Figure 2 Extract from Amended Estate Development Plan[2]
To implement the Municipal Planning Strategy and the Planning Policy Framework.
To manage the transition of non-urban land into urban land in accordance with a precinct structure plan.
To provide for a range of uses and the development of land generally in accordance with a precinct structure plan.
To contain urban use and development to areas identified for urban development in a precinct structure plan.
...
Figure 3 Extract from Plan 2 Future Urban Structure in PSP
IS THE SUBDIVISION GENERALLY IN ACCORDANCE WITH THE PSP?
Co-ordinate development sequencing and staging with the delivery of key infrastructure.
Council maintains this ground because the Applicant refuses to acknowledge its role in the timely delivery of services and infrastructure, such as the delivery at the outset of the subdivision of transport, pedestrian and cycling links to the north, east and south.
... Our assessment indicates that placing interim detention basins within future lot boundaries will result in significant cut requirements, with associated batter and maintenance constraints due to the steep grades of the site. Grades in the waterway reserve are much flatter hence we strongly encourage to construct the interim detentions adjacent to road reserves at the fringe of the waterway corridor subject to detailed design. Detention basins should be aligned to minimise environmental impacts on the existing waterway.
Preserve and enhance areas with high environmental values.
Giant Gippsland Earthworm and Warragul Burrowing Crayfish
Tribunal assessment of Dwarf Galaxias and Growling Grass Frog
SUBDIVISION DESIGN INCLUDING EARTHWORKS AND RETAINING WALLS
O1 Preserve the rural character of the Baw Baw Shire by retaining significant elements of the landscape and maximising views to the town's hinterland.
O6 Respond to the existing topography of the land.
...the employment of extensive retaining wall structures has resulted in unsatisfactory planning outcomes given their visual presence and propensity to dominate both landscape and neighbourhoods. It is for this reason, as well as the need to ensure development is accessible and safe, that the Warragul PSP requires landscape and topography to be considered from the outset and integrated into the design of proposals on steep sites.
The proposed finished gradient and levels of the lots are a key consideration for builders, particularly where the slope of the building pad area (within the Building Envelope) starts to exceed about 5% - 6%, as the amount of work associated with the site preparation earthworks, slab underside works and garden retaining walls increases with higher slopes resulting in higher building costs.
...the underlying engineering analysis of the site constraints, existing and proposed design levels and slopes and other intrinsic elements of the overall design cannot be undermined or over-simplified.
RESPONSE TO CLAUSE 56 - RESIDENTIAL SUBDIVISION
(a) Roads realigned and the road reserve adjacent to tree group 2 enlarged to accord with the recommendations at paragraphs 5.4, 5.26 and 5.27 of the Arboricultural Report (John Patrick Landscape Architects, 21 February 2024).
(b) Trees 42 and 52 as existing trees that are proposed to be removed.
(c) The 'Temporary Access Road (5.5m wide)' shown instead as a 7.3 metre-wide road including a 1.5 metre-wide footpath.
(d) Cross-sections for all subdivisional roads. All cross-sections are to be in accordance with the Warragul PSP, except for Road 1 and Road 10.
(e) A notation that no pedestrian path is to be constructed within the Waterway Reserve or on the western side of Road 10.
(f) Building envelopes with the required setback to achieve a BAL 12.5 or BAL 19 rating for all allotments, in accordance with the bushfire hazard assessment by EcoLink Consulting dated June 2022.
(g) A notation that Stage 1A of the subdivision cannot be subdivided until the adjoining Government Road to the north is able to be constructed to the north of the lots in Stage 1A.
(h) A notation to the effect that Road 2 must be constructed so that it will not impact tree group 2, as set out on the Estate Development Plan prepared by Reeds Consulting, version E11, dated 15 January 2024.
(i) A notation to the effect that lots 116 - 121 (inclusive) cannot be subdivided until such time as the trees in tree group 4 have been removed, as set out in the Estate Development Plan prepared by Reeds Consulting, version E11, dated 15 January 2024.
(j) A notation to protect the Strzelecki Gum trees 12, 13, 15, 19, 24, 26, 41, 46, 48 and 49, and to ensure that road 10 is set back an appropriate distance from these trees, as set out on the Estate Development Plan prepared by Reeds Consulting, version E11, dated 15 January 2024.
(k) The removal of Lot 325 and the continuation of Road 10 to the southern boundary of the subject site.
