Planning scheme Tasmanian Planning Scheme - Latrobe
Amendment 2/2024 - Amend the LAT-1.0 Bellfield Industrial Specific Area Plan
Permit LDA-063/2024 - Demolish existing buildings and install internal services and access infrastructure at 16 Port Sorell Road and 6183 Frankford Road, Wesley Vale
The draft amendment is modified under section 40N(1)(b) of the Land Use Planning and Approvals Act 1993 as set out in Annexure A and is approved under section 40Q.
It is determined that the permit cannot be considered by the Commission under section 42A of the Land Use Planning and Approvals Act 1993 as it is not a request to which section 40T(1) relates.
The draft amendment proposes to amend the LAT-1.0 Bellfield Industrial Specific Area Plan (SAP) by:
The permit application provides for the construction of service infrastructure, including the upgrade of an existing vehicle access, extension of a shared private roadway, and provision of stormwater and electricity infrastructure.
The site is comprised of one title, located at 16 Port Sorell Road, Latrobe (folio of the Register 135671/1). The site has an area of 13.87ha and contains a concrete batching plant, single dwelling, associated outbuildings and a dam. The remaining area of the site is used as a paddock. The site has frontages to Port Sorell Road to the north-west, Bass Highway to the south-west and Thompsons Road to the east. The site has direct access to Port Sorell Road.
Additionally, access to Frankford Road is provided via a right of way through 6183 Frankford Road (folio of the register 145641/4) and there is an existing drainage easement parallel to the northern boundary of variable width (1.5m west and 3.0m east of the right of way access).
The site is in the Rural Zone and contains the following overlays:
The site adjoins the existing SAP area which applies to properties to the north, which are also in the Rural Zone. The existing SAP has an area of 16.3ha. The draft amendment proposes to expand the SAP area to include the site as Precinct D, which would increase the size of the SAP area to 30.17ha.
Surrounding land is in the Rural Zone, Agriculture Zone and Rural Living Zone, and is characterised by a combination of commercial, residential and agriculture land uses. Opposite the site (to the north west of the Port Sorell Road/Piping Lane junction) is the LAT-P4.0 Particular Purpose Zone - Piping Lane Business Park, which aims to provide for a mix of industrial and commercial activities.
Two representations were received. One was from the applicant, which proposed changes to the following clauses of the draft amendment:
In its representation the applicant also provided comments on condition 3 of the draft permit.
The second representation raised concerns regarding traffic generated by future development allowable under the draft amendment and whether the site would be connected to reticulated services.
The planning authority advised that the draft amendment was referred to TasWater under sections 56S and 56O of the Water and Sewerage Industry Act 2008. TasWater did not provide a response.
Planning authority's response to the representations
The planning authority considered the representations at its meeting on 12 August 2024 and made the following resolution on the draft amendment and permit:
a) modify the report submitted under Recommendation 1 if a request or a direction for further information is received from the Tasmanian Planning Commission; and > > b) represent the planning authority at hearings of the Tasmanian Planning Commission pursuant to Section 40L of the Land Use Planning & Approvals Act 1993.
The hearing was held at the Latrobe Council office at 170 Gilbert Street, Latrobe on 3 December 2024.
At the request of the parties, a reconvened hearing was held at the Commission's office at 144 Macquarie Street, Hobart on 8 August 2025.
