austlii:qld/QBCCMCmr/2025/177
General information, not legal advice.
QBCCMCmr
2025-05-29
Original judgment source is linked above.
The Body Corporate for Top of the Mark (respondent)
Body Corporate and Community Management Act 1997 (Qld) (Act), sections 227 and (3)(a)
FAILURE TO MAINTAIN COMMON PROPERTY - LIABILITY FOR CONSEQUENTIAL DAMAGE TO LOTS
MAINTENANCE / IMPROVEMENTS - whether repair works to common property constitute "improvements" or "maintenance".
Building Act 1975 & Standard By-Laws
Ridis v Strata Plan 10308 [2005] NSWCA 246
The Moroccan [2006] QBCCMCmr 729
MAGOG (NO 15) P/ L v Body Corporate for the Moroccan [2010] QDC 70
The Presidents Lodge [2018] QBCCMCmr 226
Morcom and Ors v Campbell-Johnson and Ors [1955] 3 All ER 264
No 9 Port Douglas Road [2006] QBCCMCmr 674
Klinger v Body Corporate for Costa D'Ora Apartments [2007] QDC 300
Oceans Mooloolaba [2019] QBCCMCmr 293
Stella Grande [2017] QBCCMCmr 556
I HEREBY CERTIFY this is a true copy of the order and reasons for decision.
Within 6 months of the date of this order, the Respondent is to perform their statutory duties under section 152(1)(b) of the Act and comply with their imposed obligations with regard to the common property under sections 180(1), 180(2)(a)(ii),(iii) and 180(2)(b) of the Standard Module by carrying out the rectification works and structural repairs to the damaged common property affecting Lot 100, by:
(i) the structural and roofing issues identified in the CRG Report, pursuant to the rectification works as recommended by CRG in the CRG, and
(ii) the roofing issues identified in the RR Report (as concurred by CRG), pursuant to the rectification works as recommended by RR in the RR Report
(b) Co-ordinating the carrying out of the structural rectification works with the Applicant, the Applicant's engineer (CRG) and other lot owners who are affected by the rectification works to the common property, and at such time that the Respondent perceives that the rectification works are complete:
(i) the Respondent must arrange an inspection with CRG to observe the completed rectification works, for the purposes of assessing any further issues that may prevent the commencement of the internal rectification works to Lot 100; and
(ii) in the event that after the inspection, CRG provide further recommendations that contest the completion of the structural and roofing rectification works to the common property affecting Lot 100, the Applicant and the Respondent must:
A. engage an independent engineer for the purposes of providing an independent report; and
B. pay the costs of obtaining the independent engineer's report, on an equal basis.
Pursuant to Sections 281(1)(a) and 152(1)(b) of the Act, within 6 months of the date of this order, the Respondent is to engage an appropriately qualified professional to carry out the internal repairs to Lot 100, identified in the 6 January 2025 Reflex Property Services (RPS) Quotation numbered 3067 (the estimated fees are $32,092.00 (inclusive of GST)) and such repairs shall be at the cost of the Respondent .
I declare that Applicant is not in contravention of section 160 of the Act and section 211 of the Standard Module.
I HEREBY CERTIFY this is a true copy of the order and reasons for decision.
A final order that, pursuant to section 276(1)(b) of the Body Corporate and Community
Management Act 1997 (Qld) (Act), the Respondent be ordered to perform their statutory
duties under section 152(1)(b) of the Act and comply with their imposed obligations with
regard to the common property under sections 180(1), 180(2)(a)(ii),(iii) and 180(2)(b) of
by immediately carrying out the rectification works and structural repairs to the damaged common property affecting Lot 100, by:
(i) the structural and roofing issues identified in the CRG Report, pursuant to the rectification works as recommended by CRG in the CRG Report;
(ii) the roofing issues identified in the RR Report (as concurred by CRG), pursuant to the rectification works as recommended by RR in the RR Report;
(b) Co-ordinating the carrying out of the structural rectification works with the Applicant, the Applicant's engineer (CRG) and all other relevant stakeholders for which are affected by the rectification works to the common property, and at such time that the Respondent perceives that the rectification works are complete:
(i) the Respondent must arrange an inspection with CRG to observe the completed rectification works, for the purposes of assessing any further issues that may prevent the commencement of the internal rectification works to Lot 100; and
(ii) in the event that after the inspection, CRG provide further recommendations that contest the completion of the structural and roofing rectification works to the common property affecting Lot 100, the Applicant and the Respondent must:
A. engage an independent engineer for the purposes of providing an independent report; and
B. pay the costs of obtaining the independent engineer's report, on an equal basis;
(iii) in the event that CRG assess that the rectification works to the common property, has caused property damage to the internal elements of Lot 100 to an extent that is greater than the current internal damage to Lot 100 (as dealt with in Order 2 below), or:
A. is associated with the existing defective roof structure or the result of the structural rectifications; or
B. is a consequence of further delays in the Respondent carrying out the structural rectifications to the common property affecting Lot 100, the Respondent is ordered to make good the further property damage caused to the internal elements of Lot 100, at the Respondent's costs, pursuant to Section 281(1)(a) of the Act.
