Accordingly, the owners corporation submits, the Tribunal should order that the respondents must remove the carport structure (making good any damage caused to the common property by its construction or its removal) and go through proper processes if they wish to construct a carport over their car space.
As a consequence, they argue, the proceeding should be dismissed.
(1) whether the installation of the respondents' carport was authorised under the SSM Act, including the by-laws of the strata scheme, including (to the extent relevant) under applicable planning laws; and
(2) if not, then what orders (if any) should be made under section 232 and/or 241 of the SSM Act.
Conditions to install the carport.
• The carport structure should be installed without touching any exterior walls. It should be stand-alone. A minimum of 10cm gap should be left on each side of the wall.
• The carport cannot exceed the parking space allocated to the lot. The length cannot exceed the car park marking lines.
• The carport should not exceed 3mtr in height
• The carport should be installed with the guttering system to avoid water falling directly into the next door wall.
• If the owners corporation contractor requires to access the walls of the units, there should not be any objection from the owner of the carport to permit the contractor to remove the roof. The contractor should ensure the roofing is installed back.
• The roofing material should be colour bond or skylight and the pole and roof colour should match the aesthetic of the existing building.
• No household material or any other material can be stored in the carport.
...
Terms and Conditions that will apply to all approvals
• Anything installed as a result of the carport shall not be, or become, or in any way be construed to be common property and shall always remain the sole property of the owner of the lot which they service, including successors in title;
• The owners of any lot undertaking the installation of the carport must obtain all necessary permits, licenses or consents required by local authority or other statutory or lawful authority for such installation
• the installation of any devices must be effected in a workmanlike manner by licensed and insured tradespersons
• any damage to common property that occurs during, or results from, the installation or subsequent removal or replacement of, or use of, the carport must be forthwith made good by the owners of the lot from which the damage results at no cost to the Owners Corporation;
• the carport must be maintained in good working order and condition by the owner without claim on the owners corporation in respect of such maintenance
• In the event that an owner or occupier of a lot to which the carport has been completed, after notice, fails to comply with any matters set out here of then the Owners Corporation may terminate the right of the owner or occupier to install.
• The Strata Committee or Owners Corporation may impose additional terms and conditions to the granting of approval for carport, including but not limited to; ○ Conditions surrounding noise hand proposed times of work, ○ Provisions for cleaning and removal of debris, ○ Conditions surrounding access to common property for trades, equipment and vehicles. ○ Any other matter relevant to the application.
... [the respondents are] to submit approval for DA submission within 30 days of the AGM date and submit the confirmation to the Strata manager. [Upon] Failure to submit DA application to council, Owners corporation to issue Notice to Comply.
I went out site yesterday Thursday 14th to inspect to see if we could certify the existing carport to [the respondents' lot].
After looking at carport I found several problems that don't meet Council regulations that would allow me to certify this carport.
1. The maximum size of the carport for a townhouse of 300m2 or less is only 20m2. The carport has been installed is 8.5m x 2.9m which is 24.65m2, so doesn't comply with maximum size as per council regulations.
2. The maximum height for a carport can be no larger than 3m. The carport is 2.6m to front but is 3.37m at the rear, so doesn't comply with maximum height as per council regulations.
3. The front setback of a carport is required to be 1m back from front of building line. This carport is actually 2.5m in [front] of building line, so is 3.5m out of where front setback should be.
4. The side set back of the carport is required to be 900 mm from the lot boundary. This carport actually touches the boundary wall of townhouse [...] with design spaces of the carport that is 100 mm of [off] the wall so does not comply with council regulations.
5. At least 2 sides and one-third of the carport's total perimeter must be open. This carport only has the front open so does not comply with council regulations.
Seeing there are so many areas this carport doesn't comply with Blacktown carport regulations, we cannot certify this carport
Each of the problems identified by the builder was illustrated by annotated photographs that were included in the report. One of those photographs also showed that the front of the carport was supported by a post that had been installed into the ground in driveway, and that the carport overhung the driveway area in front of the respondents' car space.
... once the alterations have been made and Council approved the carport the owners corporation will provide approval of the carport.
... should [the respondents] not adhere to the above requirements and make the appropriate alterations by Monday 6th January 2025 the committee agreed on the next step to authorise and instruct [the managing agents] to lodge an application with NCAT to have [the respondents] remove the structure being the car port.