Planning authority: Ms Jo Oliver, Consultant Town Planner
Applicant's experts: Mr Mark Walters, 6ty° Pty Ltd (Stormwater)
Mr Richard Burke, Traffic and Civil Services (Traffic)
Planning authority: Ms Jo Oliver, Consultant Town Planner
Applicant's experts: Mr Mark Walters, 6ty° Pty Ltd (Stormwater)
(a) contains all the provisions that the SPPs specify must be contained in an LPS; and
(b) is in accordance with section 32; and
(c) furthers the objectives set out in Schedule 1; and
(d) is consistent with each State policy; and
(da) satisfies the relevant criteria in relation to the TPPs; and
(e) as far as practicable, is consistent with the regional land use strategy, if any, for the regional area in which is situated the land to which the relevant planning instrument relates; and
(f) has regard to the strategic plan, prepared under section 66 of the Local Government Act 1993, that applies in relation to the land to which the relevant planning instrument relates; and
(g) as far as practicable, is consistent with and co-ordinated with any LPSs that apply to municipal areas that are adjacent to the municipal area to which the relevant planning instrument relates; and
(h) has regard to the safety requirements set out in the standards prescribed under the Gas Safety Act 2019.
(a) a use or development to which the provision relates is of significant social, economic or environmental benefit to the State, a region or a municipal area; or
(b) the area of land has particular environmental, economic, social or spatial qualities that require provisions, that are unique to the area of land, to apply to the land in substitution for, or in addition to, or modification of, the provisions of the SPPs.
It is a well-established economic principal that industry is best served close to settlements, employment centres and arterial transport routes in order to draw potential employees and to reduce the transaction costs of freight movement. (p. 43)
The SAP requires vehicular access to be from Frankford Road, and in any event there would be significant constraints in obtaining access for industrial development from Port Sorell Road, Thompsons Road or the Bass Highway. (p. 17)
The relatively targeted range of uses proposed ensure that the subject site would not directly compete with future industrial development within the identified regionally significant precinct... (p. 36)
The growth of an established precinct adjacent to a major arterial freight route, to meet the specific demands for larger land areas serving particular industry sectors, directly supports the objective and strategies of the Strategic Plan (p. 59)
State Policy on the Protection of Agricultural Land 2009
... the site does drain directly to a watercourse that traverses a number of agricultural properties before merging with Pardoe Creek, which discharges to Pardoe Beach on the northern coast (p. 44).
Resource Management and Planning System Objectives
To ensure that the effects on the environment are considered and provide for explicit consideration of social and economic effects when decisions are made about the use and development of land; and ...
Modified amendment 2/2024 to the Tasmanian Planning Scheme - Latrobe

LAT-S1.0 Bellfield Industrial Specific Area Plan
The purpose of the Bellfield Industrial Specific Area Plan is:
LAT-S1.1.1 To provide limited opportunities for industrial use and development in a rural location that:
(a) relies upon the site's locational advantage in proximity to the State Highway and rail networks and the Devonport air and seaports; or
(b) for Precinct D:
(i) does not compromise adjoining and nearby sensitive uses; or
(ii) may capitalise on co-location and association with uses in the Bellfield SAP precincts.
LAT-S1.1.2 To provide for industrial use and development in Precinct D that requires larger operational areas due to the nature and scale of the use.
LAT-S1.1.3 That sites are only accessed from a constructed access to Frankford Road. In Precinct D, to provide for access, location of buildings, landscaped visual buffers and infrastructure in accordance with the Bellfield Development Plan.
LAT-S1.1.4 In Precinct D ensure that on-site management of stormwater drainage and wastewater for new development areas protects the downstream environment.
LAT-S1.1.5 Use and development does not adversely impact views from the State road network or adjacent land.
LAT-S1.2.1 The specific area plan applies to the area of land designated as Bellfield Industrial Specific Area Plan on the overlay maps and in Figure LAT-S1.1.
LAT-S1.2.2 In the area of land this plan applies to, the provisions of the specific area plan are in substitution for, and are in addition to, the provisions of the Rural Zone, as specified in the relevant provision.
This clause is not used in this specific area plan.
LAT-S1.4.1 In this specific area plan, unless the contrary intention appears:
This clause is in substation for Rural Zone - Clause 20.2 Use Table.
(a) in Precinct B, Precinct C or Precinct D; and
(b) for wholesale of building materials, construction aggregates, garden and landscape materials or rural supplies.
(a) not Permitted; and
(b) in Precinct B or Precinct D.