A final order that, pursuant to Section 281(1)(a) of the Act, given the Respondent's strict statutory duties as set out under section 152(1)(b) of the Act, the Respondent be ordered, at the Respondent's costs, to engage an appropriately qualified professional to carry out the internal repairs to Lot 100, identified in the 6 January 2025 Reflex Property Services (RPS) Quotation numbered 3067 (the estimated fees are $32,092.00 (inclusive
A declaratory order that, by virtue of the Respondent's contravention of section 152(1)(b) of the Act as stated in Order 1, the Applicant is not in contravention of section 160 of the Act and section 211 of the Regulation.
(a) Cozens Regan Group (CRG), the structural engineer engaged by the Applicant
(b) contractors and/or service providers engaged by the Body Corporate, including:
(i) insurer's claim adjuster, Crawford & Company (C&C);
(iv) structural engineer, Structural Diagnostics (SD); and
(v) body corporate's preferred builder, Down Under Constructions (DUC)
(a) the history of the dispute;
(b) the respective engineer reports and rectification works quotations;
(c) the legal liability of the Body Corporate to carry out the rectification works;
(d) the loss and damage sustained by the owners of the Units;
(e) the appropriate steps for the Body Corporate to mitigate further losses;
(f) their intention to commence proceedings if the resolution of all matters was not forthcoming.
(a) the Body Corporate was on notice of the potential rental abatement claim they may bring against the Body Corporate;
(b) the Body Corporate was on notice that they were willing to commence proceedings against the Body Corporate.
(c) by virtue of the BCM advising that the Body Corporate was "gearing up to carry out the roof repairs" and other statements to that effect, all of the Units have been vacant since March 2024 (with Unit 510 being vacant and unfit for habitation since December 2020);
(d) throughout 2020 to date, they have sought to resolve the issues in dispute internally with the Body Corporate but to no avail.
(a) failed to meet the demands sought by them in relation to the loss of rent claims;
(b) not undertaken any rectification works to the external roof or the roof cavity structure, which has contributed to the gravity of the Leaks and associated damage;
(c) by virtue of the inherent delays in addressing the damaged common property, prevented the internal repairs to the Units from being completed, which has directly increased the losses and damages claimable by the owners of the Units.
(a) Water damaged and mouldy plasterboard walls and ceilings
(b) Collapsed balcony ceiling- Villaboard lining missing
(c) Water stained/ mouldy carpet in lounge
(d) Other stained carpets
On 27 August 2020 the Applicant reported the Leaks to the Body Corporate and provided a detailed report including photographs.
On 08/12/2020 the tenants of Unit 510 vacated due the inhabitable condition of the Lot and on 10/12/2020 their letting agent advised the Body Corporate of the unhabitable condition of Unit 510.
On 14/12/2020 a storm cause further damage to the roof structure and balconies of the Units.
On 11/01/2021 C&C (the Insurance Loss Adjuster) inspected the further damage caused to the roof structure in Unit 511, stating that "the ceiling of the unit was about to collapse".
On 13/01/2021 their letting agent sent an email to C&C, who engaged JLG to inspect the property damage to the Units.
On 4/01/2021 their letting agent sent an email to C&C and the BCM, wherein the unhabitable condition of the Units was raised.
On 5/01/2021 C&C arranged JLG to make temporary 'make safe' repairs for Unit 511, using props and temporary support beams.
On 0/01/2021 their letting agent sent an email to C&C, confirming that Unit 510 was uninhabitable as a result of the Leaks.
On 9/01/2021 their letting agent sent an email to the BCM, stating:
the Building Manager and yourselves were made aware of the Leaks on 27/08/2020 and nothing has be addressed."
"unit 510 is un-rentable in the current state... an applicant pulled out after the storm caused the ceilings to collapse"
"these issues need to be dealt with in a timely manner and clear communications moving forward from all parties to mitigate the Owners losses.