(a) the interim access road being removed in accordance with condition 7 and the relevant part of the drainage reserve being restored in accordance with condition 8;
(b) if the Responsible Authority advises the permit holder in writing that the interim access road does not have to be removed, the date that the Responsible Authority provides this advice; or
(c) 10 years from the date the bank guarantee or bond is provided in accordance with condition 6.
(a) the interim detention basins being removed in accordance with condition 11 and the relevant part of the drainage reserve being restored in accordance with condition 12.
(b) if the Responsible Authority advises the permit holder in writing that the interim detention basins do not have to be removed, the date that the Responsible Authority provides this advice; or
(c) 10 years from the date the bank guarantee or bond is provided in accordance with condition 10.
Native Vegetation Permitted to be Removed, Destroyed or Lopped
(a) Be in accordance with the Guidelines for the removal, destruction or lopping of native vegetation (DELWP, 2017) and the expert statement of Mr LeBel dated 20 February 2024.
(b) Describe all efforts to avoid and minimise the removal of native vegetation.
(c) Describe the strategic level planning that has informed the removal of native vegetation.
(d) Describe any site level planning including how the development has been sited or designed to avoid and minimise impacts to native vegetation.
(e) Explain that there are no other feasible opportunities to further avoid or minimise the removal, destruction or lopping of native vegetation.
(a) Native Vegetation Offset is available to purchase from a third party, or
(b) Native Vegetation Offset will be established as a new offset and has the agreement of the proposed offset provider, or
(c) Native Vegetation Offset can be met by a first party offset.
(a) An established first party offset site including a security agreement signed by both parties and a management plan detailing the 10-year management actions and ongoing management of the site; and/or
(b) Credit extract(s) allocated to the permit from the Native Vegetation Credit Register.
(a) A plan showing:
- All trees numbered in accordance with the Arboricultural Report (John Patrick Landscape Architects, 2024).
- Any additional trees identified by the arborist that will require removal and are not recorded within the Arboricultural Report shown and recorded with a unique identification number.
- Native Trees approved to be removed, destroyed, or lopped in accordance with the Native Vegetation Removal Report endorsed under condition 17.
- Exotic Trees which are to be removed.
(b) Tree Protection Zone requirements as detailed in conditions 27 and 28.
(c) Specific Tree Protection Zone requirements for trees within Tree Group 4 that are located on adjacent property, if they have not been removed.
(d) Requirements for construction within the Tree Protection Zones including reference to any trees where construction within the Tree Protection Zones is not permitted.
(e) Requirements for management of tree roots encountered during construction.
(f) Requirements for the supervision works occurring within a Tree Protection Zone by a suitably qualified and experienced Arborist. Evidence that supervision has occurred must be provided to the Responsible Authority upon reasonable request. The evidence must include:
- Documentation requirements for Arborist site visits and supervision including site specific information, date, time, tree number, health, structure, and any notable deviations from the information included in the Arboricultural Report.
- Any deviations from approved construction methodology.
- Reference to specific Tree Protection Zone requirements as applicable.
- Any other detail as recommended by the Arborist.
(g) Any other detail as reasonably required by the Responsible Authority.
(a) Be erected before any machinery or materials are brought on site;
(b) Be chain-mesh temporary fencing;
(c) Be at least 1.8m high;
(d) Have signs denoting it as the Tree Protection Zone. The signage must be visible from within the development and be compliant with AS 1319-1994 Safety Signs for the Occupational Environment;
(e) Not be removed or altered until all works have been completed, without approval from the Responsible Authority.
(a) Excavation, except as required to construct retaining walls or roads.
(b) Cultivation.
(c) Storage of any materials and placement of fill.
(d) Preparation of chemicals, including preparation of cement products.
(e) Parking of vehicles and plant.
(f) Refuelling.
(g) Dumping of waste.
(h) Wash down and cleaning of equipment.
(i) Lighting of fires.
(j) Soil level changes.
(k) Temporary or permanent installation of utilities and signs.
(l) Landscaping including any required revegetation activities but excluding weed removal.
(m) Physical damage to the tree.
(a) A statement of the general condition of individual trees.
(b) Details of any deviations from the endorsed Tree Management Plan and their impact on trees.
(c) Recommendations for future remedial work, as a result of any deviations from the Tree Management Plan.
Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan
(a) A plan showing the location of the Giant Gippsland Earthworm and Warragul Burrowing Crayfish colonies and habitat areas identified in Figure 3 of the Addendum to GGE and WBC Assessment (INVERT-ECO, 16 January 2024).