This clause is in substitution for Rural Zone - clause 20.3.1 Discretionary Use A2 and P2.
(a) in Precincts A, B and C is to be without competition, displacement, conflict or interference from other use within the rural zone.
(b) in Precinct D:
(i) are appropriate for the rural location and rely upon proximity to the State Highway and Devonport air and sea ports;
(ii) do not confine or restrain the operation of uses on adjacent properties; and
(iii) require a larger area for industrial use and development, or relies on an operational relationship with an established use or requires a location distant from sensitive use.
(a) be appropriate for the location, having regard to:
(i) nature, scale, and intensity of the use;
(ii) operational characteristics;
(iii) likely impact of traffic composition, volume, and frequency on operation and safety of the road network;
(iv) measures to minimise likely adverse impact on existing and potential:
- manufacturing, processing, service, storage, and transport activities on land within the boundaries of the Bellfield Industrial Specific Area Plan; and
- use of land beyond the boundaries of the Bellfield Industrial Specific Area Plan; and
(b) in Precinct D, rely on:
(i) a larger area of land to accommodate:
- product storage and display;
- loading and unloading;
- potential emissions, including any buffers to emissions, or
- manoeuvrability of large/heavy vehicles; or
(ii) support another use, or uses, established in the Bellfield Industrial Specific Area Plan; or
(iii) a location distant from sensitive uses.
This clause is in addition to Rural Zone - clause 20.3 Use Standards.
That each use of land within Precinct D, excluding Resource Development, relies on larger development areas, relies on locational advantages, or supports other uses in the Bellfield Industrial Specific Area Plan.
Development area in Precinct D, excluding minor utilities and Resource Development, is not less than 5000m².
A use in Precinct D must require a development area that is appropriate for the use, having regard to:
(a) operational characteristics, nature and scale of the use, and the need to locate in close proximity to primary freight routes;
(b) whether the use supports another use, or uses, established in the Bellfield Industrial Specific Area Plan; or
(c) the need for a location distant from sensitive uses.
LAT-S1.6.3 Stormwater and wastewater management within Precinct D
This clause is in addition to Rural Zone - clause 20.3 Use Standards.
Stormwater, wastewater and drainage runoff is to be managed to provide for appropriate quality of water discharged from the site into receiving watercourses.
A use in Precinct D must be accompanied by a stormwater and wastewater management plan approved by the planning authority.
The stormwater and wastewater treatment system is consistent with the approved plan.
That uses incorporate treatment systems and devices to manage stormwater runoff and drainage water quality, including wastewater, for sediment and pollutants relevant to the specific use.
Use must manage the treatment of stormwater, drainage and wastewater particular to the use having regard to:
(a) the type and quantity of emissions;
(b) the degree of exposure to weather;
(c) the type of treatment;
(d) processes for waste storage and removal; and
(e) management processes if utilising land outside of the development area.
This clause is in addition to Rural Zone - clause 20.3 Use Standards.
That uses within Precinct D do not cause an unreasonable loss of amenity to existing residential uses.
Hours of operation of a use in Precinct D, excluding minor utilities, within the amenity buffer measured 50m from adjacent lots containing residential uses, shown in Figure LAT-S1.2, must be within the hours of:
(a) 7.00am to 9.00pm Monday to Saturday; and
(b) 8.00am to 9.00pm Sunday and public holidays.
Hours of operation of a use in Precinct D, excluding minor utilities, must not cause an unreasonable loss of amenity to residential use, having regard to:
(a) the timing, duration or extent of vehicle movements; and
(b) noise, lighting or other emissions.
This clause is in addition to Rural Zone - clause 20.3 Use Standards.
To require upgrades to Frankford Road and the vehicle crossing to be undertaken prior to the commencement of a use within Precinct D.
