16. The mould is a consequence of the heavy condensation pleaded in paragraph 14 above.
17. The condensation has been caused by the fact that the air conditioning systems installed in the Nursing Home in accordance with the Defendant's design specifications (as per Schedule A to this pleading) were significantly oversized, with 56 out of 61 of the systems being between 130% and 240% of the required sensible capacity such that their dehumidifying capacity was compromised.
18. The mould cannot be eradicated by ad hoc treatment methodologies and its remediation has been resistant to the same.
19. By reason of the condensation and mould, the plaintiff has suffered damages to its premises and consequential loss and damage, as pleaded in paragraph 23 below.
20. The only means of remedying the damage to the Plaintiff's premises caused by the condensation and mould is to remove the air conditioning units and systems and replace them with units and systems of appropriate size and capacity, being those units and systems listed in column H of Schedule A to this pleading."
(a) be as brief as the nature of the case permits; and
(b) contain a statement of all the material facts on which the party relies but not the evidence by which the facts are to be proved; and
(c) state specifically any matter that if not stated specifically may take another party by surprise; and
(d) subject to rule 156, state specifically any relief the party claims; and
(e) if a claim or defence under an Act is relied on - identify the specific provision under the Act.
(2) In a pleading, a party may plead a conclusion of law or raise a point of law if the party also pleads the material facts in support of the conclusion or point.
A party must include in a pleading particulars necessary to -
(a) define the issues for, and prevent surprise at, the trial; and
(b) enable the opposite party to plead; and
(c) support a matter specifically pleaded under rule 150.
(1) A party may apply to the court for an order for further and better particulars of the opposite party's pleading.
(2) The court may, on an application under subrule (1), make the consequential orders and give the directions for the conduct of the proceeding the court considers appropriate.
(3) The making of an application under this rule does not extend the time for pleading.
(4) Particulars required under an order under this rule must repeat the relevant part of the order so the particulars are self-explanatory."
"81(e) The present form of the pleading deals with causation by some combination of [81], [84] and [85]. I do not think that is adequate. The pleading at [81] for example calls up a number of parts of the story of what occurred which, at first blush, do not seem to be relevant to the requisite pleading hypothesis because they refer to conduct which did not involve alleging that the plaintiff was a participant in fraud and, indeed, they refer to conduct not pleaded anywhere to be unlawful means. If such events can be demonstrated to be part of the requisite causation hypothesis, then that is not apparent on the face of the pleading. And the introductory words of [85] are not confined in any way, and they must be.
81(f) The defendants are entitled to have the plaintiff pinned down to a causation hypothesis which is not characterised by imprecision and ambiguity and which, at least arguably, establishes the requisite causal connection between the implementation of the conspiracy and the suffering of loss. If there is more than one causation hypothesis, then the statement just made must apply to each one. The pleading device of merely cross-referring back to events alleged to have happened is unlikely to be a satisfactory way of addressing a proper plea of causation. There must be a direct and unambiguous identification of the material facts relied on to establish the causal link which the law requires. And it must be something which makes narrative sense. The defendants should not be required to cherry pick through the pleading to work out what the case is that they have to meet in this regard."
1. The defendant designed an air conditioning system which was significantly oversized (56 out of 61 systems being between 130% and 240% of required sensible capacity) (paragraph 17);
2. The oversized air conditioning system compromised the dehumidifying capacity of the air conditioning (paragraph 17);
3. The compromised dehumidifying capacity of the air conditioning system caused condensation (paragraph 16);
4. The heavy condensation caused mould (paragraph 16);
5. The mould cannot be eradicated by ad hoc treatment methodologies (paragraph 18);
6. The only means of remedying the damage is to replace the air conditioning system with a system of a capacity listed in Column H of Schedule A of the pleading (paragraph 20);
7. The replacement of the system has caused the plaintiff to suffer damage (paragraph 19).
"In instances where the supply of air quantities are not able to be achieved by balancing or controls, it may be that the units are undersized and other methods will need to be adopted. These might include strategies such as; unit replacement or installation of supplementary systems that can introduce additional air into the supply air stream from the room while bypassing the fan coil units."
"In an air conditioning system, this condensation process occurs inside the unit. Dehumidification is accomplished, by cooling air below the dew point, so that the moisture condenses on the cooling coil within the air conditioning unit installed in the ceiling space. It is then drained appropriately to the nearest tundish. If the temperature of supply air is low enough, and the system runs long enough, the resulting conditioned air will be dry enough to maintain the humidity in the room at a satisfactory level.