(b) Details of Conservation Zones including:
- Buffer distance between the edge of the colony and habitat areas and location of Conservation Zone fencing.
- Conservation Zones marked on a plan.
- Conservation Zone requirements in accordance with conditions 33 and 34.
(c) Requirements for a pre-clearance site assessment for working within or within 15m of the Conservation Zone where construction is required.
(d) Requirements for supervision of construction works by a suitably qualified and experienced Ecologist when working within or within 15m of the Conservation Zones.
(e) Requirements for reporting on construction activities within or adjacent to the Conservation Zones.
(f) Construction methodologies to maintain current hydrological conditions.
(g) Include a yearly plan for monitoring of both species for a minimum of five years from the date of certification of Stage 1, or two years after the date of Statement of Compliance of Stage 3, whichever is later.
(h) Include procedures which must be followed in the event of an accidental unearthing of the WBC, generally in accordance with the Salvage and Release Protocols for the accidental unearthing of Warragul Burrowing Crayfish (INVERT-ECO, December 2015).
(i) Includes procedures which must be followed in the event of an accidental unearthing of the GGE, generally in accordance with the Guidelines for the Accidental Unearthing of Giant Gippsland Earthworms (INVERT-ECO, March 2016).
(a) Be constructed around the Giant Gippsland Earthworm and Warragul Burrowing Crayfish habitat areas identified in Figure 3 of the Addendum to GGE and WBC Assessment (INVERT-ECO, 16 January 2024), and around Dwarf Galaxias habitat areas identified in Figure 1 of the Targeted Dwarf Galaxias and Growling Grass Frog Survey (EcoLink Consulting, 18 January 2022), except in the location of interim detention Basin A, Road 1 and the retaining wall to the south of Road 1.
(b) Be erected before any machinery or materials are brought on site.
(c) Be chain mesh temporary fencing.
(d) Be at least 1.8m high.
(e) Have signs denoting it as a Conservation Zone where no access is permitted.
(f) Must not be removed or altered without approval from the responsible authority.
(a) Excavation including trenching but excluding fencing.
(b) May Cultivation.
(c) Storage of any materials and placement of fill.
(d) Preparation of chemicals, including preparation of cement products.
(e) Parking of vehicles and plant.
(f) Refuelling.
(g) Dumping of waste.
(h) Wash down and cleaning of equipment.
(i) Lighting of fires.
(j) Soil level changes.
(k) Temporary or permanent installation of utilities and signs.
(l) Landscaping, including any required revegetation activities but excluding weed removal.
(a) Reference to the Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan prepared pursuant to condition 31.
(b) Provide recommendations for the management of Dwarf Galaxias and Growling Grass Frog habitat including:
- Requirements to protect the designated waterway and 10m either side with temporary fencing in accordance with the Conservation Zone fencing requirements listed in conditions 33 and 34.
- Details of the feasibility of incorporating threatened species habitat into the interim detention basins.
- Requirements for the interim road crossing so that installation of culverts does not impact current water flow regimes.
- Construction requirements to ensure that Dwarf Galaxias habitat is appropriately protected from sediment, erosion, chemical pollutants, and other associated impacts.
- Requirements for timing of works including reference to works being undertaken in appropriate seasons and avoiding key breeding periods.
- Requirements for water quality testing including establishing and maintaining an ongoing monitoring regime to ensure the water quality does not deteriorate during and post-construction.
- Monitoring requirements including any requirements for follow up site surveys.
(c) Requirements for supervision by a qualified Ecologist/Zoologist during vegetation removal in accordance with the requirements of the Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan prepared pursuant to condition 31.
(d) Requirements for reporting to the Responsible Authority.
(e) Any other detail as reasonably requested by the Responsible Authority.
(a) The landscaping theme and graphical concepts to be developed for the subdivision including all reserve areas and waterways.
(b) Location of all existing vegetation with retained trees clearly indicated.
(c) Conservation Zones for Giant Gippsland Earthworm and Warragul Burrowing Crayfish in accordance with the endorsed Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan.
(d) The location of existing natural features including waterways.
(e) Proposed location of paths, pavement areas and other structures including play structures.
(f) Proposed path material.
(g) Areas which will be available for landscaping including indicative areas to be revegetated within the Waterway Reserve.
(h) Indicative locations of proposed wetlands and retarding basins.
(i) Proposed implementation of any relevant landscape requirements or guidelines in the Warragul Precinct Structure Plan.
(j) Revegetation of the batters and road verges with local provenance plant species representative of the Swampy Riparian Woodland EVC.