On 8/01/2024 The BCM responded to the above email outlining that the Body Corporate's roofing contractor had been onsite investigating the cause of the water ingress. 546 - 547
On 2/01/2024 The BCM advised that the Body Corporate is committed to rectifying the works. The Owners point out that the Body Corporate has not confirmed that they will rectify the outstanding damage to the Units nor cover the loss of rent claims.
On 9/02/2024 their letting agent sent an email to the BCM, advising:
after our meeting with Justin from Tender Guide Consultants and Darrick from Amalgamated at the 509, 510 and 511 properties the seriousness of the scope of works required by the Body Corporate and Committee at the building and the fact that we can no longer guarantee the safety and well being of the tenants residing at units 509 and 511, the owner Mr Mir has had to give both apartments tenants Notice to Leave for non-liveability.
On 12/06/2024 their letting agent sent an email to the BCM, advising that the tenants in Unit 509 vacated on 11/03/2024, and the tenants in Unit 511 vacated on 16/03/2024.
On 15 August 2024 a Budget Committee Meeting was held, the minutes of which included the following:
The Committee held considerable discussion on the ongoing repairs required to the eastern townhouses. It was noted that Justin Percy from TenderGuide Consultants has been engaged to project manage the repairs and liaise with all stakeholders. It was noted that Amalgamated Group who has been engaged to carry out the previously approved roof beam repairs has also been requested to provide fee proposals on the additional repairs required by the Body Corporate. This includes the replacement of the box gutter along the eastern townhouse roof as well as spalling repairs to the external building façade which can be completed whilst access is available.
RESOLVED THAT the Committee authorise an expenditure of up to $200,000.00 plus GST to carry out repairs to common property, structural components of a lot and utility infrastructure.
The Committee discussed the internal damage repairs to Lots 99-102 (Units 508-511) and felt it was prudent for the owners to carry out the repairs to their unit using their preferred tradespeople and seek indemnification from the Body Corporate which has been the process adopted by this Body Corporate in similar issues that have occurred in the past.
RESOLVED THAT the Body Corporate Committee make a cash settlement offer to the owners of Lots 99- 102 (Units 508-511) for resultant damage to their lot as follows:
AND FURTHER THAT the Body Corporate Manager be instructed to present these offers to the respective lot owners and/or their representatives.
(a) Report from Structural Dynamics dated 9 July 2021, obtained by the body corporate
(b) Report from Roof Response (RR Report) dated 5 October 2021, obtained by Johns Lyng
(c) Quote from insurer's builder, Johns Lyng Group (JLG) engaged by the insurer to quote on repairs.
(d) Quote from Amalgamated Group Property Maintenance dated 22 February 2022, obtained by Body Corporate re steel refurbishment rectification works, following inspection & review of Structural Diagnostic Report.
(e) Report from Cozens Regan Group Pty Ltd re structural adequacy of the building, collapsed ceilings and structural integrity of the roof structure.
(f) Quote from Down Under Constructions dated 25 February 2022, obtained by the body corporate
(g) Quote from Reflex Property Services to applicant dated 6 January 2025
(h) Report from Edge Consulting Engineers dated March 2025.
(a) the Respondent has not undertaken any rectification works to the external roof or the roof cavity structure, which has contributed to the gravity of the Leaks and associated damage;
(b) by virtue of the inherent delays in addressing the damaged common property, prevented the internal repairs to the Units from being completed, which has directly increased the losses and damages claimable by the owners of the Units.
(a) successive storm events have enlarged the scope of work.
(b) the difficulty of obtaining quotations in the current construction market.
(c) the Applicant demanding expanded scopes of work for his three Lots, where responsibility was either the applicant's, or was unclear.
(a) the internal ceiling suspension system;
(b) the balcony ceilings; and
(c) changing the roof pitch.
(a) the first storm event occurred in August 2020 (First Storm Event). The respondent says the first report of damage to the Three Lots seems to have been when water leaks occurred during the storm event of August 2020. It notes that a quote was received from Vaun Management on 18 November 2020[2] to fix shows water damaged ceilings & repaint the ceilings in 4 lots. Attached were three photographs of water damaged ceiling and peeling paint.
(b) The second storm event occurred on 13 December 2020. The problems that arose from this event included that the ceiling had dropped in some of the Three Lots and water had pooled on their balconies.
(c) The third storm event occurred on 28 February 2022, after which Unit 509 (Lot 100) was reported to have a water leak. The respondent says Unit 510 (Lot 101) remained dry, and Unit 511 (Lot 102) was not inspected because the tenants denied access.