The primary finding from our analysis is that it appears that many of the air conditioning systems are significantly oversized (refer Appendix A). Out of 61 air conditioning systems 56 systems were between 130% and 240% of the required sensible capacity.
The consequence of an oversized system is that the ability to dehumidify is compromised. An oversized air conditioning system provides more (but warmer) supply air than a correctly sized system. The warmer supply air is not cooled enough to provide any significant dehumidification.
When the cooling load is less than system capacity, the air conditioning system will run at "part load" (i.e., not at its full capacity) under all conditions. At part load the system can maintain temperature set points, but has almost no dehumidifying capability.
With little or no dehumidification capacity, the result is, moisture levels in the spaces are high enough to cause local condensation and support mould growth."
"The plaintiff objects to paragraph 2(c) of the Request regarding paragraph 17 of the Statement of Claim because it is not a proper request for particulars because:
(a) the particulars requested have been provided in paragraph 17 and Schedule A of the Statement of Claim; and
(b) no further particulars are required in order to satisfy r 149 of the Uniform Civil Procedure Rules 1999.
Without prejudice to this objection, the dehumidifying capacity was compromised (that is, reduced) by each of the said 56 systems being oversized to the extent of 130% to 240% of their required sensible capacity such that the warm air capacity produced by the same was too great for the systems to be able to cool the air to the extent necessary to provide adequate dehumidification (that is, adequate to prevent condensation as pleaded)."
(a) As the larger or oversized air conditioning unit provides a greater air supply, it does so at a higher temperature than a smaller system and so in the larger system, the temperature of the supply air is higher.
(b) The difficulty caused by the higher supply air temperature is that the air is not cooled below its dew point.
(c) As the air is not cooled below its dew point, moisture does not condense on the cooling coil and is not removed.
(d) As moisture is not removed, the dehumidifying capacity of the air conditioner is compromised.
"As to paragraph 3 of the Request regarding paragraph 18 of the Statement of Claim:
(a) the ad hoc treatment methodologies:
(i) comprised of the plaintiff's cleaning the mould, and re-cleaning it as soon as the mould reappeared;
(ii) were performed, as required as the mould appeared or reappeared from December 2016 onwards;
(b) the plaintiff objects to paragraph 3(b) of the Request it is not a proper request for particulars because the pleading is plain on its face and no further particulars are required in order to satisfy rule 149 and rule 157 of the Uniform Civil Procedure Rules 1999; and
(c) the treatment methodologies were "ad hoc" because they were not performed as part of scheduled maintenance, but rather, as indicated in paragraph 6(a)(i) above, as the mould appeared or reappeared from December 2016 onwards."
"As to paragraph 19 of the SOC, full and precise particulars of how the loss and damage claimed at paragraph 23 of the SOC was caused by reason of the condensation and mould including each and every respect in which that condensation and mould was a necessary condition of the occurrence of each head of the loss and damage claimed."
[1] Affidavit of S Naylor filed 7 April 2022, Exhibit SGN 1, exhibit pages 1-6 (Court document 9).
[2] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL-6, exhibit pages 50-54 (Court document 11)
[4] Submissions titled 'Submissions on Behalf of the Applicant Defendant'
[5] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL4, exhibit pages 18-30 (Court document 11).
[6] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL5, exhibit pages 31-49 (Court document 11).
[7] Application filed by defendant on 3 May 2022 (Court document 10).
[8] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL5, exhibit pages 51-52 (Court document 11).
[9] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL7, exhibit pages 57 (Court document 11).
[10] Northpine Pty Ltd v Jezer Constructions Group [1997] 2 Qd R 253 at 264.
[11] Application filed by defendant on 3 May 2022 (Court document 10)
[12] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL7, exhibit page 58 (Court document 11).
[13] Application filed by defendant on 3 May 2022 (Court document 10)
[14] Affidavit of R Leahy filed 3 May 2022, Exhibit RJL7, exhibit page 59 (Court document 11).
[15] Statement of Claim filed 7 October 2020, paragraph 20 (Court document 2).
[16] Application filed by plaintiff on 7 April 2022 (Court document 7).
[17] Defence filed by defendant on 18 December 2020 (Court document 4).
The Corporation of the Franciscan Sisters of the Heart of Jesus (Qld)
FERM Engineering Pty Ltd [2022] QSC 102