(k) Any other detail as reasonably requested by the Responsible Authority.
(a) Location of existing natural features including retained trees and their Tree Protection Zones, Giant Gippsland Earthworm and Warragul Burrowing Crayfish habitat areas and existing natural waterways.
(b) New plantings including their layout to be provided in any road reserves and within the Waterway Reserve.
(c) Tree Protection Zones in accordance with AS4970-2009.
(d) Proposed street tree planting including the tree species in accordance with Baw Baw Shire Council's Tree Selection, Planting and Maintenance Policy. Landscaping must contribute to habitat for indigenous fauna species.
(e) Proposed revegetation within the Waterway Reserve. Revegetation should be in accordance with the modelled Ecological Vegetation Class, West Gippsland Catchment Management Authority and Baw Baw Shire Council Waterway Management Plan Guidelines, Giant Gippsland Earthworm and Warragul Burrowing Crayfish guidelines listed in the endorsed Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan.
(f) All proposed street tree planting using semi-advanced trees with species selection that is in accordance with Baw Baw Shire Council's Tree Selection, Planting and Maintenance Policy. Trees must have a minimum container size of 45 litres.
(g) Detailed planting schedule of all proposed trees, shrubs and groundcovers including botanical names, common names, pot sizes, sizes at maturity, quantities, and densities of each plant.
(h) Detailed planting and construction drawings including site contours and any proposed changes to existing levels including any structural elements including retaining walls.
(i) Location of wetlands and retarding basins including necessary maintenance structures including hard stands and dewatering sites.
(j) Materiality and finish detail for paths, lighting typologies, street furniture detail, bicycle parking design and specification, and equipment specification (as applicable) with standard and safety compliance detail.
(k) Proposed implementation of any relevant landscape requirements or guidelines in the Warragul Precinct Structure Plan.
(l) Proposed implementation of removal of all exotic species including exotic grass from the Waterway Reserve, and mulching and underplanting of the Waterway Reserve with indigenous shrubs perennials and grasses, provided the mulching and underplanting is consistent with the Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan.
(m) A sign placed near the Waterway Reserve stating that access to the Waterway Reserve by pedestrians or vehicles is prohibited.
(n) Installation of a barrier to prevent vehicle access into the Waterway Reserve, such as timber bollards or logs.
(o) Any other detail as reasonably requested by the Responsible Authority.
(a) A waterway design drawing identifying the existing environmental values to be retained and protected, including native vegetation, Giant Gippsland Earthworm and Warragul Burrowing Crayfish.
(b) Site preparation details prior to implementation of revegetation activities (i.e., removal/control of high-threat weeds).
(c) Details of revegetation/restoration activities, monitoring activities and planting standards, including:
- A list of proposed vegetation plantings, including species and plant numbers/density. All species must be from the relevant Ecological Vegetation Class (EVC) in accordance with the West Gippsland Catchment Management Authority and Baw Baw Shire Council Waterway Management Plan Guidelines.
- Tube stock planting standards.
(d) Details of wetland construction and maintenance including:
- Location of wetlands and retarding basins.
- Location and access of hard stands.
- Location and access of dewatering sites.
(e) An assessment of the existing farm dam including:
- A geotechnical report from a suitably qualified engineer demonstrating how any walls or mounds:
(1) Are capable of managing any alterations to stormwater volumes or velocity as a result of urban development.
(2) Are to be augmented or adjusted to achieve the above.
(3) Do not pose a downstream risk to life or property in the event of a failure.
(a) Assess the entire subject site (excluding the area within the farm zone and also outside the Waterway reserve) for noxious and environmental weeds.
(b) Provide information on the species and their current coverage.
(c) Provide eradication targets for each species (e.g. less than 5% or less than 1%).
(d) Provide details on the management of weeds including:
- Methodology for control including manual and chemical control options and a list of herbicides as required.
- Reference to the management intervals including recommendations for treatment prior to, during and post-construction.
- Methodology for control in areas of remnant native vegetation.
- Methodology for control in Giant Gippsland Earthworm and Warragul Burrowing Crayfish Conservation Zones and within a 15m buffer around the Conservation Zones.
- Methodology for working within natural waterway areas including reference to water-safe requirements and working around Dwarf Galaxias and within 15m of the edge of the waterway.
- Methodology for working around Interim Detention Basins.
(e) Specify photo point monitoring locations.
(f) Include any other detail as reasonably required by the Responsible Authority.