(d) The fourth storm event occurred on 15 February 2024 . The respondent says it is unclear whether this caused any further damage.
Ceiling collapsing with timber props holding up ceiling
Temporary plywood balcony ceiling water damaged mouldy
Lounge carpet soaked & needs to be removed due to mould
Lounge carpet soaked & needs to be removed due to mould
Drain blocked on balcony causing water to back up into unit
Drain blocked on balcony causing water to back up into unit
An adjudicator to whom the application is referred may make an order that is just and
equitable in the circumstances (including a declaratory order) to resolve a dispute, in
(a) a claimed or anticipated contravention of this Act or the community
(b) the exercise of rights or powers, or the performance of duties, under this Act or
That the Respondent be ordered to perform their statutory duties under section 180 of
(i) the structural and roofing issues as recommended by CRG in the CRG Report;
(ii) the roofing issues identified in the RR Report (as concurred by CRG),
That, pursuant to Section 281(1)(a) of the Act, the Respondent be ordered to carry out the internal repairs to Lot 100, identified in the 6 January 2025 Reflex Property Services (RPS) Quotation numbered 3067 (estimated at $32,092.00 (inc GST)).
(a) Water damaged, peeling and mouldy paintwork on ceilings
(b) Water damaged plasterboard ceilings and walls
(c) Collapsed balcony ceiling- Villaboard lining missing
(d) Water stained/ mouldy carpet
(e) Debris on balcony
(a) Water damaged plasterboard ceilings and walls
(b) Water damaged, peeling and mouldy paintwork on interior ceilings
(c) Collapsing internal ceilings
(d) Collapsed balcony ceiling- Villaboard lining missing
(e) Debris on balcony
(a) Water damaged, peeling and mouldy paintwork on ceilings
(b) Damaged plasterboard ceilings and walls
(c) Collapsing ceilings that are being held in place with acrow props
(d) Collapsed balcony ceiling- Villaboard lining missing
(e) Debris on balcony
Was Damage Attributable to Failure to Maintain Common Property?
180 Duties of body corporate about common property
(1) The body corporate must maintain common property in good condition, including, to the extent that common property is structure in nature, in a structurally sound condition.
(2) To the extent that lots included in the community titles scheme are created under a building format plan of subdivision, the body corporate must-
(i) railings, parapets and balustrades on (whether precisely, or
for all practical purposes) the boundary of a lot and common property; and
(ii) doors, windows and associated fittings situated in a boundary wall separating a lot from common property; and
(iii) roofing membranes that are not common property but that provide protection for lots or common property; and
(b) maintain the following elements of scheme land that are not common property in a structurally sound condition-
(iii) essential supporting framework, including load-bearing walls.
(4) To avoid doubt, it is declared that, despite an obligation the body corporate may have under subsection (2) to maintain a part of a lot in good condition or in a structurally sound condition, the body corporate is not prevented from recovering an amount of damages from a person (whether or not the owner of the lot) whose actions cause or contribute to damage or deterioration of the part of the lot.
maintenance before it falls out of condition, in a state which enables it to serve the purpose for which it exists.[8] Therefore the body corporate is obliged not only to attend to cases where there is a malfunction, but also to take preventative measures to ensure that there not be a malfunction.[9] The duty extends to require remediation of defects in the original construction.
(a) Report from Structural Dynamics dated 9 July 2021, obtained by the body corporate
(b) Report from Roof Response (RR Report) dated 5 October 2021, obtained by Johns Lyng
(c) Quote from insurer's builder, Johns Lyng Group (JLG) engaged by the insurer to quote on repairs.
(d) Quote from Amalgamated Group Property Maintenance dated 22 February 2022, obtained by Body Corporate re steel refurbishment rectification works, following inspection & review of Structural Diagnostic Report.
(e) Report from Cozens Regan Group Pty Ltd re structural adequacy of the building, collapsed ceilings and structural integrity of the roof structure.
(f) Quote from Down Under Constructions dated 25 February 2022, obtained by the body corporate
(g) Report from Edge Consulting Engineers dated March 2025.
(h) Quote from Reflex Property Services to applicant dated 6 January 2025
Structural Dynamics Report (SD Report) obtained by the body corporate
Report from Roof Response (RR) dated 5 October 2021, obtained by Johns Lyng
(a) the roof pitch is insufficient in certain areas,
(b) insufficient and inadequately fixed flashing
(c) poor joins
(d) deteriorated seals, and
(e) areas of rust and corrosion.
