austlii:qld/QBCCMCmr/2025/326
General information, not legal advice.
QBCCMCmr
2025-09-26
Original judgment source is linked above.
The Body Corporate for Torwyn on Cracknell (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), and (3)(a)
Whether the body corporate should be prevented from carrying out the work while the application is decided.
Act, ss 94(1)(a)&(2), 279; Standard Module, ss 173, 180(1); Land Title Act 1994, s 48C(1).
...that the ground subsidence, particularly to the right side of Unit 6 has been influenced by insufficient / incomplete initial backfilling, particularly under the balcony as well as subsequent fill settlement / consolidation and possible poor drainage and plumbing leaks defects / breaks.
...that a plumber and electrician are engaged (as above) to inspect and rectify defects as required. Following this, the area can be refilled (including the areas under the sections of the unit projecting past the building line below), to include suitable surface profiling to direct surface water away from and around the building / towards drainage pits etc...
...engage R & M Monteverde Pty Ltd to undertake repair works to the backyard of lot 6 for a sum of up to $15,000.00 including GST.
1. The lot owner is seeking that the body corporate undertake maintenance, and repair works within the exclusive use area to rectify damage caused by a broken roof and stormwater drainage issues around the balcony and building edges. Upon completion of the body corporate works, the lot owner also requests that the consulting engineer provide written confirmation - based on the findings and outcomes of their original inspection report - that all identified drainage issues have been resolved**.**
2. The lot owner is seeking the body corporate undertakes maintenance / repair of the protruding drainage inspection pipes, which have been identified as a safety hazard impacting the occupier. The protruding state of the drainage pipe is a result of damaged cause by body corporate broken drainage and building defects. These pipes are located on the exclusive use area of the owner's lot.
3. The lot owner is seeking that Motion 10, titled "Lot 6 Backyard Works - Monteverde," from the Minutes of the Annual General Meeting ... be invalidated and declared void.
4. The lot owner is seeking that the body corporate reimburses the lot owner to the sum of $790.10 which is the cost incurred in justifying the lot owner's maintenance request and pursing the matter with the office of the body corporate commissioner.
- Independent Building Surveyor engaged to assessing the safety issues identified by the lot owner - $440
- Body corporate dispute resolution Conciliation - $110.30
- Body corporate dispute resolution - Adjudication $239.80.
...to suspend the commencement of proposed works by the body corporate - specifically those to be undertaken by RM Montverde on the boundary and exclusive use area of Lot 6 - until the adjudicator has made a final decision.
(a) the amount last set as the relevant limit for major spending by ordinary resolution of the body corporate at a general meeting; or
(b) at any time there is no amount set, the lesser of the following amounts -
(i) an amount worked out by multiplying $1,100 by -
(A) for a principal scheme in a layered arrangement of community titles schemes - the number of layered lots for the scheme; or
(B) for another scheme - the number of lots included in the scheme;
The Torwyn major spending limit is the standard $1,100 per lot = $23,100.00.
[3] Act, s 94(1)(a); Standard Module, s 180(1).
[4] Keith Hart, Building Investigator, email of 4 August 2025.
[5] Grace Tuffery email to applicant of 8 August 2025.
[8] Standard Module, Schedule 1, "relevant limit for major spending".