(a) A subdivision layout drawn to scale, including proposed street names if known, lot areas, lot numbers and widths of street reservations.
(b) Topography and existing features, including contours for the subject land and any affected adjacent land.
(c) Proposed speed limits on all roads including a reduction in the prevailing speed limit of the relevant section of Warragul-Lardner Road to 70km/h, proposed location of speed limit signs and Local Area Traffic Management devices, including the traffic management devices shown in Figure 18 of the Expert Witness Statement of Jason Walsh (Traffix, 16 February 2024), incorporated into road designs to ensure slow speed environments as required by the Responsible Authority.
(d) Typical cross-sections for each street type, including any spatial requirements identified in the Warragul Precinct Structure Plan.
(e) Typical cross-sections in any areas of cut and fill involving retaining walls.
(f) Location and alignment of kerbs, indented parking spaces, footpaths, shared paths, bus stops and traffic controls including traffic calming devices.
(g) A table of offsets for all utility services and street trees.
(h) Preliminary location of reserves for electrical kiosks.
(i) Preliminary location of street lights.
(j) Preliminary master services plan.
(k) Access from Warragul-Lardner Road.
(l) Drainage outfall system (both interim and ultimate), indicating legal point of discharge.
(m) The proposed minor drainage network and any land required for maintenance access.
(n) The major drainage system, including any watercourse, lake, wetland, silt pond, and/ or piped elements showing preliminary sizing and any access requirements for construction and maintenance.
(o) Overland flow paths and calculations (1% AEP) to indicate how excess runoff will be safely conveyed through the subdivision.
(p) Alignment of roads and reserves with any adjoining estates to ensure continuity and provide conveyance of overland flows to the satisfaction of the Responsible Authority.
(q) Giant Gippsland Earthworm and Warragul Burrowing Crayfish Conservation Zones where no works can occur.
(a) Engineering plans and specifications of the proposed works that are to become public assets such as roads, paths, intersections, drains, bridges and the like.
(b) Location of Permanent Survey Marks.
(c) Details of any cut and fill including retaining walls.
(d) All road dimensions and cross sections to IDM requirements and reflecting the features and/or variations appropriate to the standard of road outlined in the Warragul Precinct Structure Plan unless otherwise agreed by the Responsible Authority.
(e) Pavement design using a recognised engineering methodology based on a geotechnical investigation of the site in accordance with IDM 12.7 including consideration of the in-situ soil conditions and available road-making materials. The geotechnical investigation report must be submitted with the engineering plans.
(f) SM2 modified kerb on all roads except where there is a frontage to a park or reserve, where B2 barrier kerb must be used unless otherwise agreed by the Responsible Authority.
(g) Location of speed limit signs and traffic management devices.
(h) A driveway crossover for each lot designed for the standard vehicle with regard to horizontal and vertical clearances in accordance with IDM Standard Drawings. Crossovers on corner lots must be delineated and marked "Construction by Developer".
(i) Temporary turnaround areas within or outside the site (sealed or unsealed as directed by the Responsible Authority) for waste collection vehicles (8.8 metres in length) at the temporary dead end of any road.
(j) Master services plan.
(k) Location of street lighting.
(l) Major and minor drainage generally in accordance with the Stormwater Management Strategy Report (Reeds, 8 November 2021).
(m) Details of any retarding basin and wetland in accordance with the Stormwater Management Strategy Report (Reeds, 8 November 2021).
(n) Underground drains incorporating features to prevent litter, sediments, and oils from entering the drainage system (in particular waterways) and/or cut-off drains to intercept storm water run-off from adjoining properties as appropriate and to the satisfaction of the Responsible Authority.
(o) Drainage infrastructure that caters for the future development of any unit sites identified on the subdivision concept plan (Note 2 of Table 10 in IDM).
(p) Tree Protection Zones of all retained trees on the subject site.
(q) Tree Protection Zones of trees on adjacent property which may be impacted by development including trees in road reserves.
(r) Giant Gippsland Earthworm and Warragul Burrowing Crayfish Conservation Zones where no works can occur.
(s) Dwarf Galaxias Conservation Zones where no works can occur.
The Site Management Plan (SMP) must be submitted in typed A4 format, with attachments as necessary, and must identify, address, and document every item listed below, in order:
(a) A construction program in bar chart form (major time interval in months, minor time interval in weeks) clearly indicating the start-up meeting, all tasks and all hold points including submission of "As Constructed" plans and CCTV inspections.
