[2012] VCAT 656
Victorian Civil and Administrative Tribunal
2012-05-18
Original judgment source is linked above.
Claire and Craig Longmuir, Mary Andric, Surrey Hills Progress Association Inc - Damien Gardiner, Justin & Melissa Begg and Phillipa Martin.
126-138 Union Road & 63 Sunbury Crescent, Surrey Hills, VIC 3127
Union Central Pty Ltd v Boroondara CC [2012] VCAT 656
in accordance with the endorsed plans provided for, and subject to the permit conditions set out in the annexure to this decision.
Mr John Cicero of Best Hooper Lawyers appeared on the first two hearing days. On the third hearing day Ms Sarah Raso of Best Hooper Lawyers appeared instead. During the first two hearing days, Mr Cicero called the following expert evidence:
There was a consensus that the author of the relevant photomontages (Chris Goss) was not required to appear.
Claire Longmuir, Cliff Williams on behalf of the Surrey Hills Progress Association Inc and Phillipa Martin.
Circulation of revised plans and Tribunal hearing commencing Monday 23 April 2012
Tribunal's findings - acceptability of proposed 4th level on building module oriented to Union Road
Tribunal's findings - will the proposal be an acceptable traffic and parking outcome?
(a) A notation confirming a maximum of 80 seats available to the public for the restaurant.
(b) Fully dimensioned and annotated internal-east and internal-west elevations. Any blank walls should be well articulated and treated broadly in the same manner as the outside walls. This must include further details of the proposed privacy screens on the internal-west elevation, fully dimensioned, at a scale of 1:20, including a section.
(c) An additional notation on the relevant architectural plan(s) indicating how the new clock on the south-east corner façade of the building will operate in practice.
(d) Further details of the proposed battened privacy screen, fully dimensioned, at a scale of 1:20, including a section.
(e) Deletion of the pedestrian bridge-link between the east and west cores of the building.
(f) Further details of security gate locations and treatments at the southern and eastern end of the open courtyard area between the two building modules, including "after hours" access by security card or like arrangement. The gates should have a contemporary open profile treatment, possibly in black rectangular iron bar configuration, to compliment the proposed architectural treatments to the satisfaction of the Responsible Authority.
(g) Any changes required by the approved Acoustic Report to be prepared pursuant to Condition 3 below.
(h) The internal layout of Dwellings 111 and 211 modified so as to minimise as far as practicable the reliance in the bedroom area on borrowed light.
(i) The dimensioned setback from the proposed awnings to the face of kerb.
(j) A door providing access between Shop 7 and the court yard/square.
(k) A door providing access between Office 4 and the court yard/square.
(l) Disabled access into the shops and offices from the court yard/square for those premises with direct access to the court yard/square, including details of ramp grades.
(m) In relation to the waste collection areas facing the laneway, a notation must be added on the relevant architectural plan(s) confirming that there must be no permanent storage of garbage bins in this collection area facing the laneway.
(n) Different treatment of the ground and basement levels of the western façade of the three level module such as brick, so as to add greater visual interest to same. This treatment should if practicable also incorporate graffiti-resistant finishes or materials.
(o) Any modifications necessary due to the requirements of the approved landscaping plan pursuant to Condition 13 below.
(p) The eastern wall of Office 3 to align with the title boundary on the ground, first and second floors (with the relevant ground floor external door to be inset appropriately so as to avoid opening into the footpath area).
(q) Any requirements or modifications recommended within the ESD report required by Condition 31 of this Permit.
(r) The revised internal configuration changes for the lift lobby areas, generally as shown in the Concept Plans (Drawing A12001-VC 104) marked up with "red clouds" which were tabled by the Applicant on the afternoon of 26 April 2012, being the final hearing day of the P63/2012 VCAT proceeding ("Concept Plans").
(s) The revised treatment of the vertical batten screen to the Croydon Road façade of the eastern four level building module, where the balconies have been reduced in size and project through this repositioned battened screen, generally as shown in the Concept Plans (Drawing A12001-VC 103), including the associated changes to the façade of this building and additional sun protection for the adjacent north-facing rooms.
(t) An additional notation shown on the eastern elevation plan, in relation to the period façade facing Union Road where the front upper verandah is being reinstated, to make it clearer what works are involved and how the modified front façade will then operate.
(u) The provision of a schedule of materials showing the proposed palette of materials and finishes (including samples of the proposed battened facade treatment and clock materials) selected for all sides of the building, generally in accordance with the revised Orbit architecture plans and the materials simples discussed at the 26 April 2012 VCAT P63/2012 hearing.
