The proposed building work that gives rise to the need for protection work is the construction of a wall on boundary adjacent to the adjoining land identified in this determination in accordance with the architectural and structural plans.
(a) the Subject Wall will be setback 150 millimetres from the boundary;
(b) the Subject Wall will be constructed on a 400-millimetre-thick edge beam (Edge Beam);
(c) the Edge Beam is to be bedded in soil identified as 'Grey Silty Sand' (Founding Material);
(d) once the Founding Material is reached, the remainder of the excavation will be done by hand;
(e) the bottom of the Edge Beam will be at RL 76.15, which is 200 millimetres above the bottom of the bored piers of the footing system of the building on the Adjoining Property;
(f) after the excavation is completed, the soil between (and alongside) the bored piers will be supported by 19-millimetre-thick plywood (Temporary Retaining Wall) supported by star pickets driven to a depth of 1300 millimetres; and
(g) the Edge Beam will then be poured against the Temporary Retaining Wall, which will then be left in place (and become lost formwork).
must be quashed due to material technical deficiencies, procedural deficiencies, conflicts within supporting documentation and as it was predicated on a defective and outdated Form 7 notice.
(a) observation that after they responded to the Form 7, various changes were made to the proposed protection work and those changes:
materially altered the nature, scope, and engineering configuration of the proposed protection work.
These changes involved substantial amendments to design drawings and technical documentation ... and collectively amount to a new or significantly revised protection work proposal.
The failure to issue and serve a revised Form 7 to reflect these amendments constitutes a breach of mandatory procedural requirements under the VBA Practice Notes and undermines the procedural integrity of the determination process.
A declaration that the Form 7 served by the respondent is invalid for failure to include prescribed information and failure to re-serve upon material amendment.
If the RBS is not satisfied that the prescribed information was provided in the Form 7 notice, including that the proposed protection work is not detailed adequately in plans and specifications provided with the Form 7 notice, the RBS should request additional information. The RBS should also require the owner to revise the Form 7 notice and re-serve it on the adjoining owner...
proceed with as little formality and technicality and with as much expedition as the requirements of this Act and the regulations and the proper consideration of the matter before it permit;
Building Permit BSU46641/9290728139949, issued on 10 July 2024, was granted before protection work maters were resolved, in contravention of the Building Act 1993 constitutes a breach of mandatory procedures under VBA Practice Notes. The ongoing delay and lack of agreement on essential protection measures have undermined the insurance provisions now aged over twelve months thereby rendering the permit procedurally deficient and legally unsound.
The Building Permit BSU46641/9290728139949 should be revoked on grounds of procedural impropriety, absence of lawful preconditions for commencement and undermining of the insurance provisions.
An owner who is required by the building regulations to carry out protection work in respect of an adjoining property must not carry out building work giving rise to that requirement until:
(a) the adjoining owner agrees or is taken to have agree to the protection work; or
(b) the matter is determined by the relevant building surveyor under this Part; or
(c) in the case of an appeal to the Building Appeals Board in relation to the matter, the matter is determined by the Building Appeals Board.
until this matter is resolved, no building work will be carried out within two metres of the boundary between the Building Site and the Adjoining Property.
Protection work insurance and dilapidation survey
construction activities persisted unabated and in the absence of a dilapidation survey to document pre-existing site conditions contrary to best practice and protective obligations.
1.1 Permit Issued Without Precondition Fulfilment
Gencon's engineering 4th report ... recommends a structural dilapidation survey due to the elevated risk of over-excavation associated with excavation adjacent to EB1. This measure is intended to monitor potential movement and assess any resultant damage.
If an owner and an adjoining owner cannot agree about how or when a survey is to be carried out under section 94 or about the adequacy of a survey carried out under that section, either of them may refer the matter to the Building Appeals Board.
Retaining wall north and south of boundary wall
Despite repeated requests, no landscaping drawing has been provided. On the southern side of the proposed eastern wall, the site cut is approximately 0.5 m below the adjoining ground level, resulting in observable erosion within the garden bed and raising legitimate concerns regarding future soil movement and potential cracking of the driveway. Accordingly, a permanent retaining wall of minimum 0.5 m in height is required along the affected 8 m length to mitigate these risks and ensure structural stability of the adjoining property driveway...
A sleeper retaining wall is proposed on the north side of eastern wall, based on a drawing revised prior to the construction of the current adjoining dwelling. The proposed excavation for the retaining wall extends 1.7m deep and 450mm in diameter below a 100mm slab supporting a 2-tonne rainwater tank on the adjoining property. This drawing must be revised to reflect actual neighbouring infrastructure and ensure excavation and batering [sic] are appropriately designed to avoid destabilisation...
the construction of a wall on boundary adjacent to the adjoining land...
