursuant to Australian Standard AS2890.3.
(i) Provision of ensuring visitor bicycle parking is accessible from office lift lobby.
(j) Establishment of a car-pooling database for employees.
(k) Include provisions to be updated not less than every 5 years.
(a) The layout of the development to accord with the plans required by Condition 1.
(b) Swept path diagrams for nominated waste collection vehicle(s) demonstrating that waste collection vehicle(s) is able to enter and egress the car park and ramp in a forward direction and will not strike any overhead obstruction along the ramp and at the car park entrance (with any roller door in an open door position).
(c) Detail and height of waste collection vehicle(s) must be provided on the swept path diagrams and headroom clearance templates/cross sections.
(d) Collections restricted to the hours of 8:00am to 6:00pm, Monday to Saturday.
(e) Compaction of refuse to only be carried out while on the move once the collection vehicle is no longer in McKillop Street.
(f) Bottles must not be broken up at the point of collection or while the collection vehicle is in McKillop Street.
(g) Allocated space for hard waste.
(h) Allocated space for glass, organics and cardboard for commercial tenants.
(a) The development is not started within three years of the issue date of this permit.
(b) The development is not completed within five years of the issue date of this permit.
In accordance with s 69 of the Planning and Environment Act 1987 (Vic), a request may be submitted to the Responsible Authority within the prescribed timeframes for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons. At the start of the hearing, I advised the parties that in my preparations for the hearing, I inadvertently clicked on a 'ShareFile' link circulated by the applicant that contained documents relating to the compulsory conference held in this proceeding. I did not download or view the documents. No questions or concerns were raised by any person in relation to the declaration.
[2] Council submissions at [45], which also notes the owner may ask for an extension of time to commence the development within six months of the permit expiring, under s 69(1) of the Planning and Environment Act 1987 (Vic) ('PE Act').
[4] As advised by Mr Twite, having sought advice from the architects via his instructors.
[5] As advised by Mr Twite during evidence-in-chief, based on a spot level on the Malvern Road footpath of RL 16.96.
[6] Emails dated 15 September 2025 and 22 October 2025, sent on behalf of Amanda Turner, indicate she no longer objects to the proposal subject to conditions relating to privacy screening. The condition sought by Ms Turner is not opposed by the applicant or any other party.
[7] 'Proposed Sixth Floor' per the application plans.
[8] Department of Transport and Planning, 2025.
[11] Clause 15.01-2L-01 Building Design.
[12] Hawksburn Village Neighbourhood Activity Centre.
[13] This is a reference to the Tribunal's decision in the case of The King David School v Stonnington CC & Ors (includes Summary) (Red Dot) [2011] VCAT 520 ('King David').
[18] Reichart v Banyule CC [1996] VICCAT 44.
[19] Tribunal Book, page 2002, City of Stonnington Urban Design referral advice. It is noted the referral advice was prepared based on the lodged plans (Revision F), not the Revision 1 plans that are before me. Council stated it was unable to obtain updated advice from the urban designer, as he is no longer a Council employee.
[20] As evidenced by the inclusion of photomontages overlaid with 'indicative DDO massing' envelopes in Mr Stapleton's evidence statement.
[21] Tribunal Book, page 2003, City of Stonnington Urban Design referral advice.
[22] Ms Roberts' evidence statement at [84].
[24] Applicant's submissions at [49].
[25] Stonnington Planning Scheme Amendment C272ston, Panel Report, page [22-23 of 116], 30 July 2020.
[27] For example, at cl 15.01-2L-01 (Building design, Strategies, Building heights) which discourages 'development that is significantly higher or lower in height than the surrounding buildings unless a different preferred height is specified for the particular area in another provision of the planning scheme or in a structure plan.'
[28] Except for the western sides of the Apartment 3.04 and 4.04 terraces, the northern and western sides of the Apartment 5.02 terrace and the northern side of the Apartment 6.01 terrace, none of which have privacy ledges fixed to the balustrade. The Apartment 6.01 balustrade has a height of 1.0 metres.
[29] Ms Roberts' evidence statement at [22].
[30] Mr Twite's evidence statement at [8]. The amendments to the building envelope are described in greater details in his evidence at [34] and include an increase to the Level 3 setback from the northern boundary by 1.6 metres to 2.0 metres, an increase to the Level 4 setback from the north-west to 8.4 metres and 9.2 metres, and the addition of Level 6.
[32] For example, at cl 15.01-1L-01, Urban design strategies, Public realm.
[34] Such as at cl 16.01-1L-01 (Housing supply and diversity), which seeks to 'direct the majority of new residential development to locations with the highest level of accessibility to both an activity centre and the Principal Public Transport Network, and away from the residential hinterland'.