[2015] NSWCATOD 92
NCAT Occupational
2015-04-14
Original judgment source is linked above.
Reasons for decision
Brief chronology
Material before the Tribunal at the hearing
Jurisdiction of the Tribunal
Issues for the Tribunal
The course of the hearing and the submission to the Tribunal of additional material
Consideration
17 CANBERRA ROAD SYLVANIA - medium density development 2 villas and 2 townhouses Reference by Mr Carmello Vescio for the period 3.3.99 - 3.10.99 Setting out & foundation work Second reference by Mr Carmello Vescio Supervise demolition, site set up, plumbing, electrical, formwork, steel fixing, concrete pumping and pouring/finishing, bricklaying, carpentry, machine operations to install structural steel beams & materials. RSR The Respondent's evidence is a memo of a phone attendance between the referee and an employee of the Respondent. The Respondent submitted "contrary to the referee statement, the Referee advised the Respondent on 29/08/14 that this site was not a site where Applicant gained experience of wide ranging building work. Taking this into account, along with the limited tasks the Applicant completed, the Respondent is of the view that the Applicant has not demonstrated wide range of the roles and responsibilities required of a builder at this site." Tribunal finding and reasons The phone note made no specific mention of this site and RSR discounted evidence of supervision of 8 trades. I find that the evidence before the Tribunal does not support the Respondent's submission and is not consistent with the referee's second reference. The Applicant also gave oral evidence of work on this site including supervising assisting and carrying out bricklaying and supervising other trades including concreting and carpentry. I find that the Applicant gained relevant experience for eight months.
88A COOK STREET FORESTVILLE (sometimes described as 80A Cook St) - new dwelling, swimming pool Reference by Mr Carmello Vescio for the period 19.1.00 - 30.6.00 Setting out & profiling Second reference by Mr Carmello Vechio Supervise excavation, bricklaying, concreting, plumbing, electrical, carpentry, concrete pumping and pouring, swimming pool; carried out staircase and floor concrete form-work, carpentry. The Respondent in RSR The Respondent's evidence is a memo of a phone attendance between the referee and an employee of the Respondent on 29/8/14. RSR submitted "contrary to the referee statement, the Referee advised the Respondent on 29/08/14 that this site was not a site where Applicant gained experience of wide ranging building work. Taking this into account, along with the limited tasks the Applicant completed, the Respondent is of the view that the Applicant has not demonstrated wide range of the roles and responsibilities required of a builder at this site." Tribunal finding and reasons The phone note made no specific mention of this site. I find that the evidence before the Tribunal of the Respondent's record of the phone call does not support this submission and is not consistent with the referee's certificate on 8/5/15. The Applicant also gave oral evidence of work on this site including supervising and carrying out work for a range of trades. I find that the Applicant gained relevant experience for 4.5 months.
64 GRAY STREET WOONONA - construction of four townhouses Reference by Mr Carmello Vescio for the period 2.2.98 - 30.6.98 Setting out, preparing foundations, steel placing Phone memo between the Respondent and Mr Carmello Vechio on 29.8.14 Site foreman and leading hand, liaised with client, supervised and directed subcontractors, planned day to day running of the site. On-site longer than four months in 98, job finished 99. The Applicant was on site the whole time. Supervised the site if builder not there, hands-on trade work, helped with carpentry, roof trusses, prepared site for council inspection before concreting, experience in structural stage. 10% supervising 90% trade work. Second reference by Mr Carmello Vechio Assisted with site setup, formwork, installing steel, supervised carpentry, bricklaying, plumbing, electrical, excavation works, floor tiling, carried out carpentry, plumbing, painting, scaffolding, granosite (?) application RSR Determine 4 months experience Tribunal finding and reasons I observe that notwithstanding the evidence and the 2013 Instrument the Respondent discounted the supervision experience of the Applicant. I find that the Applicant gained relevant experience for 5 months.
17C MORVEN ST GUILDFORD - building four townhouses Reference by Mr Carmello Vescio for the periods 10.6.97 - 28.12.97 & 28.2.98 - No details provided Phone memo between the Respondent and Mr Carmello Vechio on 29.8.14 Site foreman and leading hand, liaised with client, supervised and directed subcontractors, planned day to day running of the site. Supervise the site if builder not there and hands-on trade work helped with carpentry, roof trusses, prepared site for council inspection before concreting, experience in structural stage. 10% supervising 90% trade work. On site between 1995 and 1999 for approximately one third of time during that period. Second reference by Mr Carmello Vechio for the periods 10.6.97 - 28.12.97 & 28.2.98 - 25.12.98 Supervise excavation works, carpentry, bricklaying, roof tiling, carpet laying, painting, pest control, plumbing, carry out carpentry, damp proofing, prepare concrete slab, internal stair. The initial reference provides no details of any work by the Applicant on the site. The second reference states the Applicant supervised 11 distinct trades or areas of work. No mention of carrying out trade work himself. Oral evidence by the Applicant included that he assisted or carried out work in 10 trades / areas and observed fencing work. The Respondent submitted that the Applicant only 'assisted with setting out, ordering materials and carpentry". This submission as to limited work is not supported by the phone note or any other evidence before the Tribunal. I find the Applicant gained relevant experience in a wide range of building work from 10/6/97 to 28/12/97 at 2 days a week. This is 40% of 6.6 months = 2.6 months. Tribunal finding and reasons For the period 28/02/98 to 30/06/98 the Applicant cannot have been at the site full time if he was also at Gray St. The combined Gray St and Morven St sites involved full time work by the Applicant in a wide range of relevant work. I have credited this time in the Gray St work. For the period 01/07/98 - 25/12/98 I allow 1/3rd of 5.8 months = 1.9 months I find that the Applicant gained relevant experience for 4.5 months.