Appropriateness of the Revised Proposed Protection Work
(a) the Temporary Retaining Wall;
(b) site drainage and moisture management;
(c) lack of protection to the garage wall and roof from falling material; and
(d) inadequate protection of their water tank.
Protection work must be provided by the owner, in relation to an adjoining property, before and during the carrying out of any building work, if the relevant building surveyor determines that protection work is required.
An owner who is required by the building regulations to carry out protection work in respect of an adjoining property before or during the carrying out of building work for which a building permit is required must, before commencing the building work, serve on the owner of the adjoining property and the relevant building surveyor notice of the proposed building work.
An owner who is required by the building regulations to carry out protection work in respect of an adjoining property must not carry out any building work giving rise to that requirement until -
(a) the adjoining owner agrees or is taken to agree to the protection work; or
(b) the matter is determined by the relevant building surveyor under this Part; or
(c) in the case of an appeal to the Building Appeals Board in relation to the matter, the matter is determined by the Building Appeals Board.
The owner must carry out any protection work required by the building regulations -
(a) if the adjoining owner has agreed to the protection work, in accordance with that agreement; or
(b) if the relevant building surveyor has made a determination under this Part in respect of the protection work, in accordance with that determination; or
(c) if the Building Appeals Board has made a determination under Part 10 in respect of the protection work, in accordance with that determination.
(a) specify the nature of protection work to be undertaken;
(b) serve a notice outlining the protection work;
(c) not carry out any building work until protection work is agreed or determined by the BAB; and
(d) carry out the protection work.
An owner must compensate any adjoining owner or adjoining occupier for inconvenience, loss or damage suffered by the adjoining owner or adjoining occupier in connection with the carrying out of protection work under this Part.
Section 98 of the Building Act 1993 provides a mechanism by which an adjoining owner may claim compensation on what is essentially a 'no-fault' basis.
(1) Before the commencement of any protection work, the owner or the owner's agent in company with the adjoining owner or the adjoining owner's agent, must -
(a) make a full and adequate survey of the adjoining property; and
(b) record in writing or by any other means any of the parties desires all existing cracks and defects in the adjoining property.
(2) The record must be signed or otherwise acknowledged as an agreed record of the condition of the adjoining property before the commencement of any protection work.
(3) The record is admissible in evidence in any proceedings relating to the adjoining property and is evidence of the condition of the adjoining property at the time the record was made.[16]
The development proposal fails to include a coherent strategy for managing rainwater runoff and subsurface moisture migration. There are no provisions for ground moisture control or cavity drainage between the two properties,
leaving the adjoining structure vulnerable to dampness, water ingress, and associated structural deterioration.
(a) their property will not be protected from materials that may fall onto the Adjoining Property while the Subject Wall is being constructed; and
(b) they have been provided with a lack of detail as to when and how the Subject Wall will be constructed.
(a) we would not consider the manner of construction of the Subject Wall to be protection work, rather it is simply a detail which the Interested Party is going to have to work out; and
(b) we would not consider boundary protection to be necessary for the construction of a single-storey wall on a boundary.
Worst case, we will have to go with screw piles and suspended slab...
[1] Clause 17 of Schedule 3 to the Building Act 1993 provides: 'Unless the Building Appeals Board otherwise determines, a party to a proceeding before the Board must bear his, her or its own costs'.
[2] There was actually a protracted exchange involving multiple forms and various responses, however we do not consider it necessary to record all of the details of that exchange - it is enough to record that there was at least one form 7, one form 8 and one form 9, all of which were provided within prescribed time frames, enlivening the Building Appeals Board's jurisdiction to review the Respondent's decision.
[3] If the Applicants are taken to have agreed to the Revised Proposed Protection Work, the Building Appeals Board cannot review the Respondent's decision.
[4] Set out in directions and orders dated 8 May 2025.
[9] Indeed, we doubt that a practice note could do so.
[10] As the Victorian building regulator is now known.
[12] We also note that we doubt that the Building Appeals Board has the power to make a declaration.
[13] Building Act 1993, sch 3, cl 15(3)(f).
[16] As noted above, whether an adequate survey has been undertaken is not before us.
[17] Colonial Range Pty Ltd v CES Queen (VIC) Pty Ltd [2016] VSCA 328, [73]. As noted above, the question as to whether the insurance that has been obtained is adequate is not before us.
[18] Not that we make any finding that one was necessary.
�Thomas & Anor
Fernando [2025] VBAB 120;