(b) A site plan clearly indicating the location of all public noticeboards, site access, security fencing, site office and rest rooms, plant depot, rumble strips, vehicle wash bays, soil stockpiles, tree protection zones, temporary drainage protection measures and any other relevant operational or construction features.
(c) A program for notification (initial notification and updates as required) of all residents and businesses who will be directly affected by the construction works, including hours of works and a phone number of a representative of the contractor that can be contacted at any time should there be any complaints or concerns in connection with the works.
(d) Occupational Health and Safety arrangements.
(e) A site-specific Environmental Management Program for all on-site personnel including contractors; including procedures for working within the waterway reserve to avoid impacts on the Warragul Burrowing Crayfish habitat and Giant Gippsland Earthworm habitat, as applicable; including specific procedures and site inductions on Accidental Unearthing Guidelines for Giant Gippsland Earthworm and Warragul Burrowing Crayfish.
(f) Appropriate cultural protection measures in accordance with any approved Cultural Heritage Management Plan applying to the land.
(g) A Traffic Management Plan including the proposed route for construction vehicle access to the site, and arrangements for any road closures.
(h) Any specific measures required to protect Council assets during construction including prevention of earth being tracked onto surrounding roads by vehicles and cleaning of roads if necessary.
(i) Measures to reduce the impact of noise, dust and other emissions created during the construction process.
(j) Measures for control of stormwater during construction, including preventing erosion and any stormwater runoff onto adjoining properties and ensuring that no mud, dirt, sand, soil, clay, or stones are washed into or allowed to enter the stormwater drainage system.
(k) Measures to ensure that all machinery brought onto the site is weed and pathogen-free.
(l) Control and management of any soil to be imported or removed from the site and any soil stockpiles.
(m) Waste management during construction.
(n) All retained trees including those on adjacent property marked on the plans with their Tree Protection Zone marked.
(o) Reference to the endorsed Tree Management Plan.
(p) All Giant Gippsland Earthworm and Warragul Burrowing Crayfish Conservation Zones marked on plans.
(q) Reference to the endorsed Giant Gippsland Earthworm and Warragul Burrowing Crayfish Management and Monitoring Plan.
(r) Specific procedures for working within the Waterway Reserve including site inductions and Accidental Unearthing Guidelines for Giant Gippsland Earthworm and Warragul Burrowing Crayfish.
(s) Reference to Dwarf Galaxias and habitat areas.
(t) Details for fauna management including measures to prevent impacts to Dwarf Galaxias.
(u) Reference to the endorsed Fauna Management Plan
(v) Reference to the endorsed Weed Management Plan.
(w) Measures to prevent sedimentation and erosion within the Conservation Zones and Tree Protection Zones and within a 5 metre buffer of the zones.
(x) Provide locations for construction stockpiles, machinery, and other storage of materials in a location away from retained biodiversity.
NOTE: It is expected that the SMP will comprise no more than two paragraphs of information in response to each of the items numbered a) to n) plus explanatory plans as required. Any additional background documents must be referenced in the SMP and provided as separate pdf files if requested by Council.
(a) Compaction testing and proof rolling of subgrade, sub-base and base course layers and proof rolling in preparation for asphalt must be undertaken at developer's cost in accordance with IDM clauses 12.7.10 to 12.7.16 (IDM Version 5.40 or later) and results submitted to Council for approval and records purposes.
(b) A wearing course of asphalt unless otherwise approved by the Responsible Authority.
(c) Any road works abutting an existing carriageway must ensure adequate surface drainage to the kerb and channel or road shoulder and provide a smooth watertight seal without discontinuity to the existing carriageway, generally in accordance with IDM Standard Drawing SD130.
(a) Be constructed in accordance with the stormwater drainage design approved by the Responsible Authority; and
(b) Provide a legal point of stormwater discharge for each allotment all to the satisfaction of the Responsible Authority.
(a) digital road, drainage, and open space (R-SPEC, D-SPEC & O-SPEC) information in AutoCAD format for all works where Council is the responsible authority.
(b) all X-refs bound into the drawings and showing any amendments during construction and location of any permanent survey marks in accordance with the current version of R-SPEC, D-SPEC & O-SPEC.
(c) all graphical information is to be provided in the datum of GDA94 and projection of MGA Zone 55.
The submitted information must be provided at no cost to the responsible authority and to the satisfaction of the responsible authority. (Refer to the A-SPEC website www.a-specstandards.com.au for minimum Council requirements).
The various road, drainage and open space works must be maintained until this condition has been complied with.