21 OAKVILLE STREET WILLOUGHBY (sometimes described at 17 Oakville St) - new dual occupancy Reference by Mr Carmello Vescio for the period 10.7.00 - 27.12.00 Setting out and site setup at 17 Oakville St Willoughby. Second reference by Mr Carmello Vescio. Work at 21 Oakville St Willoughby. Attached dual occupancy. Carry out site set up and set out. Supervise plumbing detention tank, concreting waffle pad system used installation of structural steel and on-site welding. RSR The Respondent's evidence is a memo of a phone attendance between the referee and an employee of the Respondent on 29/8/15. RSR submitted "contrary to the referee statement, the Referee advised the Respondent on 29/08/14 that this site was not a site where Applicant gained experience of wide ranging building work. Taking this into account, along with the limited tasks the Applicant completed, the Respondent is of the view that the Applicant has not demonstrated wide range of the roles and responsibilities required of a builder at this site." The phone memo made no specific mention of this site. Tribunal finding and reasons The Applicant gave oral evidence which was not challenged. His evidence included his involvement in preparation of steel off-site including painting beams and both assisting and supervising plumbers involved in easement works. This evidence assists in clarifying wording of the second reference and the very general wording of the initial reference namely "Setting out and site setup." However notwithstanding the clarification the evidence does not satisfy me on the balance of probability that the Applicant's work on this site involved a sufficiently wide range of building construction work I am not satisfied that the Applicant gained relevant experience on this site.
57 QUEEN STREET NORTH STRATHFIELD (sometimes described as 1 Queen St) - building 4 town-houses Reference by Mr Carmello Vescio for the period 1.7.98 - 30.11.98 Assist site set up & setting out Second Reference by Mr Carmello Vescio Employed full time. Note at Morven St for 1/3 of that period. Supervise D-9 excavated laser level operation works, carpentry formwork, concreting, plumbing, steel fixing, concrete pouring and pumping, assisted with site set up and setting out building temporary facilities. RSR The Respondent submitted "Working full time at other sites" and "Referee advised that this site was not one where Applicant gained experience of wind-ranging building work." The Respondent determined the Applicant gained no relevant experience. Tribunal finding and reasons Neither of the Respondent's above submissions are supported by the evidence. Mr Carmello Vechio's initial reference stated the Applicant was employed full-time during 1998. A phone note made by the Respondent on 29 August 2014 at page 40 in the s. 58 documents states that the referee said the Applicant was on Morven Street "approximately 1/3 of the time between 1995 to 1999". It is unclear as to the extent to whether that statement means one third of the time spread evenly between 1995 and 1999 or whether more time was worked at that site during part of that period and less time during another part of the period. I am of the opinion that it is reasonable to accept that the Applicant averaged 1/3 of 1995 - 1999 working at Morven St across the whole period. Accordingly as the evidence is that the Applicant worked full time for the referee in 1998 and as there is no evidence that any other work was carried out by the Applicant from1.7.98-30.11.98 I find that the Applicant worked on the site for 2/3 of the period, namely 2/3 of 5 months. I find that the Applicant gained relevant experience for 3.3 months.