Despite that resolution, the respondents made no alterations to the carport structure. Consequently, the owners corporation lodged its application with the Tribunal on 25 February 2025.
... as if the by-laws--
(a) had been signed and sealed by the owners corporation and each owner and each such ... occupier, and
(b) contained mutual covenants to observe and perform all the provisions of the by-laws.
These are all physical alterations to the common property, even if the car space itself is part of the respondents' lot. Further, the construction of the carport involved ongoing exclusive use of parts of the common property by the carport structure whilst the carport occupied those parts of the common property.
(1) Either the owners corporation or an owner of a lot in the strata scheme may add to, alter, or erect a new structure on, common property for the purpose of improving or enhancing the common property, but only if a special resolution has first been passed by the owners corporation that specifically authorises the taking of the particular action proposed: s 108(1) and (2).
(2) A special resolution that authorises the action to be taken in relation to the common property by an owner of a lot must specify whether the ongoing maintenance of the common property once the action has been taken is the responsibility of the owners corporation or the owner. If the special resolution does not specify who has the ongoing maintenance of the common property concerned, the owners corporation has the responsibility for the ongoing maintenance: s 108(3) and (4).
(3) A special resolution that allows an owner of a lot to take action in relation to certain common property and provides that the ongoing maintenance of that common property after the action is taken is the responsibility of the owner has no effect unless--
(a) the owners corporation obtains the written consent of the owner to the making of a by-law to provide for the maintenance of the common property by the owner, and
(b) the owners corporation makes the by-law: s 108(5).
(4) Sections 143 (2), 144 (2) and (3) and 145 apply to that by-law in the same way as they apply to a common property rights by-law: s 108(7).
a by-law that confers on the owner or owners of a specified lot or lots in the strata scheme--
(a) a right of exclusive use and enjoyment of the whole or any specified part of the common property, or
(b) special privileges in respect of the whole or any specified part of the common property (including, for example, a licence to use the whole or any specified part of the common property in a particular manner or for particular purposes),
or that changes such a by-law.
That is the only provision in the SSM Act that authorises a lot owner to have exclusive use of common property, or special privileges in respect of common property, or special rights of use of common property. Consequently, and given the restriction contained in s 23 of the SSD Act, a lot owner who wishes to have that use or those privileges in respect of a part of the common property (including for the construction and use of a carport) must obtain a common property rights by-law for that use or those privileges.
"A carport must have 2 or more sides open and have not less than one-third of its perimeter open".
2.20 Development standards
(1) The standards specified ... are that the development must-
(a) not result in a building classified under the Building Code of Australia
(b) not have a floor area more than-
(i)-(ii) ...
(iii) for a lot 300m2 or less in any zone - 20m2, and
(c) be not higher than 3m above ground level (existing) and, if attached to an existing single storey dwelling, be not higher than the roof gutter line, and
(d) be located at least 1m behind the building line of any road frontage, and
(e) be located at a distance from each lot boundary of at least-
(i) ...
(ii) for development carried out in any other zone - 900mm, and
(g) to the extent it is comprised of metal components-be constructed of low reflective, factory pre-coloured materials, and
(h) not involve the construction of a new driveway or gutter crossing unless the consent of the relevant road authority for each opening of a public road required for the development has been obtained under the Roads Act 1993
(i) be constructed or installed so that any roofwater is disposed of into the existing stormwater drainage system, and
(j) if it is connected to a fascia-be connected in accordance with a professional engineer's specifications, and
(l) if it is located on bush fire prone land and is less than 5m from a dwelling-be constructed of non-combustible material, and
(m) if it is constructed or installed in a heritage conservation area or a draft heritage conservation area-be located in the rear yard, and
(n) be located so that it does not reduce vehicular access to, or parking or loading or unloading on, or from, the lot.
Note : ...
(2) The roof of the development must be located at least 500mm from each lot boundary.
(3) There must not be more than 1 development-
(a) per lot if there is a dwelling on the lot, or
(b) per lot or per each separate occupation of premises on the lot, whichever is the greater, in any other case.