(a) Before the issue of Statement of Compliance for the plan of subdivision submitted for each stage of the subdivision under the Subdivision Act 1988, the Development Contributions Plan levies applicable for the land must be paid to the Responsible Authority in accordance with the Development Contributions Plan as indicated in the Baw Baw Planning Scheme. Payment of the levy must be made after certification of the relevant plan of subdivision but not more than 21 days prior to issuance of Statement of Compliance in respect of that plan of subdivision.
(b) The Public Infrastructure Plan (PIP) endorsed by the Responsible Authority under condition 88 will be implemented.
(c) Subject to the PIP being endorsed by the Responsible Authority to carry out Development Contributions Plan projects listed within the PIP as Works in Kind and subject to such projects being constructed per the standards detailed out in the DCP / PSP and achieving a certificate of Practical Completion, the developer will be entitled to offset any Development Contributions Plan levies against Works in Kind credits owing to the developer.
(d) Before a Building Permit is issued for the construction of any dwelling on a lot, the lot owner must pay the Community Infrastructure Levy to the Responsible Authority in accordance with the Development Contributions Plan Overlay - Schedule 1.
The owner of the land must pay all reasonable costs for the preparation, execution, and registration of the Section 173 Agreement. The Section 173 Agreement must be registered in accordance with the provisions of Section 181 of the Planning and Environment Act 1987. Only condition 88(d) must be registered on individual residential lots.
(a) List all infrastructure items relevant to the subject site either delivered by the developer or others and whether such infrastructure are Development Contributions Plan (DCP) funded or non-DCP items, the stage at which each infrastructure item is being delivered and the expected year of delivery.
(b) The infrastructure as set out in the Development Contributions Plan applying to the land is sought to be provided as "works in kind" subject to the consent of the Responsible Authority.
(c) Any land that is affected or required for the provision of infrastructure works, the area, and the timing of when such land will be provided.
The Public Infrastructure Plan must not be altered without the prior written consent of the Responsible Authority.
(a) a telecommunications network or service provider for the provision of telecommunication services to each lot shown on the endorsed plan in accordance with the provider's requirements and relevant legislation at the time; and
(b) a suitably qualified person for the provision of fibre ready telecommunication facilities to each lot shown on the endorsed plan in accordance with any industry specifications or any standards set by the Australian Communications and Media Authority, unless the applicant can demonstrate that the land is in an area where the National Broadband Network will not be provided by optical fibre.
(a) a telecommunications network or service provider that all lots are connected to or are ready for connection to telecommunications services in accordance with the provider's requirements and relevant legislation at the time; and
(b) a suitably qualified person that fibre ready telecommunication facilities have been provided in accordance with any industry specifications or any standards set by the Australian Communications and Media Authority, unless the applicant can demonstrate that the land is in an area where the National Broadband Network will not be provided by optical fibre.
Construction Management Plan - Bushfire Management
(a) Measures to reduce the risk from fire within the surrounding rural landscape and protect residents form the threat of fire including the provision of fire hydrants to the satisfaction of the Country Fire Authority.
(b) A separation buffer, consistent with the separation distances specified in AS3959-2009, between the edge of development and adjoining undeveloped land.
(c) How adequate opportunities for access and egress will be provided for early residents, construction workers and emergency vehicles.
West Gippsland Catchment Management Authority
(a) The 1% AEP flood extent and depth for all waterways on the proposed development site.
(b) That all proposed lots are located outside the 1% AEP flood extent.
(c) That all lots have safe egress to flood free land where emergency facilities are located during a 1% AEP flood event.
(d) That 1% AEP flood levels will not be increased on neighbouring properties as a result of this development.
(a) Details of existing environmental values.
(b) Details of any initial stabilisation and vegetation works.
(c) A landscape plan for revegetation of land within the drainage reserve, including a species list and proposed density of the plantings. The vegetation must be representative of the Ecological Vegetation Class for the site. Any area required to be cleared of vegetation to create defendable space must not encroach into the required revegetation within the waterway buffer.
(d) A maintenance plan detailing the sequencing and periods of short, medium and long term actions, including inspections, and the parties responsible for each action.
The Waterway Management Plan prepared under this condition must be consistent with the plan required in condition 39 and may be the same plan.
(a) Enter in an agreement with Ausnet Electricity Services Pty Ltd for supply of electricity to each lot on the endorsed plan.
(b) Enter into an agreement with Ausnet Electricity Services Pty Ltd for the rearrangement of the existing electricity supply system.