(v) The accessway, basement and sub-basement car park layout substantially in accordance with the Plans at Appendix B (Ref.: Job No. A12001, Drawings: A12001_VC221, A12001_VC231 and A12001_VC232, all Revision A, dated 4 April 2012, prepared by Orbit Architecture) of the Evidence prepared by Jason Walsh, Traffix Group, dated 5 April 2012 with the following further changes:
- (i) modifications as necessary to satisfy the requirements of Melbourne Water;
- (ii) a 1.0m extension to the blind aisle to allow vehicles to exit the end bays (spaces #70 and #85) to the satisfaction of the Responsible Authority. It is recommended that the width of parking spaces #69, 70, 84 and 85 be amended to 2.6m, to allow a 0.8m extension to the blind aisle;
- (iii) the 24 proposed customer/visitor car spaces to be located within the Basement Level to the satisfaction of the Responsible Authority;
- (iv) the capacity of the stormwater tank/s and a notation that rainwater harvested on the site will be reused for the retail/commercial toilets and for irrigation of the planter boxes located on the ground floor;
- (v) the location of the relocated street electrical pole to the satisfaction of the Responsible Authority;
- (vi) the dimensioned width of the vehicle crossing to Sunbury Crescent;
- (vii) the provision of six (6) bicycle parking spaces for use by employees and visitors, within the ground floor courtyard/square, in addition to the 19 spaces provided within the basement;
- (viii) the provision of one (1) shower and change room for the use of shop, restaurant and office employees;
- (ix) a notation that redundant crossovers will be reinstated with footpath, kerb and channel to the satisfaction of the Responsible Authority;
- (x) further details of any device/s to control access to the basement car park, including garage doors and intercom systems to the satisfaction of the Responsible Authority.
Layout of Buildings and Uses not to be Altered/Maintenance of Buildings and Works
(b) All buildings and works must be maintained in good order and appearance to the satisfaction of the Responsible Authority.
(b) Before any plans are endorsed pursuant to Condition 1 hereof, an acoustic report prepared by a suitably qualified acoustic engineer must be submitted to and approved by the Responsible Authority. The report must prescribe the form of acoustic treatment to:
(c) Within two months of all of the permitted uses commencing, an updated acoustic report prepared by a suitably qualified acoustic consultant must be submitted to the satisfaction of the Responsible Authority demonstrating that the required level of noise attenuation has been achieved in accordance with condition 3(b) of this permit or, if not, what works must be undertaken to achieve the required levels of noise attenuation. If all of the relevant uses have not commenced by the date being 12 months after the commencement of the initial use, then an interim updated acoustic report must be prepared in the same manner as required in the preceding sentence. For the removal of any doubt, the preparation of any such interim updated acoustic report will not (unless the Responsible Authority agrees otherwise in writing) change the obligation that an updated acoustic report must be prepared once all of the permitted uses have commenced.
(d) The recommendations contained in the approved acoustic report or reports (as applicable) pursuant to Condition 3(b) and (c) must be implemented and completed and where the recommendations are of an ongoing nature, must be implemented and maintained, all to the satisfaction of the Responsible Authority.
These numbers may only be varied with the prior written approval and to the satisfaction of the Responsible Authority.
(d) paving, retaining walls and other landscape works including areas of cut and fill and finished site levels;
(e) the soil depth of planter boxes;
(f) the use of drought-tolerant plant species; and
(g) irrigation of the court yard/square planter boxes using rainwater harvested on-site;
must be submitted to the satisfaction of the Responsible Authority. When the landscape plan is to the satisfaction of the Responsible Authority it will be endorsed and will form part of this Permit.
(b) In relation to the waste collection area facing the laneway, there must be no permanent storage of garbage bins in this collection area.
These works must be carried out in accordance with the works plan approved by the Environmental Auditor engaged by the owner. A copy of the works plan must be provided to the Responsible Authority before the commencement of the buildings and works for the purposes of this condition.
Driveways and Car Parking areas to be constructed
Hours for deliveries and loading/unloading (restaurant and shop premises)
Saturday, Sunday & Public Holidays: 9:00am to 5:00pm
to the satisfaction of the Responsible Authority. Newspaper deliveries may take place outside these hours.
The Responsible Authority may extend the times referred to if a request is made in writing before the Permit expires or within the three (3) months afterwards.
[1] See Richmond Icon Pty Ltd v Yarra CC (Red dot) [2011] VCAT 2175
Union Central Pty Ltd