[2025] VCAT 635
General information, not legal advice.
Victorian Civil and Administrative Tribunal
2025-07-17
Original judgment source is linked above.
Use of the land for Rural industry (hemp-based mud brick manufacturing)
Approved and endorsed plans - changes required
(a) be prepared to the satisfaction of the Responsible Authority;
(b) be drawn to scale with dimensions;
(c) submitted in electronic form; and
(d) be generally in accordance with the plans forming part of the application and identified as the plans prepared by A&R Little Property Investments Pty Ltd, drawing no. VER-001-R2 dated 9 June 2023 and drawing nos. S102 and S103, dated 21 November 2019, but amended to show the following details:
(i) information regarding the ingredients of the hemp-based mud bricks and the associated manufacturing process;
(ii) fourteen (14) car parking spaces designed in accordance with Clause 52.06-9 (Design Standards); and
(a) be prepared to the satisfaction of the Responsible Authority;
(b) be prepared by a suitably qualified professional;
(c) submitted in electronic form; and
(d) must detail:
(i) management measures of airborne and/or wastewater emissions generated as a result of the hemp processing and product manufacture;
(iii) measures to prevent dust or particulates from affecting adjoining land; and
(iv) biosecurity measures to be implemented during the operation, including how these will be enforced and how any breaches managed and reported.
(a) Monday to Friday: 7:00am - 8:00pm; and
(b) Saturday: 7.00am - 1:00pm.
(a) transport of materials, goods or commodities to or from the land;
(b) appearance of any building, works or materials;
(c) emission of noise, artificial light, vibration, smell, fumes, smoke, vapour, steam, soot, ash, dust, waste water, waste products, grit or oil; or
(d) presence of vermin,
or in any other way, to the satisfaction of the Responsible Authority.
(a) the use does not start within two (2) years after the issue of the permit; or
(b) the use is discontinued for a period of two (2) years.
In accordance with Section 69 of the Planning and Environment Act 1987, an application may be submitted to the Responsible Authority for an extension of the periods referred to in this condition.
[1] The submissions of the parties, any supporting exhibits given at the hearing and the statements of grounds filed have all been considered in the determination of the proceeding. In accordance with the practice of the Tribunal, not all of this material will be cited or referred to in these reasons.
[2] This licence is due for renewal in December 2025.
[4] Through the company A & R Little Property Investments Pty Ltd.
[7] Nesting diagram at clause 73.04-5 'Industry group' of the Scheme.
[8] Submission for the Respondent/Permit Applicant, [17].
[9] VCAT Submission P849/2024 by Emma Todaro also on behalf of Mark Todaro and Heather Arnold, [7].
[13] Submission for the Respondent/Permit Applicant, [70], noting that I have only extracted the row in each table that applies to the proposal.
[14] Submission on behalf of the Responsible Authority, [93].
[15] Architectural Press, First edition 2008.
[16] Professor Peter M.B. Walker, Chambers Cambridge, W & R Chambers Ltd and Chambers University Press 1988.
[17] Submission on behalf of the Responsible Authority, [127.1].
[21] Submission for the Respondent/Permit Applicant, 31 March 2025, [53].
[26] Submission on behalf of Darren Todaro, [4].
[30] National Lifestyle, [10]-[12].
[31] Submission on behalf of Darren Todaro, [37].
[44] Submission on behalf of Darren Todaro, [61].
[50] VCAT Submission P849/2024 by Emma Todaro also on behalf of Mark Todaro and Heather Arnold, [35].
[56] VCAT Submission P849/2024 by Emma Todaro also on behalf of Mark Todaro and Heather Arnold, [70].
[61] With reference to the phrasing used in Collector of Customs v Agfa Gevaert Ltd [1996] HCA 36; (1996) 186 CLR 389.
[62] That were introduced by the Tribunal and accepted by the Council.
[69] Table 1: Vision and future directions / preferred land uses by precinct.
[71] Macquarie Dictionary online edition, Macquarie Dictionary Publishers, Pan Macmillan Australia 2025.
[72] Email from Andrew Little to the Tribunal dated 8 May 2025.
[73] Email from Andrew Little to the Tribunal dated 8 May 2025.
Todaro
Cardinia SC [2025] VCAT 635
(1996) 186 CLR 389