(c) Enter into an agreement with Ausnet Electricity Services Pty Ltd for rearrangement of the points of supply to any existing installations affected by any private electric power line which would cross a boundary created by the subdivision, or by such means as may be agreed by Ausnet Electricity Services Pty Ltd.
(d) Provide easements satisfactory to Ausnet Electricity Services Pty Ltd for the purpose of "Power Line" in the favour of "Ausnet Electricity Services Pty Ltd" pursuant to Section 88 of the Electricity Industry Act 2000 (Vic), where easements have not been otherwise provided, for all existing Ausnet Electricity Services Pty Ltd electric power lines and for any new power lines required to service the lots on the endorsed plan and/or abutting land.
(e) Obtain for the use of Ausnet Electricity Services Pty Ltd any other easement required to service the lots.
(f) Adjust the position of any existing Ausnet Electricity Services Pty Ltd easement to accord with the position of the electricity line(s) as determined by survey.
(g) Set aside on the plan of subdivision Reserves for the use of Ausnet Electricity Services Pty Ltd for electric substations.
(h) Provide survey plans for any electric substations required by Ausnet Electricity Services Pty Ltd and for associated power lines and cables and executes leases for a period of 30 years, at a nominal rental with a right to extend the lease for a further 30 years. Ausnet Electricity Services Pty Ltd requires that such leases are to be noted on the title by way of a caveat or a notification under Section 88 (2) of the Transfer of Land Act 1958 (Vic) prior to the registration of the plan of subdivision.
(i) Provide to Ausnet Electricity Services Pty Ltd a copy of the plan of subdivision submitted for certification that shows any amendments that have been required.
(j) Agree to provide alternative electricity supply to lot owners and/or each lot until such time as permanent supply is available to the development by Ausnet Electricity Services Pty Ltd. Individual generators must be provided at each supply point. The generator for temporary supply must be installed in such a manner as to comply with the Electricity Safety Act 1998 (Vic).
(k) Ensure that all necessary auditing is completed to the satisfaction of Ausnet Electricity Services Pty Ltd to allow the new network assets to be safely connected to the distribution network.
(a) The Plan of Subdivision for the first stage has not been certified under the Subdivision Act 1988 within 3 years of the issued date of this permit.
(b) All stages of the Plan of Subdivision have not been certified within 10 years of the issued date of this permit.
(c) The registration is not issued within 5 years of the date of certification of a particular stage of subdivision.
In accordance with section 69 of the Planning and Environment Act 1987, an application may be submitted to the responsible authority for an extension of the periods referred to in this condition.
[1] The submissions and evidence of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] The orange dashed line along the southern waterway corridor identifies GGE habitat. The brown/green dashed line along the east west waterway corridor identifies WBC habitat.
[3] A subdivision permit application for land to the west known as 82 Butlers Track was refused in 2023 and review of the decision by the Tribunal was not sought. Subdivision of land to the south is currently being considered by Council.
[4] See for example clauses 02.03-1, 11, 11.01-S, 11.01-1R, 11.01-1L-01, 11.01-1L-02, 11.02-1S, 11.02-2S, 11.02-3 and 11.03-2S.
[5] See for example clauses 12.01-1S, 12.01-1L, 12.01-2S, 12.03-1S, 14.02-1S, 15.01-1S, 15.01-4S, 18.02-2S.
[6] For example Bowen Park Pastoral Pty Ltd v Baw Baw SC [2020] VCAT 755, Bentley Lifestyle Developments Pty Ltd v Baw Baw SC [2022] VCAT 272 and Intrapac Ellarook Pty Ltd v Wyndham CC [2024] VCAT 499.
[7] I understand a subdivision application for 82 Butlers Track was refused and the refusal was not challenged in the Tribunal.
[8] Project reference RD-SW-06 in the Development Contributions Plan.
[10] I understand a referral of the subdivision to the Commonwealth under the EPBC Act has been made.
[11] The ESO4 is not applied on the site in the planning scheme as it is included in the incorporated PSP.
[12] According to Mr LeBel the native species Tall Spike-sedge forms this aquatic EVC. This EVC does not naturally occur in this area but does in the bio-region.
[13] As discussed elsewhere in these reasons additional WBC habitat may be impacted by interim drainage basins if the temporary access road is widened.
[14] According to Mr LeBel the native species Tall Spike-sedge, forming an 'artificial' aquatic EVC (Aquatic Herbland EVC653) that does not naturally occur in this area but does in the bio-region.
W 295 Pty Ltd atf 295 Unit Trust