Johns Lyng Group - scope of work / tender dated 27 October 2021
(a) Remove and replace roof sheeting - 0.42bmt Kliplok Colorbond Ultra. Approx. 517m2, with an allowance of $4000.00 to pack required purlin members to achieve required fall for sheeting.[10] > > (b) new tray flashings to skylights, all penetrations, pop up roof area and barge > > (c) new dektites to all vent pipes/ flue pipes. > > (d) New K flashings as required Replace 900mm x 900mm domes > > (e) new safety mesh and insulation blanket to entire roof area
Replace steel beams and purlins as identified by Engineer.
Clean, prep and paint rusty steel members as outlined by engineer
install framing to facilitate installation of FC Villaboard ceiling.
Remove all existing floor tiles and prepare slab for installation of new tiles apply waterproofing membrane in accordance with current Australian Standards. Supply install porcelain Floor/Skirting tiles to best match existing flooring
B3 - Existing 150PFC Beam to be removed (does not need to be replaced)
Cozens Regan Group Report (CRG Report) July 2022, obtained by Applicant
(c) significant water damage of ceilings and walls and associated mould growth;
(d) loose masonry walls nearby the adjoining roof structure
(a) Works to Steel Framework as outlined on the Structural Diagnostics Plan SK-01 /Pl:
B3 - Existing 150PFC Beam to be removed (does not need to be replaced)
(b) Site measure existing beams and purlins.
(c) Fabrication of new structural items.
(d) Removal of existing area of soffit to gain access.
(e) Removal of damaged beams and installation of new items.
(f) Treatment of purlins and beams as outlined on the project documentation
(g) Removal of a section of roofing from unit 511. ($6,000 + GST)
(h) Reinstate soffits to balconies effected during the works.
(i) Painting to the balcony soffits only.
(j) No works have been allowed within the units.
(a) Identifies serious corrosion of structural steel and purlins
(b) Identifies serious corrosion of roof sheeting and flashings
(c) Recommends replacement of the roof and flashings,
(d) Recommends replacement of purlins where corroded (other than localised surface pitting)
(e) Recommends repair or replacement of steel beams & connections depending on the level of corrosion.
(a) Around skylights, silicone seals have deteriorated and joints to the flashings are poorly sealed
(b) In high winds and heavy rainfall it is likely that water is splashing up underneath the lip
(c) Flashings around ductwork are poorly sealed and ductwork is rusted
(d) Ingress around flue pipes appears to be from deteriorating or missing silicone and during high wind, water is getting underneath the tray flashings due to not being fixed down
(e) tray flashings have approximately 50mm lap whereas a minimum of 100mm lap is recommend.
(f) The tray flashings have also been fixed on the joints only with pop rivets. No fixings have been used to fix the tray flashings to the roof in between the laps of the trays allowing them to lift in winds
(d) Ingress to the "pop up" roof area appears to be entering an a few areas, mainly around the flashing installed to the wall
(e) Ingress was also reported underneath the flashing to the high end of the roof sheeting. They believe this is due to driving wind and rain and insufficient turn up of the roof sheeting.
PART 47-WEATHERPROOFING, DAMP-PROOFING AND FLASHING
47.1 Roofs and Walls. (1) Roofs to be Waterproof. Roofs shall be so constructed as to prevent the penetration of rain or other water to the inner parts of a building.
Where metal sheet roofing without transverse laps is designed and installed in accordance with the relevant provisions of AS 1562, Design and Installation of Self-supporting Metal Roofing without Transverse Laps it shall be deemed to comply with the provisions of By-law 47.l (1).
B3 - Existing 150PFC to be replaced or removed as advised by a qualified engineer
Rust on other beams and purlins should be removed and painted as necessary
(a) changing the roof pitch.
(b) Replacing broken or corroded components of the ceiling suspension system;
(c) Replacing ceilings.
Liability for repairs to Lot 100 pursuant to Section 281of the Act
281 Order to repair damage or reimburse amount paid for carrying out repairs
(1) If the adjudicator is satisfied that the applicant has suffered damage to property
because of a contravention of this Act or the community management
statement, the adjudicator may order the person who the adjudicator believes,
on reasonable grounds, to be responsible for the contravention -
(a) to carry out stated repairs, or have stated repairs carried out, to the
That duty is not one to use reasonable care to maintain and keep in good repair the common property, nor one to use best endeavours to do so, nor one to take reasonable steps to do so, but a strict duty to maintain and keep in repair.
