[2025] VCAT 267
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-04-03
Original judgment source is linked above.
23 Kingston Avenue ASCOT VALE VIC 3032 and the Maribyrnong River adjacent to 23 Kingston Avenue, Ascot Vale
THE FOLLOWING SHOULD BE ADDED TO WHAT THE PERMIT ALLOWS ON THE EXISTING PERMIT:
Clause 43.02-2 and section 2.0 of schedule 2 to clause 43.02 Design and Development Overlay (DDO2)
Clause 42.03-2 and section 3.0 of schedule 4 to clause 42.03 Significant Landscape Overlay
(a) Any requirements of Melbourne Water (Conditions 5 - 12).
(b) The front facade to incorporate the use of contemporary design features as additional articulation across each level of the lift shaft.
(c) Any retaining walls/fencing along the south-eastern boundary from the building line to Kingston Avenue to be a maximum of 1.2 metres in height, with the remainder of the fence height/retaining wall shown as 1.8 metres. A new gate must be provided where the 1.8 metre high wall/fence starts to secure the rear yard of the dwelling (similar to the gate shown on north-western side).
(d) Details of any retaining walls on the elevation plans.
(e) A schedule of all external material and finishes. The schedule must show the material, colour (including colour samples) and finishes of all external walls, roof, fascias, windows frames, fences and paving.
Once approved these plans become the endorsed plans of this permit.
(a) Silt fencing
(b) Spoil stockpiling
(c) Machinery/Plant Location
(d) Access tracks
(a) Plans to accord with Condition 1 of this permit.
(b) The planting required is to be in accordance with the species list of the Maribyrnong River Interface Urban Design Guidelines 1991, Appendix 1.
(c) The provision of landscaping to the satisfaction of Melbourne Water for the interface with the Maribyrnong River.
(d) A planting schedule of all proposed vegetation (trees, shrubs and ground covers) which includes, botanical names, common names, pot size, mature size and total quantities of each plant.
(e) The use of drought tolerant species.
(f) Features such as paths, paving and accessways.
(g) The provision of at least one canopy tree within the front setback, which are able to achieve a minimum mature height of 4 metres.
Once approved these plans become the endorsed plans of this permit. Landscaping in accordance with this approved plan and schedule shall be completed before the building is occupied. After completion of the landscaping it must be maintained in good order to the satisfaction of the Responsible Authority.
(a) The terms on which the owner is authorised to use the pontoon on the land including that the owner:
- must maintain and repair the pontoon, at its own cost;
- must ensure that the pontoon at all times complies with all laws, permits, and approvals;
- assumes full responsibility for all risk associated with the pontoon and indemnifies and releases Council from any risk in respect of the construction and use of, or damage to, the pontoon; and
- if the pontoon is damaged or destroyed to the extent that it can no longer be used, the owner must not rebuild or replace the pontoon.
(b) Within 30 days after Council issues a Notice of Intent to Acquire the part of the land affected by the public acquisition overlay (PAO2), the owner must:
- remove the pontoon (and any support structures) from the property, at the owner's full cost;
- reinstate the land to the satisfaction of Council.
(c) In the event that the owner fails to remove the pontoon and support structures or fails to reinstate the land to the satisfaction of Council within 30 days after Council issues a Notice of Intent to Acquire the affected land, Council may remove the pontoon and support structures and reinstate the land at the Owner's cost.
(d) That the Owner must not make any claim against Council for compensation, reimbursement or any other payment in connection with or arising from the grant of the amended permit, the Section 173 Agreement or the removal of the pontoon under condition 16(b) (whether under the Planning and Environment Act 1987 (Vic), the Land Acquisition and Compensation Act 1986 (Vic), the Local Government Act 2020 (Vic) or any other law).
The owner must cover all costs relating to the preparation and registration of the agreement (including costs incurred by the Responsible Authority). The Section 173 Agreement must be registered in accordance with the provisions of Section 181 of the Planning and Environment Act 1987 (Vic).
(a) the development does not start within two (2) years of the date of issue of this permit, or
(b) the development is not completed within four (4) years of the date of issue of this permit.
Before the permit expires or within three (3) months afterwards the owner or occupier of the land may in writing request the Responsible Authority to extend the expiry date.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] Pursuant to Section 61(2) of the Planning and Environment Act 1987 (Vic), the responsible authority must now refuse to grant an amended planning permit.
[3] Ground of refusal #4 refers to 'works' however section 3 of the Planning and Environment Act 1987 (Vic) specifies that the definition of building includes, amongst other things, a boat or pontoon which is permanently moored or fixed to land.
[4] [2004] VCAT 927 at [13] to [29].
[5] Lofts Quarries v Kingston City Council & Ors (1997/56470; 1997/80103).
[10] McCarthy v Glen Eira CC [2004] VCAT 927 at [16] and Lewenbery v City of Stonnington (1997/88586).
[13] McCarthy v Glen Eira CC [2004] VCAT 927 at [28].
[14] I note that no party provided any evidence or documentation that address potential impact that pontoon will have upon land valuation.
[15] Council particularly relies upon policy within the Design and Development Overlay (Schedule 2), Significant Landscape Overlay (Schedule 4) and clause 12.03-1S.