Trewern v Transitional Coastal Panel
[2018] NSWLEC 1682
At a glance
Source factsCourt
Land and Environment Court (NSW)
Decision date
2018-12-21
Catchwords
- DEVELOPMENT APPLICATION: repair and maintenance of existing rock wall
- conciliation conference
- agreement between the parties
Source
Original judgment source is linked above.
Catchwords
Judgment (5 paragraphs)
This decision was given as an extemporaneous decision at 3pm on 21 December 2018. It has been revised and edited prior to publication.
- COMMISSIONER: This Class 1 appeal concerns a development application (DA) brought before the Court under s 8.7 of the Environmental Planning and Assessment Act 1979 (EPA Act) against the respondent's deemed refusal to undertake repairs to the existing seawall located within the Council Road Reserve immediately seaward of the private property at Lot 2 in DP862599 being 40 Childe Street, Byron Bay, (the site).
- The proceedings were referred to a conciliation conference under s 34(1) of the Land and Environment Court Act 1979 (LEC Act) between the parties, which was held on 17, 18, 19 and 21 December 2018. I presided over the conciliation conference which was held in Sydney.
- At the conciliation conference, the parties reached agreement as to the terms of a decision in the proceedings that would be acceptable to the parties. This decision involved the Court upholding the appeal and granting conditional development consent to the development application. A signed agreement prepared in accordance with s 34(10) of the LEC Act which comprised several Appendix was filed with the Court on 21 December 2018 (s34 Agreement).
- In general terms, the agreement approves the restacking of existing rock with the importation of additional rock of a certain size and quantity to restore the face of the existing sea wall (Applications Summary Table at Appendix 3 of s34 Agreement and reproduced below). Nature of the Works Section Plans Repair Works Plans Rock Size Quantity of Rocks Proposed access BSR-CS2-UW-004A Restacking of existing rock with importation of additional rock to restore the face to design profile above sand level. Repair works above +1 to about +4m AHD BSR-CS2-UW-003A BSR-CS2-UW-006A 1.5-5T 24 tonnes From beach BSR-CS2-UW-005A Construction Plan: (2 x 12t trucks) BSR-CS2-UW-007E