[2012] VCAT 520
Victorian Civil and Administrative Tribunal
2012-04-24
Original judgment source is linked above.
Domestic Building, Contract, Defective and Non Compliant work, Damages.
Darko Gorupic (withdrawn from proceeding as of the 9/12/11)
Taylor v Trentwood Homes Pty Ltd (Domestic Building) [2012] VCAT 520
Darco called and said that he had just been talking to Lindsay @ Town & Country about getting assistance with installing expansion joints. He said that Lindsay had advised him that it had gone beyond that. I said to Darko that the only way forward was to lay all the cards on the table. I once again asked Darko to look at the floor. We organised a time of 16.30 that day 16 Feb 10_._
This was the first time I had spoken to Darco reference the floor no longer be repairable on advice from Lindsay @ Town & Country"
"complete removal and re-fitting gutters to comply with stand-off brackets to comply with the relevant codes and good practice".[6]
The above is to be completed and inspected prior to cladding for the framework.
"waterproofing issues which can only be rectified by a modification of the external slab section outside of the brick wall (located under the deck). I propose that the deck be removed and a level is created on the exposed concrete of about 15 degrees then this is coated with two coats of Emerclad to seal the slab edge. The deck can then be reinstated." [7]
Waterproofing and brickwork to rear garage wall. Claim $1,986.50
Mr Gorupic says that Mr Taylor agreed to proceed with the option of chemically treating the untreated trusses on site.
"Please view the attached examples of the exterior of our plan/house"
(i) Whether and to what extent the work, although not in conformity with the contract, is nonetheless serviceable;
(ii) Whether and to what extent the defect has affected the value of the work or the building as a whole;
(iii) The cost of rectification, the proportion that the breach bears to the cost of rectification and whether the cost of rectification would be wholly disproportionate to the real damage suffered by reason of it;
(iv) The likelihood that, if rectification cost is awarded, the sum so ordered will actually be spent on rectification. Obviously, a successful plaintiff can spend his damages as he sees fit but this may be a useful indicator of whether the amount sought is greater than the real loss suffered.
"Had the verge overhangs been equal, it is my view that the entry gable would have looked foreboding and overbearing in proportional terms, albeit a subjective architectural judgment."[11]
Alternative accommodation, removal and storage. Claim $23,210.03
[8] Robinson v Harman (1848) ALL E.R. 383 at 385
Taylor
Trentwood Homes Pty Ltd
(1954) 90 CLR 613
(2009) 253 ALR 1