A use within Precinct D, excluding minor utilities and Resource Development, must be:
(a) accessed from Frankford Road; and
(b) the access and the vehicle crossing works must have been completed generally in accordance with Figure LAT-S1.3 and Figure LAT-S1.4; or
(c) The upgrades to Frankford Road and the vehicle crossing, generally accordance with Figure LAT-S1.3 and Figure LAT-S1.4, must be completed to the satisfaction of the road authority prior to the commencement of the use.
A use within Precinct D, excluding minor utilities, must be subsequent to upgrades to Frankford Road and the vehicle crossing, and must minimise any adverse effects on the road and vehicle crossing, having regard to:
(a) any increase in traffic caused by the use;
(b) the nature of the traffic generated by the use;
(c) the nature of the road;
(d) traffic interactions at the vehicle crossing;
(e) any traffic impact assessment; and
(f) any advice received from the road authority.
LAT-S1.7 Development Standards for Buildings and Works
This clause is in addition to Rural Zone - clause 20.4 Development Standards for Buildings and Works.
(a) vehicular circulation and access in Precinct D is suitable for its intended purpose;
(b) an appropriate setback of buildings to roads and adjoining land; and
(c) includes suitable landscape buffering and screening along Precinct D frontages.
Vehicular access to and from land within Precinct D must be provided by means of an extension of the existing right of way at a minimum of 9m width, located within Precinct A.
The private access way within Precinct D is in accordance with:
(a) Figure LAT-S1.2 Development Plan; or
(b) an alignment that includes:
(i) a minimum width of 8m; and
(ii) a turning circle with a minimum outer diameter of 30m for a turning circle on a dead-end section.
Each individual development area with Precinct D, excluding for minor utilities, must abut the private access way for a minimum width of 10m.
Each individual development area within Precinct D, excluding minor utilities, must connect with the private access way to provide convenient, safe and efficient vehicular access, having regard to the ability for vehicles to manoeuvre on-site.
The walls of a building must be in accordance with the setbacks identified in Figure LAT-S1.2.
The walls of a building must be sited having regard to:
(a) prevailing setbacks of existing and approved buildings;
(b) separation between the road and the building to provide a sufficient buffer or screen the site from a road; and
(c) include measures to screen and attenuate visual impact of the site to view from a road and from land outside the boundaries of the land to which the Bellfield Industrial Specific Area Plan applies.
In Precinct D, a 7.5m wide landscape buffer in accordance with Figure LAT-S1.2 must:
(a) be planted in its entirety, concurrent with the establishment of a development area;
(b) be landscaped with vegetation to screen views into the site from the adjacent road; and
(c) achieve a height of not less than 6 metres, except for that part of the buffer that is within the Electricity Transmission Corridor - Inner Protection Area, where the height must not be less than 3 metres.
This clause is in substitution for Rural Zone - clause 20.4.1 Building height, and clause 20.4.2 Setbacks A1 and P1.
That development has minimal visual impact when viewed from the road network beyond the boundaries of the Bellfield Industrial Specific Area Plan.
The visual impact of building height is minimised, having regard to:
(a) the degree of screening provided by the landscape buffer shown in Figure LAT-S1.2 or any existing or additional vegetation screening;
(b) the degree to which development impacts the skyline;
(c) mitigation provided through materials and finishes;
(d) topography; and
(e) the degree to which the development integrates with other buildings within the Bellfield Industrial Specific Area Plan.
Site coverage of a development area must be not more than 50%.
Electricity reticulation and site connections must be installed underground.
It must be impractical or unreasonable to install electricity reticulation and site connections underground.
External materials other than natural stone, earth, timber or glass must be finished in 1 or more of the following colours as defined in Australian Standard AS 2700 - 1996, Colour Standards for General Purposes:
(a) B53 Dark Blue Grey;
(b) G63 Deep Bronze Green;
(c) N65 Graphite Grey;
(d) N52 Mid Grey;
(e) N54 Basalt;
(f) Y61 Black Olive;
(g) G15 Rain Forest Green; or
(h) N64 Dark Grey.
External colours must complement the surrounding environment.