2 caledonia street rose bay - major internal and external alterations and additions Reference by Mr Kendall for the period 8.1.10 - 12.12.10 Project manager electrical package including developing scope with client/builder/architect The Respondent's phone memo with Mr Kendall The Applicant is mainly an electrician and primarily carried out electrical work. Oral evidence of the Applicant The scope of work he developed was the scope of the whole job, not merely the electrical work. He took delivery of materials, carried out some management on the side, some electrical design work and some electrical and other building work. In cross-examination. He said the non-electrical building work was in the order of 15%-20% of the work he undertook. Second reference by Mr Kendall Work carried out - Alterations and additions - major internal and external modifications. Role of the Applicant Assisted with bricklaying plastering wet and dry, carpentry, tiling, delivery of materials, solid glass installation. Supervised roofing, dry and wet plastering, carpentry, plumbing, bricklaying, installation of fireplace. Carried out storage and delivery of materials, project manage the electrical scope with client / builder / architect / designer. RSR The Respondent stated in RSR that the Referee had provided further evidence in telephone conversations with the Respondent. "Please see Appendix 1 for details". I observe that no "phone note" of any further conversations were provided by the Respondent. In the appendix in relation to this site the role of the Applicant "taken from referee statements and conversations" was said to include assisting with bricklaying, plastering, carpentry, tiling, glass installation, supply of materials and floor heating; and supervision of roofing, plastering, carpentry, plumbing, reclaiming and installation of fireplace. The appendix goes on to state "main electrician - project manage the electrical scope of works with client and stakeholders"; "Applicant undertook roles and responsibilities of builder for 20% of time" and then in relation to "Experience gained" "11 months at 20% = 2.2 months" Tribunal finding and reasons I accept the Respondent's determination. I find that the Applicant worked on the site for a period of 11.2 months. I find that the majority of the work involved his electrical trade. I find that he carried out a wide range of building construction work for 20% of 11.2 months. I find that the Applicant gained relevant experience for 2.2 months.
49 GARDERE AVENUE CURL CURL (sometimes described as 49 Gardre St) - construction of new 2 storey dwelling Reference by Mr Kendall for the period 17.1.07 - 29.8.07 Employee as electrician then leading hand/supervisor/managed client expectation. The Respondent's phone memo with Mr Kendall 2.9.14 Job was takeover from another builder, finish steel frame home-cladding, tiling, kitchen, plumbing, electrical, hebal panel Double story dwelling with steel frames, the Applicant was involved in supervision 10% of the time but exposed to 50% of management duties while learning. Subcontracted for electrical work. Also involved in building work. Did not pay the applicant for building experience. The Applicant was still at early stages of gaining building experience. Interpreted plans and applied codes and legislation. Did not oversee structural principles. The Applicant's oral evidence He was paid for electrical work but not paid for general building work. Second reference by Mr Kendall The work involved the construction of new two story dwelling including a granny flat. The Applicant supervised plastering, painting, plumbing, carpentry, delivery of materials, assisted with carpentry, tiling, plumbing and wall panelling (hebel) carried out client consultation, steel frame construction, waste disposal RSR Applicant initially contracted as electrician then assisted with other roles including: cladding, tiling, carpentry, kitchen installation, plumbing, electrical, panelling, client consultation, waste disposal and steel frame construction. The Respondent submitted that there was relevant work of 4.2 months being seven months at 60%. Tribunal finding and reasons I have regard to the Applicants concession that he was not paid for the building work and the evidence that he did about 10% supervision and 50% of management. I accept the Respondent's submission that there was relevant work of 4.2 months.
31 LODGE STREET BALGOWLAH - replace part of roof, rebuild deck, replace doors, steps and railing, prepare for painting Reference by Mr Kendall for the period 9.10.8 - 15.12.8 All of replace roof, renovate deck, carpentry, electrical, plastering, joint effort The Respondent's phone memo with Mr Kendall 2.9.14 Non-structural renovation/refurbishment. The Applicant subcontracted for electrical and helped manage the trades on-site, coordinated painters, carpenters, quality control. Supervising about 30% of the time. Determine 2 months at 30% = 0.6 months Second reference by Mr Kendall The work involved replace existing roof, rebuild rear deck, replaced doors, steps and railing, plaster and prepare for paint. The Applicant coordinated subcontractors, carpenter, plaster, assisted with carpentry, roofing, carried out installation of insulation, bracing. Finding I find the Applicant gained experience in a wide range of relevant work including 0.7 month's supervision and 1.5 months' trade work during a period of 2.2 months on site. I have allowed half of the trade work time as the Applicant also carried out electrical work for which he was already licensed. I find that the Applicant gained relevant experience for 1.4 months.
53 POZIERES PARADE ALLAMBIE HEIGHTS (sometimes described as Manly) - installation of sliding door and 2 high sets of windows Reference by Mr Kendall for the period 6.7.08 - 30.07.14 All of cut out brickwork, install high light windows, finish off. The Respondent's phone memo with Mr Kendall 2.9.14 The Applicant's mother contracted Kendall for renovation work/refurbishment work - very small job. Job only went for a couple of weeks. Second reference by Mr Kendall The work involved installation of a sliding door on the lower floor on the eastern elevation and 2 high set windows on the lower floor on the southern elevation. The Applicant carried out inspection with council and structural engineer, oversaw structural principles. Carried out planning & building program. Remove brickwork, window and door carpentry of loadbearing walls, structural lintels steel and timber. Supervised and assisted with plastering, fit out carpentry & bricklaying. Tribunal finding and reasons I agree with the Respondent's determination in the appendix to RSR. I find that the Applicant gained relevant experience for 0.5 months.
Decision
Orders
Vescio
Commissioner for Fair Trading, Office of Finance and Services