(a) Water damaged plasterboard ceilings and walls
(b) Mouldy paintwork on ceilings and walls
(c) Soiled carpet
(d) Balcony where the ceiling lining has completely collapsed and framework is exposed
(e) Debris on the balcony which appears to be the remnants of the collapsed ceiling
(f) Cracked and lifting tiles
(a) Demolish and dispose of temporary plywood linings to balcony soffit
(b) Demolish and dispose of water damaged wall linings as required
(c) Plastering repairs as required
(d) Re-line walls where demolished
(e) Treatment of water staining to ceilings in living areas
(f) Supply and install new fibre cement soffit linings to balcony
(g) Painting as required
(a) Lot 100 - $2,244.09
(b) Lot 101 - $4,141.29
(c) Lot 102 - $12,725.81
Within 6 months of the date of this order, the Respondent is to perform their statutory duties under section 152(1)(b) of the Act and comply with their imposed obligations with regard to the common property under sections 180(1), 180(2)(a)(ii),(iii) and 180(2)(b) of the Standard Module by carrying out the rectification works and structural repairs to the damaged common property affecting Lot 100, by:
(i) the structural and roofing issues identified in the CRG Report, pursuant to the rectification works as recommended by CRG in the CRG, and
(ii) the roofing issues identified in the RR Report (as concurred by CRG), pursuant to the rectification works as recommended by RR in the RR Report;
(b) Co-ordinating the carrying out of the structural rectification works with the Applicant, the Applicant's engineer (CRG) and other lot owners who are affected by the rectification works to the common property, and at such time that the Respondent perceives that the rectification works are complete:
(i) the Respondent must arrange an inspection with CRG to observe the completed rectification works, for the purposes of assessing any further issues that may prevent the commencement of the internal rectification works to Lot 100; and
(ii) in the event that after the inspection, CRG provide further recommendations that contest the completion of the structural and roofing rectification works to the common property affecting Lot 100, the Applicant and the Respondent must:
A. engage an independent engineer for the purposes of providing an independent report; and
B. pay the costs of obtaining the independent engineer's report, on an equal basis.
Pursuant to Sections 281(1)(a) and 152(1)(b) of the Act, within 6 months of the date of this order, the Respondent is to engage an appropriately qualified professional to carry out the internal repairs to Lot 100, identified in the 6 January 2025 Reflex Property Services (RPS) Quotation numbered 3067 (the estimated fees are $32,092.00 (inclusive of GST)) and such repairs shall be at the cost of the Respondent .
I am of the view that by virtue of the Respondent's contravention of section 152(1)(b) of the Act as stated in Order 1, the Applicant is not in contravention of section 160 of the Act and section 211 of the Standard Module.
[1] The corresponding document for each item is contained in the document bundle marked Annexure "F" to the Application. (see pages 54 to 695 of the "Annexure Bundle").
[8] Ridis v Strata Plan 10308 [2005] NSWCA 246,Seiwa v Strata Plan 35042 [2006] NSWSC
[11] Volume 1 of the NCC 2022, Part 7.2, "Sheet Roofing" provides that sheet roofing must comply with the minimum pitch requirements for the associated roof profile in accordance with Figure 7.2.3. For concealed fastened roofing profile such as Klip Lok, the minimum pitch is 1 degree.
[12] Base Metal thickness in millimetres
[13] The Building Code of Australia 1996 (BCA96) was adopted by Queensland on July 1, 1997.
[14] Lysaght Steel Klip Lok. BMT = Base Metal thickness in millimetres
[15] The Presidents Lodge [2018] QBCCMCmr 226
Morcom and Ors v Campbell-Johnson and Ors [1955] 3 All ER 264 per Denning LJ
No 9 Port Douglas Road [2006] QBCCMCmr 674
[19] See Sydney Trains v Argo Syndicate AMA 1200 [2024] NSWCA 101 at [117] per Leeming JA
Agricultural Land Management Ltd v Jackson [2014] WASC 102 per Edelman J at [429]
[20] E.g. Oceans Mooloolaba [2019] QBCCMCmr 293 at [118]; Stella Grande [2017] QBCCMCmr 556 at [29]; Arti's Villas [2013] QBCCMCmr 330 at [32-33]; Park Avenue Terraces [2010] QBCCMCmr 512; Sanctuary Gardens [2007] QBCCMCmr 678; Klinger v Body Corporate for Costa D'Ora Apartments [2007] QDC 300 at [65]- [70].