[2025] VCAT 647
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-07-21
Original judgment source is linked above.
Section 77 of the Planning & Environment Act 1987 (Vic); Yarra Ranges Planning Scheme; Construct an outbuilding - Neighbourhood character (DDO5; SLO22)
Tull v Yarra Ranges SC [2025] VCAT 647
Construct a building or construct or carry out works.
Application under Section 77 of the Planning and Environment Act 1987 (Vic) - to review the decision to refuse to grant a permit.
Clause 32.09 - Neighbourhood Residential Zone, Schedule 3 (NRZ3).
Clause 42.03 - Significant Landscape Overlay, Schedule 22 (SLO22).
Clause 43.02 - Design and Development Overlay, Schedule 5 (DDO5).
Clause 43.02-2 - Construct a building or construct or carry out works.
Includes Clauses 02.03, 15, 42.03, 43.02, 65 and 71.02.
The subject site is an irregular shaped allotment located on the southern side of John Street and is currently developed with a single dwelling. The subject site has a frontage of 38.08 metres, a maximum depth of 32.87 metres, and a total site area of 902m2.
Does the proposed outbuilding result in an acceptable planning outcome?
To provide a planning framework to guide limited residential development and subdivision.
To protect the special features and unique character of these areas from increased dwellings.
To ensure development is at a scale consistent with the unique character of the foothills and rural townships and enhances neighbourhood character as defined in the associated Significant Landscape Overlay [in this case the SLO22].
Construct a building or construct or carry out works.
(a) An elevation plan with the following details
- north, south, east and west elevations (four compass directions)
- overall height (from natural ground level to the top of the roof)
- Site plan must be amended to illustrate the correct measurement of the plans and also include a development summary.
(a) Transportation of materials, goods or commodities to or from the land.
(b) Appearance of any building, works or materials.
(c) Emission of noise, artificial light, smell, fumes, smoke, vapour, steam, soot, ash, dust, water, waste products, grit or oil.
(d) Presence of vermin.
(a) The development is not started within two years of the date of this permit, or
(b) The development is not completed within four years of the date of this permit.
The responsible authority may extend the periods referred to if a request is made in writing before the permit expires, or within six months of expiry of permit of the commencement date.
An extension of time to complete the development or a stage of the development may be requested if:
[1] I have considered the submissions of all the parties, including all the exhibits tendered by the parties, and the statement of grounds. In accordance with the practice of the Tribunal, I do not recite or refer to all of the contents of those documents in these reasons.
Tull
Yarra Ranges SC [2025] VCAT 647