(1) The approval regime set out in by-law 28 does not reflect the requirements of Parts 6 and 7 of the SSM Act, described above, concerning the conduct of works by a lot owner within common property areas that are vested in the owners corporation, and the granting of common property use rights in respect of common property areas used exclusively by a lot owner, or over which a lot owner is to have special privileges, which are more stringent than the requirements set out in the by-law.
(2) The design requirements of by-law 28 are generally less stringent than the applicable planning law requirements for exempt development (save for the overall height requirement, which is the same): the floor area and setback requirements of the Codes SEPP are all more restrictive than by-law 28 provides. Consequently, the design requirements in by-law 28 largely do not affect the outcome of this case. The Codes SEPP takes priority in most cases. I will come to those requirements shortly.
(1) The simple fact that the respondents were required to obtain the approval of the owners corporation before constructing the carport (which overlaps with the requirements of Parts 6 and 7, discussed below).
(2) The requirement that the carport cannot exceed the parking space allocated to the lot, and that its length cannot exceed the car park marking lines.
(3) The requirement that the carport cannot exceed 3 metres in height.
(4) The requirement that a lot owner who is installing a carport must also obtain all necessary permits, licenses or consents required by the statutory authorities for installation of a carport, which includes development consent from the Council under the EPA Act.
The respondents' carport breaches each of those elements, and was therefore constructed in breach of by-law 28.
(1) The roof and the posts of the carport structure extended outside the bounds of the applicants' lot, and protruded into the common property that is held by the owners corporation.
(2) As set out in the report from Advance Property Services Pty Ltd:
(a) The total area of the carport was 24.65 m2, which exceeded the maximum size allowed for of the carport for a townhouse of 300m2, which was only 20 m2.
(b) The overall height of the carport, which was 3.37 m at the rear of the structure, exceeded the maximum height allowed for a carport, which was only 3m above existing ground level.
(c) The front of the carport was 2.5m in front of the building line of the respondents' lot, and was not set back 1 m back from the building line.
(d) The "spacer" elements along the side of the carport structure touched the boundary wall of the respondents' townhouse. The sides of the structure were otherwise only set back 100 mm from the boundary of the adjoining lot, which was less than the required setback of 500 mm.
(e) Because of the position of the carport between the two townhouses and the fence that marked the edge of the respondents' courtyard, only the (narrow) front of the carport was open. This contravened the requirement in the Codes SEPP, that at least 2 sides and one-third of the carport's total perimeter must be open.
(1) No special resolution was passed by the owners corporation in a general meeting, and no by-law was made by the owners corporation under s 108 of the SSM Act (or, it follows, consented to in writing by the respondents), to permit the respondents to make alterations to the common property areas around the respondents car space that were vested in the owners corporation, by installing the footings and the structural parts of the carport in those common property areas.
(2) No special resolution was passed by the owners corporation in a general meeting, and no common property rights by-law was made by the owners corporation under ss 141-145 of the SSM Act, to permit the respondents to use those same parts of the common property for the purposes of their carport structure.
(1) The effect of sections 108 and 141-145 of the SSM Act is that the owners corporation - not the strata manager, or individual committee members informally - was the proper decision‑maker for any application to install the carport in the common property areas and to give the respondents exclusive use or special privileges (etc) in respect of it.
(2) Informal email consultation with the strata managers acting at the time, and with some committee members, does not amount to an approval by the owners corporation. The respondents therefore did not obtain a proper resolution under the SSM Act before installing the carport. The installation was therefore unauthorised and in breach of the SSM Act.
(3) The respondents did not obtain a proper development approval for the carport under the EPA Act before installing the carport. The installation of the carport was therefore also in breach of the EPA Act.
(1) The respondents must remove the carport constructed in and around the car space of the respondents' lot and the common property of the strata scheme, including all associated pipework, cabling and conduits, within 28 days of the date these orders are made. The respondents must also repair, at their own cost, all damage caused to the common property by the installation or removal of the carport and those associated elements.
(2) The owners corporation is granted leave pursuant to Schedule 4 of the Civil and Administrative Tribunal Act 2013 (NSW), to renew these proceedings within 12 months of the date these orders are made.
I hereby certify that this is a true and accurate record of the reasons for decision of the Civil and Administrative Tribunal of New South Wales.
The Owners �e" Strata Plan No. 85119
Patel [2026] NSWCATCD 5;
(2011) 297 ALR 56