This clause is in addition to Rural Zone - clause 20.4 Development Standards for Buildings and Works.
External lighting is not to cause loss of amenity to road users, the Devonport airport, or of a use on adjacent land.
External lighting must be hooded and directed so as not to cause:
(a) overspill onto adjacent land or onto Port Sorell Road, Bass Highway or Frankford Road; and
(b) interference to air safety at Devonport Airport.
LAT-S1.7.4 Stormwater and wastewater management within Precinct D
This clause is in addition to Rural Zone - clause 20.4 Development Standards for Buildings and Works.
(a) prevent nuisance downstream of the discharge point; and
(b) manage water quality to protect the downstream environment.
A Stormwater and Wastewater Management Plan for the full extent of Precinct D, is prepared by a suitably qualified person and approved by the planning authority, that provides for:
(a) on-site detention of stormwater from development meeting the following parameters:
(i) the discharge rate is no greater than the pre-development flow rate for events between the 20% and the 1% AEP storm event; and
(ii) all development areas are serviced by:
- a shared private system consisting of a linear detention basin as shown in Figure LAT-S1.2 and pipe network, catering for each development area being developed up to 85% coverage of the land by buildings and hardstands; or
- a combination of a shared private system and detention within individual development areas to a total 85% coverage of the land by buildings and hardstands;
(b) treatment systems and devices to manage stormwater runoff and drainage water quality, including wastewater, for sediment and specified pollutants anticipated for the range of uses, prior to discharge from the overall site, and includes:
(i) gully/sediment traps;
(ii) triple interceptors;
(iii) proprietary interceptors for fuel and oil;
(iv) proprietary interceptors for detergents;
(v) on-site wastewater treatment confined to each development area; and
(c) ongoing management and maintenance of on-site stormwater and water quality controls.
Development in Precinct D is consistent with the approved Stormwater and Wastewater Management Plan for:
(a) shared, or combined shared and development specific stormwater detention; or
(b) where the area of building and hardstand for an individual development is less than the approved Stormwater Management Plan, stormwater detention storage is provided so that the discharge rate from the development area is no greater than the pre-development flow rate for events between the 20% and the 1% AEP storm event; and
(c) treatment systems and devices for management of sediment and pollutants.
Development in Precinct D that is not consistent with the approved Stormwater and Wastewater Management Plan must independently manage and dispose of stormwater runoff through treatment systems and devices incorporated into the development area, designed by a suitably qualified person, that provides for:
(a) additional stormwater detention storage so that the discharge rate from the development area is no greater than the pre-development flow rate for events between the 20% and the 1% AEP storm event; and
(b) appropriate surface drainage to prevent nuisance on adjoining development areas.
Within Precinct D treatment systems and devices are incorporated into the development area to manage the quality of stormwater, wastewater and drainage runoff quality for pollutants relevant to the specific use, prior to discharge to the private stormwater pipe network or surface drainage, to mitigate adverse downstream environmental impacts.
This clause is in substitution for Rural Zone - clause 20.5.1 Lot design.
The minimum properties of each lot, or a lot proposed in a plan of subdivision are to:
(a) provide a suitable development area for the intended use; and
(b) provide access from a road.
Each lot, or a lot proposed in a plan of subdivision, must have an area of not less than 5000m².
Each lot, or a lot proposed in a plan of subdivision, must:
(a) provide a landscape buffer area with a width of not less than 7.5m along a frontage; and
(b) provide a landscape buffer area with a width of not less than 10m along any boundary to land to which the Bellfield Industrial Specific Area Plan does not apply.
The landscape buffer area must be landscaped and treated to assist screening of development to view from a road or from land to which the Bellfield Industrial Specific Area Plan does not apply by retention, replacement, or provision of trees or plantings of a type consistent with the established vegetation character of adjacent land.
This clause is not used in this specific area plan.
Figure LAT-S1.1 Bellfield Industrial Specific Area Plan